Livrables
Two systems tested at a system level and shipped to TAS-I and TAS-F
Three systems tested at a system level and shipped to TAS-I and TAS-F - PU
Project communication and dissemination plan.
Lessons learnt and R&T roadmapLessons learnt and R&T roadmap - PU
Design Description Document, ICD detailsProject communication and dissemination plan final report
Set of I3DS building blocks & peripherals user manuals
Set of I3DS building blocks & peripherals user manuals - PU
Use-case identification reportPublications
Auteurs:
Vincent Dubanchet, Sabrina Andiappane
Publié dans:
I-Sairas 2018, 2018
Éditeur:
I-Sairas 2018
Auteurs:
Kristoffer Nyborg Gregertsen, Michael Walshe, Joseph Purnell, Philip Perryman, Roger Ward
Publié dans:
DASIA 2018, 2018
Éditeur:
DASIA 2018
Auteurs:
Juan Manuel Rodriguez Bejarano
Publié dans:
I-Sairas 2018, 2018
Éditeur:
I-Sairas 2018
Auteurs:
Sabrina Andiappane, Vincent Dubanchet
Publié dans:
IAC 2018, Numéro 1 per year, 2018
Éditeur:
IAC
Auteurs:
Antonio Scannapieco, Luke Feetham
Publié dans:
IAC 2018, Numéro 1 per year, 2018
Éditeur:
IAC
Auteurs:
Chris Van Djik
Publié dans:
IAC 2018, Numéro 1 per year, 2018
Éditeur:
IAC
Auteurs:
Antonio Scannapieco
Publié dans:
IAC 2018, Numéro 1 per year, 2018
Éditeur:
IAC
Auteurs:
Trine Kirkhus
Publié dans:
Applied Industrial Optics 2018, 2018
Éditeur:
Applied Industrial Optics
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible