Objetivo
The interstate integration of power grids provides multiple advantages concerning operation security, integration of renewable energy as well as energy trading. Due to this fact the UCTE interconnection expands continually since its establishment. Consideration is given to different scenarios of joint operation of UCTE and NORDEL with power grids on the territory of the former USSR. Due to the fact that such an interconnection is second to none in the World in terms of the scale and distance of the interconnection and number of countries involved, strong R&D and innovations are urgently required along with the recent development of technologies. Bulk power grids may encounter major blackouts, which originate in increasing complication in monitoring, operation and control of interconnected power grids as well as in limited knowledge of the total system state. Therefore the possible future interconnection between the European and Russian electricity transmission systems requires elaborating methods for monitoring, control and protection of large scale systems and especially for the support of their interconnections. The development and prototypically implementation of these new methods and tools is the major goal of the ICOEUR project. New technologies like Wide Area Monitoring, Control and Protection as well as advanced network controllers (FACTS) and HVDC systems will be considered. Envisioned ICOEUR goals can be achieved only in close cooperative work of experts, with extensive knowledge of EU and Russian power systems as well as manufacturers and network operators. The ICOEUR consortium involves leading experts in all these domains and guarantees efficient collaboration and knowledge required for testing the methodologies developed. The joint development of innovative monitoring, simulation and control concepts, tools and equipment through international diversified ICOEUR consortium and their prototype implementation will promote their adoptions.
Ámbito científico
Palabras clave
Convocatoria de propuestas
FP7-ENERGY-2008-RUSSIA
Consulte otros proyectos de esta convocatoria
Régimen de financiación
CP - Collaborative project (generic)Coordinador
44227 Dortmund
Alemania
Ver en el mapa
Participantes (21)
664033 IRKUTSK
Ver en el mapa
20134 Milano
Ver en el mapa
B15 2TT Birmingham
Ver en el mapa
1015 Lausanne
Ver en el mapa
12616 Tallinn
Ver en el mapa
1048 Riga
Ver en el mapa
La participación finalizó
721 83 VASTERAS
Ver en el mapa
10129 Torino
Ver en el mapa
117997 MOSCOW
Ver en el mapa
194223 St. Petersburg
Ver en el mapa
111250 MOSCOW
Ver en el mapa
117630 MOSCOW
Ver en el mapa
1000 Ljubljana
Ver en el mapa
1000 Ljubljana
Ver en el mapa
630099 NOVOSIBIRSK
Ver en el mapa
00156 Roma
Ver en el mapa
06100 Bahcelievler - ANKARA
Ver en el mapa
125040 MOSCOW
Ver en el mapa
1000 BRUXELLES
Ver en el mapa
1000 Brussels
Ver en el mapa
1006 Riga
Ver en el mapa