Cel
The interstate integration of power grids provides multiple advantages concerning operation security, integration of renewable energy as well as energy trading. Due to this fact the UCTE interconnection expands continually since its establishment. Consideration is given to different scenarios of joint operation of UCTE and NORDEL with power grids on the territory of the former USSR. Due to the fact that such an interconnection is second to none in the World in terms of the scale and distance of the interconnection and number of countries involved, strong R&D and innovations are urgently required along with the recent development of technologies. Bulk power grids may encounter major blackouts, which originate in increasing complication in monitoring, operation and control of interconnected power grids as well as in limited knowledge of the total system state. Therefore the possible future interconnection between the European and Russian electricity transmission systems requires elaborating methods for monitoring, control and protection of large scale systems and especially for the support of their interconnections. The development and prototypically implementation of these new methods and tools is the major goal of the ICOEUR project. New technologies like Wide Area Monitoring, Control and Protection as well as advanced network controllers (FACTS) and HVDC systems will be considered. Envisioned ICOEUR goals can be achieved only in close cooperative work of experts, with extensive knowledge of EU and Russian power systems as well as manufacturers and network operators. The ICOEUR consortium involves leading experts in all these domains and guarantees efficient collaboration and knowledge required for testing the methodologies developed. The joint development of innovative monitoring, simulation and control concepts, tools and equipment through international diversified ICOEUR consortium and their prototype implementation will promote their adoptions.
Dziedzina nauki
Słowa kluczowe
Zaproszenie do składania wniosków
FP7-ENERGY-2008-RUSSIA
Zobacz inne projekty w ramach tego zaproszenia
System finansowania
CP - Collaborative project (generic)Koordynator
44227 Dortmund
Niemcy
Zobacz na mapie
Uczestnicy (21)
664033 IRKUTSK
Zobacz na mapie
20134 Milano
Zobacz na mapie
B15 2TT Birmingham
Zobacz na mapie
1015 Lausanne
Zobacz na mapie
12616 Tallinn
Zobacz na mapie
1048 Riga
Zobacz na mapie
Zakończenie uczestnictwa
721 83 Vasteras
Zobacz na mapie
10129 Torino
Zobacz na mapie
117997 MOSCOW
Zobacz na mapie
194223 St. Petersburg
Zobacz na mapie
111250 MOSCOW
Zobacz na mapie
117630 MOSCOW
Zobacz na mapie
1000 Ljubljana
Zobacz na mapie
1000 Ljubljana
Zobacz na mapie
630099 NOVOSIBIRSK
Zobacz na mapie
00156 Roma
Zobacz na mapie
06100 Bahcelievler - ANKARA
Zobacz na mapie
125040 MOSCOW
Zobacz na mapie
1000 BRUXELLES
Zobacz na mapie
1000 Brussels
Zobacz na mapie
1006 Riga
Zobacz na mapie