Building Green and Climate Neutral City-Hubs

CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.

Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.

Leistungen

Monitoring report 1

Summary of the progress and advancements of CLIMABOROUGH identified impacts, classified on five specific sustainability pillars: Environment, Economy, Society, Institution, Policies. This is related to T1.5.

Reference Architecture for CLIMABOROUGH Platform

This deliverable will define the architecture, the building blocks and the standards, as well as the requirements, the blockers, the plans, the critical gaps etc.of the CLIMABOROUGH platform. It is related to T2.1.

Baseline analyses

This deliverable reports a1 baseline analysis for each of the pilot cities developing the Climate Sandbox concept. It is related to T5.1.

Monitoring tool of CLIMABOROUGH project

The Monitoring Tool has the scope to define a common framework of KPIs to measure the project impacts and to guide urban planning strategies towards Climate Neutrality. This is related to T1.1, T1.2 and T1.3.

Challenge Solutions 1

This deliverable defines more specific detail on the practical solutions that have been co-created; transferred from leader to follower; and successfully (or not) moved to the market

Open Market Consultation Documentation 1

This document reports the framework and plan the activities associated with the launch of the open market consultations. It is the output of T4.1.

Technical Report on Platform Development and Deployment

This deliverable will report the preparation of the platform integration plan using input from WP32 about the requirements. It is related to T2.2.

Innovation Assessment Report

The deliverable will identify current state, challenges, priorities, blockers, emerging plans, critical gaps etc. It is related to T3.1.

Dissemination and communication plan

This document is released at early project stage including the definition of the dissemination and communication infrastructure of the project (T6.1 and T6.2).

Gender requirements for public procurement, evaluation and urban executive plans

This document will report the gender requirements for the public procurement activities, evaluation and for the elaboration of the Urban executive plans.

List of Awarded Proposals 1

This document reports the awarded proposals of the first cycle of public procurement (leader cities). It is the output of T4.4 with the contents described therein. (Leader: ANCI; R, PU, M18, M40)

Innovative Procurement Tender Documentation 1

This document reports the legal documentation required for the 8 innovative procurement calls. It is the output of T4.2 with the contents described therein.

Data Management Plan 1

Deliverable issued in three versions during the project’s lifetime, complying with both Open Access and GDPR provisions.

Data Management Plan 2

This deliverable is the second version of the three versions issued during the project’s lifetime, complying with both Open Access and GDPR provisions.

Inception Report

The inception report will report the pilot operation plans of CLIMABOROUGH Cities. This is a living document related to T3.2 and T3.3 and it will be conducted in relation with WP2 and WP5. This document will report the follower cities pilot operations plan from M24.