Risultati finali
Plan for research data handling
Preliminary emission saving analysis of TPs if compared with fossilbased HC systems T61
Quality Assurance Plan (Task 1.1)A plan for project quality risk innovation and gender equality management Will be revised during the project lifetime when needed At least every 6 months
Dissemination strategy and results (Task 7.2)Report including the dissemination activities carried out towards HAPPENING relevant industrial sectors
System design-Italian demo (Task 4.2)specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42
Ethic and gender issues consideration report (Task 1.3)Report for assessing the ethic and gender issues related to the project
Project Management Plan (Task 1.1)plan containing a Gantt chart and work breakdown structure including a schedule per task with responsible partners use of resources related subtasks related deliverables and dependencies to other tasks
System design-Spanish demo (Task 4.2)specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42
Monitoring methodology implementation in Austria (Task 3.2)Description of the transversal data monitoring methodology applied in the Austrian demo
Energy performance Guarantee planning & implementation guideline (Task 5.1)Development of energy performance guarantee planning and implementation guideline
End-user requirements and building constraints-Italian demo (Task 4.1)Analysis of the current status of the demo building and definition of boundary conditions T41
Communication strategy and results of the first activities (Task 7.1)Report including the definition of the Communication methodology and approach to reach the different target groups
Energy storage modelling and capacity optimization (Task 2.2 - Subtask 2.2.3)detailed modelling of suitable energy storage for the system focused on TES and resulting in optimized sizing
Technologies social and market acceptance (Task 6.1)Analysis of the current level of acceptance and social awareness of innovative HAPPENING concept T61
HAPPENING dissemination and communication work and results (Task 7.3)Information will be gathered about the dissemination and communication activities carried out ant the obtained measurable results
Monitoring concept definition of HAPPENING system (Task 3.1)Report including the definition of the KPIs presentation of summarised master data general and individual monitoring concepts
End-user requirements and building constraints-Austrian demo (Task 4.1)Analysis of the current status of the demo building and definition of boundary conditions T41
End-user requirements and building constraints-Spanish demo (Task 4.1)Analysis of the current status of the demo building and definition of boundary conditions T41
Monitoring methodology implementation in Italy (Task 3.2)Description of the transversal data monitoring methodology applied in the Italian demo
Review of normative and legislation (Task 2.1 - Subtask 2.1.1)assessment of regulatory framework impacting directly on the specifications of the devices involved in the system
System design-Austrian demo (Task 4.2)specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile