Skip to main content
European Commission logo
italiano italiano
CORDIS - Risultati della ricerca dell’UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

HeAt PumPs in existing multi-family buildings for achieving union's ENergy and envIromeNtal Goals

Risultati finali

Technologies benefit impact in terms of emissions (Task 6.1)

Preliminary emission saving analysis of TPs if compared with fossilbased HC systems T61

Quality Assurance Plan (Task 1.1)

A plan for project quality risk innovation and gender equality management Will be revised during the project lifetime when needed At least every 6 months

Dissemination strategy and results (Task 7.2)

Report including the dissemination activities carried out towards HAPPENING relevant industrial sectors

System design-Italian demo (Task 4.2)

specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42

Ethic and gender issues consideration report (Task 1.3)

Report for assessing the ethic and gender issues related to the project

Project Management Plan (Task 1.1)

plan containing a Gantt chart and work breakdown structure including a schedule per task with responsible partners use of resources related subtasks related deliverables and dependencies to other tasks

System design-Spanish demo (Task 4.2)

specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42

Monitoring methodology implementation in Austria (Task 3.2)

Description of the transversal data monitoring methodology applied in the Austrian demo

Energy performance Guarantee planning & implementation guideline (Task 5.1)

Development of energy performance guarantee planning and implementation guideline

End-user requirements and building constraints-Italian demo (Task 4.1)

Analysis of the current status of the demo building and definition of boundary conditions T41

Communication strategy and results of the first activities (Task 7.1)

Report including the definition of the Communication methodology and approach to reach the different target groups

Energy storage modelling and capacity optimization (Task 2.2 - Subtask 2.2.3)

detailed modelling of suitable energy storage for the system focused on TES and resulting in optimized sizing

Technologies social and market acceptance (Task 6.1)

Analysis of the current level of acceptance and social awareness of innovative HAPPENING concept T61

HAPPENING dissemination and communication work and results (Task 7.3)

Information will be gathered about the dissemination and communication activities carried out ant the obtained measurable results

Monitoring concept definition of HAPPENING system (Task 3.1)

Report including the definition of the KPIs presentation of summarised master data general and individual monitoring concepts

End-user requirements and building constraints-Austrian demo (Task 4.1)

Analysis of the current status of the demo building and definition of boundary conditions T41

End-user requirements and building constraints-Spanish demo (Task 4.1)

Analysis of the current status of the demo building and definition of boundary conditions T41

Monitoring methodology implementation in Italy (Task 3.2)

Description of the transversal data monitoring methodology applied in the Italian demo

Review of normative and legislation (Task 2.1 - Subtask 2.1.1)

assessment of regulatory framework impacting directly on the specifications of the devices involved in the system

System design-Austrian demo (Task 4.2)

specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile