HeAt PumPs in existing multi-family buildings for achieving union's ENergy and envIromeNtal Goals

CORDIS provides links to public deliverables and publications of HORIZON projects.

Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .

Deliverables

Overall results analysis (Task 3.4)

Report on the evaluation of the main KPIs for the three demo sites

Technologies benefit impact in terms of emissions (Task 6.1)

Preliminary emission saving analysis of TPs if compared with fossilbased HC systems T61

Quality Assurance Plan (Task 1.1)

A plan for project quality risk innovation and gender equality management Will be revised during the project lifetime when needed At least every 6 months

Dissemination strategy and results (Task 7.2)

Report including the dissemination activities carried out towards HAPPENING relevant industrial sectors

System design-Italian demo (Task 4.2)

specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42

Ethic and gender issues consideration report (Task 1.3)

Report for assessing the ethic and gender issues related to the project

Techno economic assessment - Italian demo (Task 4.4)

assessment of the techno-economic results corresponding to the whole demonstration process (T4.4)

Measurement and Verification (M&V) Plan of Happening system (Task 5.1)

Definition of M&V plan for HAPPENING system

Project Management Plan (Task 1.1)

plan containing a Gantt chart and work breakdown structure including a schedule per task with responsible partners use of resources related subtasks related deliverables and dependencies to other tasks

Report on current standardization and non-technical barriers for HAPPENING replication (Task 6.4)

Analysis of standards to be compliant to and non-technical barriers to be overcome for a prompt marketability for TPs and technologies (T6.4)

System design-Spanish demo (Task 4.2)

specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42

Monitoring methodology implementation in Austria (Task 3.2)

Description of the transversal data monitoring methodology applied in the Austrian demo

Techno economic assessment - Spanish demo (Task 4.4)

assessment of the techno-economic results corresponding to the whole demonstration process (T4.4)

Energy performance Guarantee planning & implementation guideline (Task 5.1)

Development of energy performance guarantee planning and implementation guideline

End-user requirements and building constraints-Italian demo (Task 4.1)

Analysis of the current status of the demo building and definition of boundary conditions T41

Business and Plan involving social/market aspects (Task 6.1 & 6.2)

Business value proposition of the TPs and technologies also including social and marketing aspects to foster H&C renovation (T6.1 & T6.2)

Communication strategy and results of the first activities (Task 7.1)

Report including the definition of the Communication methodology and approach to reach the different target groups

Techno economic assessment - Austrian demo (Task 4.4)

assessment of the techno-economic results corresponding to the whole demonstration process (T4.4)

Quality assurance analysis of HAPPENING system (Task 5.2)

Energy performance of the HAPPENING thermal system verification and analysis.

Energy storage modelling and capacity optimization (Task 2.2 - Subtask 2.2.3)

detailed modelling of suitable energy storage for the system focused on TES and resulting in optimized sizing

Technologies social and market acceptance (Task 6.1)

Analysis of the current level of acceptance and social awareness of innovative HAPPENING concept T61

HAPPENING dissemination and communication work and results (Task 7.3)

Information will be gathered about the dissemination and communication activities carried out ant the obtained measurable results

HAPPENING dissemination and communication work and results 2 (Task 7.3)

Information will be gathered about the dissemination and communication activities carried out ant the obtained measurable results (update)

Monitoring concept definition of HAPPENING system (Task 3.1)

Report including the definition of the KPIs presentation of summarised master data general and individual monitoring concepts

Results of numerical analysis of HAPPENING system performance (Task 2.3)

assessment of general applicability of HAPPENING system into various conditions

End-user requirements and building constraints-Austrian demo (Task 4.1)

Analysis of the current status of the demo building and definition of boundary conditions T41

HAPPENING system design guideline (Task 5.3)

Design guideline development for HAPPENING system

Technical manuals and instructions (Task 5.4)

Technical manuals and instructions, report.

End-user requirements and building constraints-Spanish demo (Task 4.1)

Analysis of the current status of the demo building and definition of boundary conditions T41

Monitoring methodology implementation in Italy (Task 3.2)

Description of the transversal data monitoring methodology applied in the Italian demo

Monitoring methodology implementation in Spain (Task 3.2)

Description of the transversal data monitoring methodology applied in the Spanish demo

Review of normative and legislation (Task 2.1 - Subtask 2.1.1)

assessment of regulatory framework impacting directly on the specifications of the devices involved in the system

System design-Austrian demo (Task 4.2)

specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42

E-Handbook with guidelines for integration of the solutions in public and private, tertiary and residential buildings (Task 6.3)

Lessons learnt from the whole project for future replication of the outcomes (T6.3)

Publications

An Evolutionary Algorithm-Based Model Predictive Control for Combined Electrical and Thermal Energy Systems

Author(s): Sarah Noye, Asier Urueña Andreu, Ruben Mulero Martinez, Ricardo Alonso Segade, Angel Carrera Martin
Published in: Computing in Construction, Proceedings of the 2024 European Conference on Computing in Construction, Issue 5, 2024
Publisher: European Council for Computing in Construction
DOI: 10.35490/ec3.2024.241

Laboratory characterization of a cascade heat pump system with intermediate water loop

Author(s): Diego Menegon, Matteo Campidelli, Roberto Fedrizzi
Published in: 14th IEA Heat Pump Conference, Issue 761, 2023
Publisher: IEA HPT

A dynamic programming based method for optimal control of a cascaded heat pump system with thermal energy storage

Author(s): Tim Diller, Anton Soppelsa, Himanshu Nagpal, Roberto Fedrizzi, Gregor Henze
Published in: Optimization and Engineering, Issue 25, 2024, Page(s) 229-251, ISSN 1389-4420
Publisher: Kluwer Academic Publishers
DOI: 10.1007/s11081-023-09853-5