CORDIS fournit des liens vers les livrables publics et les publications des projets HORIZON.
Les liens vers les livrables et les publications des projets du 7e PC, ainsi que les liens vers certains types de résultats spécifiques tels que les jeux de données et les logiciels, sont récupérés dynamiquement sur OpenAIRE .
Livrables
BioSFerA website able to connect the different actors involved and inform them about updates, news and coming events. Related Tasks: T8.2
The first draft of the DMP will be prepared by M6 and it will be updated whenever significant changes arise and as a minimum at M18, M36 and M48. Related Tasks: T1.2
Report on communication and dissemination activities [M12, M18, M24, M30, M36, M42] Related Tasks: T8.2
Report on selected evaluation indicatorsThe identification of a targeted set of key performance indicators that will be served for the evaluation of the proposed concept. Related Tasks: T2.2
Full process basic definitionProcess simulations to solve heat and mass balances for the overall process acting as a benchmark for the following lab and pilot activities. Related Tasks: T2.5
Bench scale gasification test at TRL4The selected feedstocks are gasified in order to validate the feedstock compatibility at TRL 4. The most suitable feedstock will be selected for the following pilot runs Related Tasks: T3.1
Stakeholders requirements and market needsAn analysis to define the stakeholders(technology providers, feedstock suppliers, refineries, fuel traders, final end-users, etc.) requirements and specifications will be performed. Related Tasks: T2.1
Determination of the main input parameters for the case studiesInput data regarding the feedstock supply chain, as well as preliminary information gathering for the implementation of the techno-economic analysis. Related Tasks: T2.4
Analysis of selected feedstockAiming to indicate the most promising biomass feedstock as concerns the potential capacity and its price. Fuel characterization consisting of the proximate, ultimate analysis, ash composition and fusibility, for the selected types of feedstock. Related Tasks: T2.3
Project Communication/Dissemination & Strategy Plan (PCSP)A Communication/Dissemination & Strategy Plan will be developed and continuously updated if needed throughout the entire duration of the project. Related Tasks: T8.1
Publications
Auteurs:
José L. García, Beatriz Galán
Publié dans:
Applied Microbiology International, Numéro 15(1), 2021, ISSN 1365-2672
Éditeur:
John Wiley & Sons, Ltd
DOI:
10.1111/1751-7915.13991
Auteurs:
Christian Frilund, Ilkka Hiltunen, Pekka Simell
Publié dans:
ChemEngineering, Numéro 5/2, 2021, Page(s) 23, ISSN 2305-7084
Éditeur:
MDPI
DOI:
10.3390/chemengineering5020023
Auteurs:
Vasiliki Gavidou, Nikolaos Detsios, Konstantinos Atsonios, Panagiotis Grammelis
Publié dans:
GCGW-2021-9th Global Conference on Global Warming, Numéro 7.3, 2021
Éditeur:
GCGW-2021
Auteurs:
Nikolaos Detsios, Leda Maragoudaki, Konstantinos A Atsonios Ville Nikkanen, Raul Piñero, Jose Mª Sanz Martín, Karel De Winter, Elodie Vlaeminck, Panagiotis Grammelis, Nikolaos G. Orfanoudakis
Publié dans:
34th International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems , ECOS 2021, Numéro 155, 2021
Éditeur:
ECOS 2021 Organizing Committee
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible