CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
BioSFerA website able to connect the different actors involved and inform them about updates, news and coming events. Related Tasks: T8.2
The first draft of the DMP will be prepared by M6 and it will be updated whenever significant changes arise and as a minimum at M18, M36 and M48. Related Tasks: T1.2
Report on communication and dissemination activities [M12, M18, M24, M30, M36, M42] Related Tasks: T8.2
Report on selected evaluation indicatorsThe identification of a targeted set of key performance indicators that will be served for the evaluation of the proposed concept. Related Tasks: T2.2
Full process basic definitionProcess simulations to solve heat and mass balances for the overall process acting as a benchmark for the following lab and pilot activities. Related Tasks: T2.5
Bench scale gasification test at TRL4The selected feedstocks are gasified in order to validate the feedstock compatibility at TRL 4. The most suitable feedstock will be selected for the following pilot runs Related Tasks: T3.1
Stakeholders requirements and market needsAn analysis to define the stakeholders(technology providers, feedstock suppliers, refineries, fuel traders, final end-users, etc.) requirements and specifications will be performed. Related Tasks: T2.1
Determination of the main input parameters for the case studiesInput data regarding the feedstock supply chain, as well as preliminary information gathering for the implementation of the techno-economic analysis. Related Tasks: T2.4
Analysis of selected feedstockAiming to indicate the most promising biomass feedstock as concerns the potential capacity and its price. Fuel characterization consisting of the proximate, ultimate analysis, ash composition and fusibility, for the selected types of feedstock. Related Tasks: T2.3
Project Communication/Dissemination & Strategy Plan (PCSP)A Communication/Dissemination & Strategy Plan will be developed and continuously updated if needed throughout the entire duration of the project. Related Tasks: T8.1
Publicaciones
Autores:
José L. García, Beatriz Galán
Publicado en:
Applied Microbiology International, Edición 15(1), 2021, ISSN 1365-2672
Editor:
John Wiley & Sons, Ltd
DOI:
10.1111/1751-7915.13991
Autores:
Christian Frilund, Ilkka Hiltunen, Pekka Simell
Publicado en:
ChemEngineering, Edición 5/2, 2021, Página(s) 23, ISSN 2305-7084
Editor:
MDPI
DOI:
10.3390/chemengineering5020023
Autores:
Vasiliki Gavidou, Nikolaos Detsios, Konstantinos Atsonios, Panagiotis Grammelis
Publicado en:
GCGW-2021-9th Global Conference on Global Warming, Edición 7.3, 2021
Editor:
GCGW-2021
Autores:
Nikolaos Detsios, Leda Maragoudaki, Konstantinos A Atsonios Ville Nikkanen, Raul Piñero, Jose Mª Sanz Martín, Karel De Winter, Elodie Vlaeminck, Panagiotis Grammelis, Nikolaos G. Orfanoudakis
Publicado en:
34th International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems , ECOS 2021, Edición 155, 2021
Editor:
ECOS 2021 Organizing Committee
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles