CORDIS oferuje możliwość skorzystania z odnośników do publicznie dostępnych publikacji i rezultatów projektów realizowanych w ramach programów ramowych HORYZONT.
Odnośniki do rezultatów i publikacji związanych z poszczególnymi projektami 7PR, a także odnośniki do niektórych konkretnych kategorii wyników, takich jak zbiory danych i oprogramowanie, są dynamicznie pobierane z systemu OpenAIRE .
Rezultaty
This deliverable will identify enabling technologies applicable to incentivize consumers participation to energy marketplace in order to make consumer flexibility available for TSO and DSO. For some of those, identified as high potential game-changer technologies, related requirements and correspondent specification will be defined for the application in the context of the pan-European platform for flexibility services. This deliverable is linked to task 2.6.
D6.3 Economic assessment of proposed coordination schemes and products for grid servicesThis deliverable will analyse the economic implications of the proposed coordination schemes and products For that purpose it will identify the impacts both at system level for the three countries involved in the demonstrations and for each of the actors involved in the business case in a second moredetailed analysis It is linked to task 63
D7.3.1-3 Stakeholder Forum Report: Three successive versions (annual update) on proceedings of the workshops and other activities carried out within the year (D7.3.1, M12, D7.3.2, M24, D7.3.3, M42)These three deliverables will be annual reports on the activities of the Stakeholder Forum (SF) in this project. The first one (7.3.1) will be delivered on M18 and report on the establishment and first six month of activities of the SF. The second (7.3.2) and third ones (7.3.3) will be delivered respectively on M30 and M42 and report on the activities of the two last years of activities of the SF. These deliverables are linked to task 7.3.
D3.7 Final Spanish Demo report: Results and Analysis of the Full-scale DemonstrationThis deliverable will analyze the performance indicators calculated form the results of the second demonstration phase in order to evaluate the overall pilot concept and the solutions developed in the Spanish demos
D7.7.3 Proceedings of Final Conference in BrusselsThis deliverable comes in addition to D772 It will be a thorough report on the proceedings of the Final Conference including the This deliverable is linked to task 77
D5.2 Report on Software Development ActivitiesThis deliverable will provide a simulation-based evaluation of the missing links - which could not be tested in the demonstrators - in the identified relevant combinations of products for grid services and coordination scheme(s) in terms of economic and technical KPIs and will thus complement the evaluation provided within D6.1. It is linked to task 6.2.
D5.7 Report on Adaptation and Modification activitiesThis report described the corrective actions for handling the errors identified in the Phase 1 testing.
D4.5 Report on Lessons learned, bug fixes and adjustments in products and routinesThis deliverable will report on lessons learned, bug fixes and adjustments in products and routines in the test demonstration that will be used in large-scale demonstration. This is linked to T4.5.
D7.4.2 Final exploitation plan validated by all partiesIn this deliverable the Project will be consolidate all the individual exploitable results considering all the findings relevant for commercial exploitation and market takeup
D5.9 Report on EvaluationThis reports includes the evaluation of the Phase 2 Testing according to the evaluation procedures described in Task 51
D2.1 Markets for DSO and TSO procurement of innovative grid services: Specification of the architecture, operation and clearing algorithmsThis deliverable will coordinate the procurement schemes for different products considering the nature of the product including the specification of technical requirements, the existing market platforms and regulatory framework. The overall system architecture will be defined for the different demos. This deliverable is linked with the different demos’ specifications tasks: T3.2, T4.2 and T5.2.
D7.7.1 Communication kit for Final Conference in BrusselsThe deliverable gathers all products developed with a view fostering communication for the Final Conference A communication kit will be prepared to ensure a proper dissemination of the results Among others it will include leaflets video factsheets and webbased infographics This deliverable is linked to task 77
D7.1.2 Project website publicly available, intranet operationalThis deliverable consists in creating the project website, specifying the public and private interfaces, access to the different deliverables and presentations, management of internal and external communication channels, among other functionalities.
D3.6 Analysis and results of real data from operations (Part 2)This deliverable will provide final results after the full testing phase This deliverable will demonstrate the feasibility and advantages of using demand side resources for providing services to DSOs and TSOs This deliverable is linked to task 36
D2.4 Interoperable platforms for procuring energy services from consumers, storage and generators: specification of the interfaces linking the markets for grid services, the advanced monitoring tools for grid operation and the flexibility providedThis deliverable will specify the data models and formal data exchnages in processes dealing with market communications and operational planing systems. It will formally cover the payloads and non functional requirements imposed by the aspect of energy services procurement.
D7.2.1 Agreement on a common position paper with related projects in the same callThis deliverable aims to provide an agreement between the CoordiNET project and the other project selected in the same call topic, namely the INTERRFACE project, on complementarity to develop and potential overlap to avoid in the conduct of the two projects. This deliverable will pave the way for D7.2.2 and D7.2.3. It is linked to task 7.2.
D1.2 User and Customer-engagement plan: validated plan for users' recruitment and operation of the cascading fundsThis deliverable will provide the main guidelines for the Demonstration Leaders to recruit end used as well to distribute cascading funds.
D7.7.2 Press release on Final Conference in BrusselsThis deliverable is a press release that will be drafted to widely circulate the results of the final conference in a fast and efficient manner This deliverable is linked to task 77
D1.5 Business use case : Business use case definitionThe deliverable includes description of Business Use Cases for each Demonstration site according to the selected coordination scheme. The description will be based on the IEC 92559 standard.
D6.5 Overall generic blue-print architecture for dissemination excluding the internal architectures of the demonstration sitesOverall generic blueprint architecture for dissemination excluding the internal architectures of the demonstration sites This deliverable will provide the architecture and implementation guidelines for an integrated market platform documenting the processes possible roles for actors technical interfaces as well as generic requirements for the platform to be used in the context of legislation in different member countries It is linked to task 65
D7.3.3 Stakeholder Forum Report: Three successive versions (annual update) on proceedings of the workshops and other activities carried out within the year (D7.3.1, M12, D7.3.2, M24, D7.3.3, M42)Description to be updated
D7.2.3 Common position paper with related projects in the same callThis deliverable will be based on the framework elaborated in deliverables 721 and 722 Based on the findings and results of the CoordiNET and INTERRFACE projects it aims to provide policy recommendations mainly at European level to lift obstacles identified and deploy the solutions elaborated in these two projects It is linked to task 72
D5.6 Report on Phase 1 Testing activitiesThis deliverable includes the results of the Phase 1 testing activities. The evaluation will consider the evaluation plan prepared in task 5.1. The main goal of this phase is to identify errors and bugs of the software
D1.3 scenarios and products:Definition of scenarios and products for the demonstration campaignsThis deliverable will provide a detailed description of the coordination schemes and the standardised products that will be tested in the demonstration sites.
D4.7.2 Final Swedish Demo report: Results and Analysis of the Full-scale DemonstrationThis deliverable will report on results and lessons learned of the swedish demonstration in a wider perspective This is linked to T47
D2.3 Aggregation of large-scale and small-scale assets connected to the electricity network: specification of the aggregation and disaggregation algorithms and market bidding strategiesThe deliverable will define the requirements for building the aggregation and disaggregation algorithms to be used by aggregators in the context of the pan-European platform for ancillary services. It should contain minimum requirements, desirable requirements and optional requirements. It is linked to task 2.4.
D1.4 DER characteristics for the transaction model alternatives: definition of the main characteristics of the best DER candidates for market products to be testedThis deliverable will list the main technical characteristics of DER related to be considered in the development of services and products of CoordiNET
D5.1 Demonstration PlanThe demonstration plan includes all the necessary details for the development and deployment of the solutions, the user engagement plan and the evaluation plan. More specific it includes 4 section: - Overview of Demo, Architecture Definition and Objectives Definitions - Detailed Demonstration Plan - User Engagement Plan, Privacy Monitoring and Crisis - Evaluation Plan
D4.7.1Results and Analysis of the Full-scale DemonstrationThis deliverable will report on results and analysis of the fullscale demonstration This is linked to T 47
D1.6 List of KPIs: KPI and process of measuresThe deliverable will list the Key Performance indicators for each demo site following the EEGI methodology. The evaluation will cover technical, environmental and economic aspects.
D6.2 Evaluation of combinations of coordination schemes and products for grid services based on market simulationsThis deliverable will provide a simulationbased evaluation of the missing links which could not be tested in the demonstrators in the identified relevant combinations of products for grid services and coordination schemes in terms of economic and technical KPIs and will thus complement the evaluation provided within D61 It is linked to task 62
D7.4.1 - Principles on exploitation plan agreed by all partiesThis deliverable contains the main aspects to be considered for the final exploitation plan to be delivered at the end of the Project This deliverables will consider the inputs already identified in D711 and the results of the first three exploitation workshops foreseen at Months M12 M24 and M36
D8.5 Protection of Personal DataD8.5 – Protections of Personal Data This deliverable will be defined for the Protection of Personal Data of all the members of the consortium that form the CoordiNet Project
D7.6 Connection with Bridge dutiesThis deliverable will collect the main points of the periodic meetings during the project. The objective of these coordination meetings (also called BRIDGE Initiative) is to gather information from other EU projects on the Smart Grid demonstration. This deliverable is linked to task 7.6
D1.1 Market and regulatory Analysis: Analysis of current market and regulatory framework in the involved areasThis deliverable will describe the current markets mechanisms and regulatory framework of the different areas involved in the project at both national level as well as the European-wide initiatives, including proposals and new legislation: Clean Energy Package, Network Codes, and Regional Initiatives. Furthermore, this deliverable will contrast the state-of the art proposals to improve the status-quo in the collaboration between TSOs and DSOs. This deliverable will be link with other tasks, mainly T.1.3 and T2.1.
D2.6 Creation of service overview for the DSO interactions: Documentation of services providedThis deliverable will provide final results after the full testing phase This deliverable will demonstrate the feasibility and advantages of using demand side resources for providing services to DSOs and TSOs This deliverable is linked to task 36
D6.7 Roadmap towards a new market design including the implementation standardized products for grid servicesThis deliverable is the final deliverable of WP6 and will include a set of recommendations for regulatory arrangements and adaptations to the current market design to enable TSOs and DSOs to procure the considered standardized products for grid services in a coordinated manner across Europe
D3.1 Report on functionalities and servicesThis deliverable will describe the technical specification of the Spanish demos to evaluate the different coordination schemes, including the services that will be tested, the software and hardware functionalities, control and communication requirements. Furthermore, it will include the network specificities and tasks that will be carried out by TSOs and DSOs. Finally, it will specific the KPIs and case studies for the different locations and services. This deliverable is linked with the rest of tasks of WP3
D4.4 Finalized demo run: small scale, in order to test functionality of SW and HW and products and routinesThis deliverable presents results from the first demo run about functionality, products, customer recruitment, software and hardware performance. This is linked to T 4.4
D6.4 Scalability and replicability analysis of the market platform and standardized productsThis deliverable will report on the main findings of the Scalability and Replicability Analysis and will include a set of rules on how to replicate the proposed solutions ie the market platform and standardized products at the national level but also within other EU countries It is linked to task 64
D3.5 Evaluation of preliminary conclusion from demo runThis deliverable will analyze the performance indicators calculated from the results of the first phase in the demonstration in order to have a first evaluation of the overall pilot concept and the solutions developed The results will be used as input to the second testing phase and to WP2 and WP6 of the project In this way other WPs will be able to make progress in their respective tasks with real data and lessons learned from the initial phase of the demonstration campaign
D7.3.2 Stakeholder Forum Report: Three successive versions (annual update) on proceedings of the workshops and other activities carried out within the year (D7.3.1, M12, D7.3.2, M24, D7.3.3, M42)To be updated
D5.8 Report on Phase 2 TestingThis reports includes the results of the final testing of the CoordiNET solution as well a list of the collected data
D7.2.2 Agreement on content on a common position paper with related projects in the same callThis deliverable will be based on deliverable 7.2.1, and on the existing assumptions, findings and recommendations expected by the two projects. It aims to draft a first structure and propose some ideas of content for the final position paper co-drafted with the INTERRFACE project. It is linked to task 7.2.
D5.3 Report on Hardware Deployment ActivitiesThis report includes a description of the activities related to the hardware deployment including problems in the installations and their corrective actions.
D6.1 Ex-post evaluation of the demonstrationsThis deliverable will include an evaluation of the tested combinations of products for grid services and coordination schemes for each of the demonstrations in terms of economic and technical KPIs as identified in WP1 It is linked to task 61
D2.2 Advanced network monitoring and operation tools: Specification for improved DSO-TSO collaboration to increase observability and optimise operationsThis deliverable will list the generic requirements for the monitoring of distribution and transmission network monitoring. Furthermore these tool will assist the operators to quantify the needs of flexibility
D6.6 Ex-post customers' perception and engagement assessment of the demonstrationsThis deliverable will report on the evaluation of the customer engagement and perception after the demonstrations based on complementary approaches ie the analysis of demonstration data interviews and online questionnaires The main characteristics of industries and sectors that facilitate DERs to provide the grid services considered within the project and recommendations for improved customer engagement including incentives will be reported It is linked to task 66
D7.1.1 Communication, dissemination and exploitation plan (D7.1a, b, c at M12, 24, 36)This deliverable will present the communication and dissemination plan, including the creation of a project website and social media announcements, detailed list of conferences and scientific publications where the different activities are expected to present the most relevant results. Target groups workshop and stakeholders meetings will be key to put forward the main results. This deliverable sets the communication strategies for the whole project. A preliminary individual exploitation plan will be included.
D4.6 Finalized Full-Scale Demonstration including all sites, all customers and all functionality.This deliverable will describe the full scale demo with regard to functionality products customer engagement software and hardware performance This is linked to T46
D4.1 Site specific product portfolio to be used in Northern lights (including contracts, routines and business models)This deliverable will describe site specific product portfolio to be used in the four demonstration sites (including contracts, routines and business models). This deliverable is linked to T1
This deliverable will Manage the Data. Data Management Plan is a structural activity that identifies the data that should be the subject of dissemination and exploitation activities. This deliverable will include, Publications and Repository of demo data. This deliverable is linked to task 7.5
This deliverable will provide a first list of results after the first testing phase. This deliverable will identify all the equipment and software tools developed. This deliverable is linked to task 3.4
Publikacje
Autorzy:
Leonard Burg, Gonca Gürses-Tran , Reinhard Madlener and Antonello Monti
Opublikowane w:
Energies, 2021
Wydawca:
MDPI
DOI:
10.3390/en14217128
Autorzy:
Nikos Hatziargyriou; Dimitris Trakas; Aris Dimeas; Eirini Leonikdaki; Emanouel Voumvoulakis; Markos Champakis
Opublikowane w:
Cigred, 2020
Wydawca:
Cigred
DOI:
10.5281/zenodo.5289837
Autorzy:
Anibal Sanjab, Yuting Mou, Ana Virag, and Kris Kessels
Opublikowane w:
CIRED 2021, 2021
Wydawca:
CIRED
Autorzy:
Orlando Valarezo, Jose Pablo Chaves Avila, Joni Rossi, Emil Hillberg, Marco Baron
Opublikowane w:
2021 IEEE Madrid PowerTech, 2021, Strona(/y) 1-6, ISBN 978-1-6654-3597-0
Wydawca:
IEEE
DOI:
10.1109/powertech46648.2021.9495089
Autorzy:
Carlos Madina, Inés Gómez-Arriola, Maider Santos-Mugica, Joseba Jimeno, Kris Kessels, José Pablo Chaves, Dimitris Trakas, Yvonne Ruwaida
Opublikowane w:
EEM 2020, 2020
Wydawca:
EEM
DOI:
10.1109/eem49802.2020.9221890https://explore.openaire.eu/search/publication?articleid=od______2659
Autorzy:
Ruwaida, Yvonne; Backe, John; Bjarup, David ,
Opublikowane w:
CIRED 2019 Conference, 2019, Strona(/y) 583, ISBN 978-2-9602415-0-1
Wydawca:
AIM
DOI:
10.34890/156
Autorzy:
M. C. Sousounis; P. Dratsas; C. Kaskouras; A. Bachoumis; C. Dikaiakos; G. Papaioannou
Opublikowane w:
Cigre, Numer April 2, 2020, 2020
Wydawca:
Cigre
DOI:
10.5281/zenodo.5289386
Autorzy:
Gonca Gürses-Tran, Antonello Monti
Opublikowane w:
Forecasting, 2022
Wydawca:
MDPI
DOI:
10.3390/forecast4020028
Autorzy:
Gonca Gürses-Tran, Antonello Monti, Janka Vanschoenwinkel, Kris Kessels, José Pablo Chaves-Ávila, Leandro Lind
Opublikowane w:
CIRED 2020, Numer September 22, 2020, 2020
Wydawca:
CIRED
DOI:
10.1049/oap-cired.2021.0188
Autorzy:
Gonca Gurses-Tran; Hendrik Flamme; Antonello Monti
Opublikowane w:
PMAPS 2020, 2020, ISBN 978-1-7281-2822-1
Wydawca:
IEEE
Autorzy:
Luciana Marques; Anibal Sanjab; Yuting Mou; Hélène Le Cadre; Kris Kessels
Opublikowane w:
IEEE Transactions on Smart Grid, 2022
Wydawca:
IEEE
Autorzy:
Yvonne Ruwaida, Nicholas Etherden, Niclas Damsgaard, Christoffer Isendahl
Opublikowane w:
CIRED 2020, Numer September 22, 2019, 2020
Wydawca:
CIRED
DOI:
10.1049/oap-cired.2021.0238
Autorzy:
F. David Martín Utrilla, Daniel Davi-Arderius, Alberto Gil Martínez, José Pablo Chaves-Ávila, Inés Gómez Arriola
Opublikowane w:
CIRED 2020, Numer September 22, 2020, 2020
Wydawca:
CIRED
DOI:
10.5281/zenodo.5293138
Autorzy:
M. SANTOS-MUGICA - ES, I. GOMEZ-ARRIOLA - ES, J. JIMENO - ES, C. MADINA - ES
Opublikowane w:
2020
Wydawca:
CIGRE
Autorzy:
C. Madina, M. Santos-Mugica, I. Gomez-Arriola, J. Jimeno, K. Kessels, A. Delnooz, D. Trakas, J.P. Chaves, K. Merckx, G. Gürses-Tran
Opublikowane w:
CIGRE 2021, 2021
Wydawca:
CIGRE 2021
Autorzy:
Anibal Sanjab; Hélène Le Cadre; Yuting Mou
Opublikowane w:
IEEE Transactions on Power Systems, 2022
Wydawca:
IEEE
Autorzy:
Ruwaida, Y; C. Madina,I. Gomez-Arriola,K. Kessels, D. Trakas, J.P. Chaves, G. Gürses-Tran, M Troncia, A. Sanjab, N. Etherden
Opublikowane w:
IEEE Transacations in Power System, 2022
Wydawca:
IEEE
Autorzy:
Rodríguez Pérez, Néstor; Matanza Domingo, Javier; López López, Gregorio; Chaves Avila, Jose Pablo; Bosco, Ferdinando; Croce, Vincenzo; Kukk,Kalle; Uslar, Mathias; Madina, Carlos; Santos-Mugica, Maider
Opublikowane w:
IEEE Transactions on Smart Grid, 2022
Wydawca:
IEEE
DOI:
10.1109/tsg.2022.3206092
Autorzy:
Carlos Madina, Pirkko Kuusela, Marco Rossi, Hamid Aghaie
Opublikowane w:
2019 16th International Conference on the European Energy Market (EEM), 2019, Strona(/y) 1-6, ISBN 978-1-7281-1257-2
Wydawca:
IEEE
DOI:
10.1109/eem.2019.8916308
Autorzy:
Gonca Gürses-Tran, Tobias Alexander Körner, Antonello Monti
Opublikowane w:
PSCC Conference 2022 + Elsevier Electric Power Systems Research Journal, 2021
Wydawca:
Elsevier
Wyszukiwanie danych OpenAIRE...
Podczas wyszukiwania danych OpenAIRE wystąpił błąd
Brak wyników