Risultati finali
D 3.3. Preliminary performance report (month 15) A monitoring and controlling report will be supplied about results obtained with Task 3.4, including the prototype performance description during first commissioning. It will be useful for detecting limits and problems to be solved and to go beyond during WP4.
Performance evaluation reportD 5.3 Performance evaluation report (month 23) This report will include EffiCOIL performance results, technical details of the operational parameters, as well as samples of manufactured parts.
D 3.2. EffiCOIL prototype (month 13) EffiCOIL prototype running will be shown as a demonstration. EC personnel will be welcomed to visit PRODUTECH facilities and will check EffiCOIL operation.
D 5.4. Technical Manuals (Month 23) It will include EffiCOIL detailed manual with technical specifications, an installation & maintenance guide, and the Standard Operation Procedures.
Diritti di proprietà intellettuale
Numero candidatura/pubblicazione:
EP
17192911
Data:
2017-09-25
Candidato/i:
PRODUTECH SRL
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile