Resultado final
D 3.3. Preliminary performance report (month 15) A monitoring and controlling report will be supplied about results obtained with Task 3.4, including the prototype performance description during first commissioning. It will be useful for detecting limits and problems to be solved and to go beyond during WP4.
Performance evaluation reportD 5.3 Performance evaluation report (month 23) This report will include EffiCOIL performance results, technical details of the operational parameters, as well as samples of manufactured parts.
D 3.2. EffiCOIL prototype (month 13) EffiCOIL prototype running will be shown as a demonstration. EC personnel will be welcomed to visit PRODUTECH facilities and will check EffiCOIL operation.
D 5.4. Technical Manuals (Month 23) It will include EffiCOIL detailed manual with technical specifications, an installation & maintenance guide, and the Standard Operation Procedures.
Derechos de propiedad intelectual
Número de solicitud/publicación:
EP
17192911
Fecha:
2017-09-25
Solicitante(s):
PRODUTECH SRL
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles