Deliverables
Data Management Plan second revision
Final Data Management Plan revised version
Data Management Plan first revisionData Management Plan revised
TPS reports with description of the method materials and software used as well as the data analysis Round 2
Information materials (project fact-sheet, flyers, poster)Final report
Dissemination and Training plan
List of the criteria the reference materials have to meet for use in validation studies
Survey on the needs of users of the EPPO Database and exploitation of the data
Guidelines for the revision of the EPPO Standards PM 7/098 and PM 7/122 for validation studies (including TPS)
Guidelines for the revision of the EPPO Standards PM 7098 and PM 7122 for validation studies including TPS
Report on education and training session during the projectPeriodic report
Results exploitation plan
"""Best practice"" guidelines for validation and routine use of non-targeted techniques in diagnostic setting which could serve as a basis for a new EPPO Standard"
Best practice guidelines for validation and routine use of nontargeted techniques in diagnostic setting which could serve as a basis for a new EPPO Standard
Scientific publication of the results of the validation of approach applied on 5 existing datasetsDefinition of the EU Plant Health Diagnostics Charter for Industry
Development draft Standard Operating Procedures (SOPs) available for the production of the reference materials identified in Task 3.1
TPS reports with description of the method, materials and software used, as well as the data analysis - Round 1
TPS reports with description of the method materials and software used as well as the data analysis Round 1
Report on the organisation of training activities (webinars, video tutorial, practical training sessions)Report on the organisation of training activities webinars video tutorial practical training sessions
Analysis of the needs of the laboratories and applicability of the horizontal proficiency testing approach based on the questionnaire answersReport on improved version of the validation section of the EPPO Database on diagnostic expertise, including new data provided by laboratories
Guidelines on an approach to undertake horizontal proficiency testing
List of tests for validation - Round 2
Inventory of validation data available
Report on economic impact of priority tests
List of tests for validation - Round 1
Lead beneficiaries of this deliverable are both NIB and NVWA. List of tests for validation - Round 1
Report on stakeholder priorities for tests and general prioritization frameworkReport detailing the minimum performance parameters to select tests for validation and selection of laboratories for TPS
Lead beneficiaries of this deliverable are both NIB and NVWA. Report detailing the minimum performance parameters to select tests for validation and selection of laboratories for TPS
Guidelines and Standard Operating Procedures (SOP) finalised for the production of the reference materialsFinal Plan for the Dissemination and Exploitation of project Results (PDER)
Final Plan for the Dissemination and Exploitation of project Results PDER
Publications
Author(s):
C. Trontin, B. Agstner, D. Altenbach, G. Anthoine, H. Bagińska, I. Brittain, A. Chabirand, A. M. Chappé, P. Dahlin, T. Dreo, C. Freye-Minks, C. Gianinazzi, C. Harrison, G. Jones, M. Luigi, S. Massart, N. Mehle, M. Mezzalama, H. Mouaziz, F. Petter, M. Ravnikar, T. M. Raaymakers, J. P. Renvoisé, M. Rolland, M. Santos Paiva, S. Seddas, R. van der Vlugt, A. Vučurović
Published in:
EPPO Bulletin, 2021, ISSN 0250-8052
Publisher:
European and Mediterranean Plant Protection Organisation
DOI:
10.1111/epp.12740
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available