Periodic Reporting for period 2 - ASPIRE (Assessment Strategy for Upstream Plant Inspection and Repair)
Berichtszeitraum: 2018-05-01 bis 2019-10-31
This action will finalise and commercialise an advanced automated inspection system at TRL6 to deliver a unique and innovative product (ASPIRETM to TRL9) for inspecting oil & gas upstream asset integrity and recommending maintenance schedules. ASPIRETM will relevant to assets both above and below sea level, broadening the inspection scope. ASPIRETM addresses 2 out of 3 main objectives of the oil and gas industry detailed in a 2015 magazine published by EY (a global leader in assurance, tax, transaction and advisory services in Oil and Gas Sector). These 2 objectives include: (1) delivering continuous improvement in health, safety, environmental and quality (HSEQ) performance and (2) driving growth in daily production and proven reserves by optimising existing assets.
Objectives:
1. Complete the combination of the MEC-MPS200+ hardware with TWI’s enhanced analysis and maintenance recommendation software to deliver a system at TRL9.
2. Deliver a full scale end-to-end trial on an offshore installation with successful results.
3. Finalise the demonstrated ASPIRETM product, ready for market launch.
4. Create a validated business plan for launch and sales of ASPIRETM, with route to market established and agreements signed with partners.
5. Produce training manuals in English and Spanish, user guides and training programmes to support the roll-out of ASPIRETM in our priority countries (UK, Norway, Netherlands and Middle East)
6. Launch commercial ASPIRETM system (a software tool to support maintenance and integrity management of offshore structures, particularly conductors & caissons) into market for sale by Innospection.
7. Achieve recommendations as accepted practice in industry regulatory and best practice guidelines.
- WP 1: Project Management to cover work completed so far
- WP 2: Enhanced software design
- WP 3: Software enhancements to deliver ASPIRETM software
- WP 4: ASPIRETM software incorporation and functional testing (still ongoing)
- WP 5: Software demonstration / trials &promotion of results (started)
Work to come:
- WP 1: Project Management to cover the outstanding work packages
- WP 4: ASPIRETM software incorporation and functional testing (started, but still to be completed)
- WP 5: Software demonstration / trials &promotion of results (started, but still to be completed)
- WP 6: ASPIRETM software training
- WP 7: End users and sales agent engagements, dissemination and IPR strategy
- WP 8: Commercialisation and sales
- Promoting a risk based approach for integrity management of ageing assets in the oil & gas industry.
- The risk based approach for integrity management forms the basis for asset lifetime extension (to maximise production) whilst ensuring safe operation.