Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

Enabling Future Arrays in Tidal

Livrables

T1-3 Operations Report

Report on operation of turbines prior to T4 deployment, based on analysis of data collected in T6.2 and T6.5.

T4 Lessons Learned Report

Report detailing lessons learned in the design and build of T4 of the array. Relates to T5.9.

Decommissioning Report

Decommissioning report including lessons learned for wider industry dissemination Relates to T77

DTOcean: Conclusions

Contains information from T106 The final stage of the work package including the general overview of the rest of deliverables Moreover the recommended changes in design for both DTOcean design tools and future arrays will be given in this deliverable

Best Practice Report on intra-array layout and control

Best practice report Report on best practice intraarray layout and control for electrical infrastructure and turbines Relates to T98

Year 1 environmental monitoring public report

Report summarising the outcomes from environmental monitoring in year 1 of the project. Relates to T8.2.

Series phase lessons learned report

Report detailing lessons learned in the series production of T57 of the array Relates to T59

Final Project and European ESEAs

Update to D89 to include full projects results Relates to T85

Final Decommissioning Plan

Final decommissioning plan incorporating experience gained on site and feedback from stakeholders Relates to T75

Conference presentations and papers: summary report

Summary report on presentations and technical papers arising from the EnFAIT project. This deliverable relates to T2.6.

Reliability Availability Maintainability (RAM) models for turbines and infrastructure

Report setting out the Reliability Availability Maintainability (RAM) models to be used for turbines and infrastructure. Relates to T9.3.

DTOcean: Comparative with design

Contains information from T10.4. Information about lessons learned from the application of DTOcean tools to the design of a real-world array will be produced in this deliverable.

DTOcean: Comparative with initial predictions

Contains information from T105 Predictions taken form deliverable D103 will be analysed in a more advanced stage of the project and lessons learned for the DTOcean design tools from the operation of a realworld tidal array will be reported

Public summary of consenting requirements and process

Report summarising the consent requirements and processes for the project, from a developer’s perspective. Relates to T8.1.

AIM: T1-4 operational report

Contains information from T10.9. Report on the results and emerging findings for the AIM study from the first four turbines in the array.

T1-4 Operations Report

Report on operation of turbines prior to T5 T6 deployment based on analysis of data collected in T67

Definition Document of Agreed KPIs

Report setting out the KPIs for array build, test and construction. Relates to T5.1.

T1-3 Upgrade report

Report summarising EnFAIT-driven upgrades required to turbines T1-3. Relates to T6.3.

Initial Decommissioning Plan

Initial decommissioning plan developed following consultation with stakeholders and review of best practice. Relates to T7.2 and T7.3.

WP9 report: conclusions and future recommendations

Conclusions and future recommendations following from the outputs of WP9 Relates to T98

AIM: design report

Contains information from T10.7 and T10.8. Report on the design of the instrumentation, and results from initial array modelling work.

Local community engagement strategy

Strategy for engaging the local community in this and future tidal energy projects. Relates to T8.6.

Certification & Warranty Framework

Framework for the certification of tidal arrays, including roadmaps to type and site certification. Relates to T3.8.

T1-6 Initial Operations Report

Report on initial operation of full array based on analysis of data collected in T68

Decommissioning Lessons Learned Report

Report capturing best practice for decommissioning tidal turbines, to inform the decommissioning plan. Relates to T7.1.

T1-6 Interim Operations Report

Report on operation of full array after changes to operating strategy based on analysis of data collected in T610

Business Plan Template

Business plan template for potential project developers entering the ocean energy market. Relates to T3.3.

Year 5 environmental monitoring public report

Report summarising the outcomes from environmental monitoring in years 35 of the project Relates to T82

Maintenance Strategy Review (MSR) specification

Report describing the MSR specification & design of the maintenance and condition monitoring programme. Relates to T9.4.

Year 3 environmental monitoring public report

Report summarising the outcomes from environmental monitoring in years 2-3 of the project. Relates to T8.2.

Design Failure Mode Effect Analysis for tidal array Report

Report setting out the Design Failure Mode Effect Analysis for tidal array. Relates to T9.2.

AIM: full array operational report

Contains information from T1010 Report on the results and emerging findings for the AIM study from operation of the full six turbine array including the results from reconfiguring the array layout

Final Local community engagement strategy

Update to D83 to include full project results Relates to T86

Verification Framework

Framework for the verification of designs and outputs relevant to a tidal energy project. Relates to T3.5.

Data requirements definition and collection plan

Contains output from T10.1. Shows summary information about the modelling tools to be used in the work package and their inputs. Show summary information about the currently existing data sets for the site and array. Outlines a plan for closing the gap between these two lists.

AIM final report

Contains information from T1011 Synthesis and analysis of data and findings from the AIM study and recommendations for further work

Array Commercialisation Strategy

Report setting out the benefits of tidal energy and providing advice on how to build the market. Relates to T3.4.

Test plan

Test plan for the project, including agreed key performance indicators and reporting frequency. Relates to T6.1.

Training materials

Launch of materials for use in training workshops. This deliverable relates to T2.9.

Multi-media products launch

Launch of initial multi-media products for the EnFAIT project. This deliverable relates to task T2.5.

T1-6 Final Report

Final report covering full lifetime of turbine operations Relates to all tasks in WP6

Initial Project and European ESEAs

Report setting out the initial results of environmental and socio-economic appraisal, at a project and European level, including a summary of lessons learned for the wider marine energy industry. Relates to T8.4.

Plan for delivery of the Project and European ESEAs

Report setting out the plan for environmental and socio-economic appraisal in the EnFAIT project. Relates to T8.3.

External project website

Launch the external website for the EnFAIT project. This deliverable relates to T2.4.

External project website: mid-term update report

Update report on the project website, including a refresh of materials and analysis of activity. This deliverable relates to T2.4.

DTOcean: Scenario definition & Performance metrics

Contains information from T10.3. Shows information about first stage performance metrics for future comparisons, as well as all scenario information: array layout, electrical system, moorings and foundation, logistics, system control and operation tools.

LCOE & Financial Models

Model for the lifetime cost of energy for tidal arrays, supported by a detailed tidal array project financial model. Relates to T3.7.

Publications

Capability Assessment of DTOcean Array Design Tool for Ocean Energy

Auteurs: Bloise Thomaz, Tianna; van Velzen, Leonore; Jeffrey, Henry; Medina Lopez, Encarni; Wills, Tom
Publié dans: EWTEC Proceedings, Numéro 2019, 2019
Éditeur: EWTEC
DOI: 10.5281/zenodo.4683496

Tidal resource, turbine wake and performance modelling on the EnFAIT project

Auteurs: Alasdair Macleod, Andrew Watson, David Quantrell, Sam Porteous and Tom Wills
Publié dans: EWTEC Proceedings, Numéro 2019, 2019
Éditeur: EWTEC
DOI: 10.5281/zenodo.4681064

Tidal resource turbine wakes and performance modelling

Auteurs: Macleod, Alasdair
Publié dans: EWTEC Proceedings, 2019
Éditeur: EWTEC

O&M Models for Ocean Energy Converters: Calibrating through Real Sea Data

Auteurs: Tianna Bloise Thomaz, David Crooks, Encarni Medina-Lopez, Leonore van Velzen, Henry Jeffrey, Joseba Lopez Mendia, Raul Rodriguez Arias, Pablo Ruiz Minguela
Publié dans: Energies, Numéro 12/13, 2019, Page(s) 2475, ISSN 1996-1073
Éditeur: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en12132475

Review of tidal turbine wake modelling methods

Auteurs: Ellen Jump, Alasdair Macleod, Tom Wills
Publié dans: International Marine Energy Journal, Numéro 3/2, 2020, Page(s) 91-100, ISSN 2631-5548
Éditeur: European Wave and Tidal Energy Conference
DOI: 10.36688/imej.3.91-100

Recherche de données OpenAIRE...

Une erreur s’est produite lors de la recherche de données OpenAIRE

Aucun résultat disponible