Deliverables
Supporting agreements to enable Task 61
Societal and legal effects of transport decision: Stakeholder analysis.Report on the output of Task 5.1
Development of technology for track and ride quality monitoringReport on progress in Task 42
Cost/benefit data and application methodology for lean in railway S&CReporting output of Task 231
Lubrication systems and data available, with estimates of costs and benefitsReporting output of Task 251
Preliminary transition zone model and detailed modelling planReporting output of Task 261
Final business case synthesis final reportReporting output of Task 1.6
Low cost track based monitoring modules for plain line and S&C.Report on the output of Task 41
Incentives final reportReporting output of Task 15
Database of economic data on case study lines, with accompanying meta-data description to document structureAchievement, problems, mitigation action, and any deviations in creation of the database of economic data. Sample data to be appended.
Model to support increasing the resilience of power supply infrastructure to changing climate.Report on the output of Task 3.2
Interface definition for input of GNSS (or ground-based train odometry) location data to monitoring technology.Report on output of Task 44
Development status of smartphone technology for track and ride quality monitoring.Report on progress in Task 4.3
Status report on current design & maintenance criteria relative to needs, static illustration for case study linesReport on the output of Task 65
Harmonised interface to transmit on-board monitoring data to the traffic control centre.Report on output of Task 44
Corrugation reduction strategies for NeTIRail-INFRA track types, with estimates of costs and benefitsReporting output of Task 2.4.1
Practices and track technology tailored to particular lines.Reporting the output of Task 22
Overview of technical developments and innovation with direct or possible future expected impact on existing guidelines.Reporting output of Task 75
Low cost smartphone based track and ride quality monitoring technology.Report on output of Task 43
Project Management Plan.Generated in work package 8
Project Website (public and private)Achievement, problems, mitigation action, and any deviations in creation of the project website. Sample of website to be appended.
Report on selection of case studiesReport on selection of case studies generated by T11
Tailoring lubrication to duty and climate: Safe, effective and eco-friendly avoidance of track wear and damageReporting output of Task 252
Decision support tools for implementation of technologiesAchievement, problems, mitigation action, and any deviations in creation of the decision support tools in Task 6.3. Sample of tool to be appended.
Cost and User benefit reportReporting output of Task 13
Data report on network-related technical and operational dataReport on the output of Task 61
Tailoring track to avoid corrugations: Traffic dependant selection of rail cross-section, clips and pads to avoid or delay corrugationReporting output of Task 2.4.2
Modular packages of component grades and design specifications for new installations of power infrastructure tailored to traffic and operational needs.Report on the output of Task 33
Cost effective transition zone design tailored to line type and trafficReport on output of Task 2.6.2
Wider economic benefits intermediate reportReporting output of Task 14
Cost-benefit and societal analysis report illustrated by case study line dataReport on the output of Task 6.4
Tailored decision support for track and vehicle maintenance through conversion of data to information.Report on output of Task 4.5
Project Quality PlanGenerated in work package 8
Cost model development reportReporting output of Task 13
Data on system damage for different combinations of wire tension, pantograph collector strip material and upload force.Report on the output of Task 3.5
Validated monitoring equipment produced by testing of instrumentation in the real environment.Report on output of Task 46
Data collection equipment in the laboratory environment, and plan for field trialsReport on the output of Task 41
Overview of project related recommended future development needs.Reporting output of Task 76
Tailored combinations of wire tension, pantograph collector strip material and upload force for optimum performance.Report on the output of Task 34
Wider economic benefits final report.Reporting output of Task 1.4
Balancing societal effects and cost-benefit of different infrastructure decisions.Report on the output of Task 5.3
Track and ride quality monitoring technology based on train-borne measurements in standard vehicles.Report on output of Task 42
Analysis of “big data”: geospatial analysis of costs, drivers of failure and life of track infrastructure.Reporting output of Task 21
Analysis of “big data”: tailoring overhead line infrastructure specification and needs through geospatial analysis of duty and life of equipment.Report on the output of Task 32
Power supply technologies and practices of low and high-density railways, identifying learning points and future opportunities.Report on output of Task 31
Perception of different service options: User study and data analysisReport on the output of Task 52
Case study line data scenarios playable in the web applicationReport on output of Task 64
GIS-based web applicationAchievement, problems, mitigation action, and any deviations in creation of the GIS-based web application in Task 6.2. Sample of application to be appended.
Application of lean and automotive industry techniques to produce a step change in railway S&C life and costsReporting output of Task 2.3.2
Functional, operational and technical specification for simplified interlocking of user autonomous switches in low density lines.Report on achievement problems mitigation action and any deviations from expectations in demonstration of equipment designed in Task 44
Project communications and publicity. Three issues: Month 12, 24, 36.
Project FlyerProject communications and publicity
NeTIRail-INFRA Final brochureProject communications and publicity
Publications
Author(s):
Ali Jamshidi, Alfredo Núñez, Rolf Dollevoet, Zili Li
Published in:
Journal of Infrastructure Systems, Issue 23/3, 2017, Page(s) 04017006, ISSN 1076-0342
Publisher:
American Society of Civil Engineers
DOI:
10.1061/(ASCE)IS.1943-555X.0000357
Author(s):
Alfredo Nunez, Ali Jamshidi, Hongrui Wang
Published in:
IEEE Transactions on Industrial Informatics, 2018, Page(s) 1-1, ISSN 1551-3203
Publisher:
Institute of Electrical and Electronics Engineers
DOI:
10.1109/TII.2018.2847736
Author(s):
Shaoguang Li, Zili Li, Alfredo Núñez, Rolf Dollevoet
Published in:
Applied Sciences, Issue 7/8, 2017, Page(s) 807, ISSN 2076-3417
Publisher:
Applied Sciences
DOI:
10.3390/app7080807
Author(s):
Maider Oregui, Alfredo Núñez, Rolf Dollevoet, Zili Li
Published in:
Journal of Engineering Mechanics, Issue 143/5, 2017, Page(s) 04017011, ISSN 0733-9399
Publisher:
American Society of Civil Engineers
DOI:
10.1061/(ASCE)EM.1943-7889.0001207
Author(s):
A. Nunez, TU Delft
Published in:
IEEE WCCI 2018, Rio de Janeiro, Brazil, 2018
Publisher:
IEEE World Congress on Computational Intelligence
Author(s):
Prof. Andrew Smith, University of Leeds
Prof. Chris Nash, CERRE & University of Leed
Published in:
http://www.cerre.eu, 2018
Publisher:
Centre on Regulation in Europe (CERRE) a.s.b.l.
Author(s):
A. Nunez, TU Delft
Published in:
World Transport Convention 2018, 2018
Publisher:
World Transport Convention 2018
Author(s):
Andrew Smith, University of Leeds
Published in:
ResearchGate, 2018
Publisher:
ResearchGate
Author(s):
Jamshidi, A.; Hajizadeh, S.; Naeimi, M.; Nunez Vicencio, Alfredo; Li, Z.
Published in:
1st International Conference on Rail Transportation: ICRT2017, Issue 1, 2017
Publisher:
First International Conference on Rail Transportation
Author(s):
LIU, Baisi; GHAZEL, Mohamed
Published in:
Railway Engineering-2017, Edinburgh, Issue 1, 2017
Publisher:
Railway Engineering-2017
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available