Objectif
Due to the seamless guidance by rails, the railway system requires a dedicated signalling sub-system, whereby a major part of the functionality must be ensured and controlled on the infrastructure side. From a European perspective, the traditional signalling is one of the most conservative parts of the railway system strongly bound to the national traditions by all involved parties.Since 1990 the EU is promoting the reformation of parts of the signalling subsystem under the ERTMS programme.However this covers not the whole signalling system.The implementation of ETCS could be hampered, in areas of the conventional European rail network, where interlocking will need to be replaced, if this cannot be carried out in an economically and technically efficient manner. Also the implementation of systems utilising centralised and automated route-setting of trains will be economically constrained.Railways are aiming for significantly reduced life-cycle costs of future interlocking and associated outdoor equipment. Standardisation, increased competitive tendering and significant reduction of implementation time are considered to be key requirements for the future.Without an approach, similar to that underway for ERTMS-ETCS, many suppliers will run into resource constraints, making it difficult for them to keep up with the many new concurrent developments.Therefore railways and the signalling supply industry agree that the scope of INESS should be the interlocking up to the point of interfaces with the surrounding other signalling and train control systems like centralised traffic control, neighbouring interlocking, ETCS Radio-block centres and possibly object controllers for out-door devices.INESS will adopt the CENELEC norm with the underlying system engineering principles. It will build on the available results of both the Euro-Interlocking project and the ERTMS developments and it will especially not modify the current ETCS functionalities and solutions.
Champ scientifique
Appel à propositions
FP7-SST-2007-RTD-1
Voir d’autres projets de cet appel
Régime de financement
CP-IP - Large-scale integrating projectCoordinateur
75015 Paris
France
Voir sur la carte
Participants (30)
28020 Madrid
Voir sur la carte
92300 Levallois-Perret
Voir sur la carte
6001 Charleroi
Voir sur la carte
16151 NAPOLI
Voir sur la carte
106 00 Praha
Voir sur la carte
38126 BRAUNSCHWEIG
Voir sur la carte
DE24 8AD Derby
Voir sur la carte
60327 Frankfurt Am Main
Voir sur la carte
5612 AE Eindhoven
Voir sur la carte
24145 KIEL
Voir sur la carte
NW1 2PL LONDON
Voir sur la carte
SE1 8SW LONDON
Voir sur la carte
3511 EP Utrecht
Voir sur la carte
L15 8JL LIVERPOOL
Voir sur la carte
00161 Roma
Voir sur la carte
52074 Aachen
Voir sur la carte
41238 MONCHENGLADBACH
Voir sur la carte
80333 Munchen
Voir sur la carte
SO17 1BJ Southampton
Voir sur la carte
71254 Ditzingen
Voir sur la carte
38106 Braunschweig
Voir sur la carte
28040 Madrid
Voir sur la carte
YO10 5DD York North Yorkshire
Voir sur la carte
1050 Bruxelles / Brussel
Voir sur la carte
51147 Koln
Voir sur la carte
28006 MADRID
Voir sur la carte
781 89 Borlange
Voir sur la carte
28036 Madrid
Voir sur la carte
70043 Monopoli
Voir sur la carte
20018 San Sebastian
Voir sur la carte