Objetivo
PEGASE is a four year project dealing with the High and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre’s in power system analysis and applied mathematics. Its overall objectives are to define the most appropriate state estimation, optimization and simulation frameworks, their performance and dataflow requirements to achieve an integrated security analysis and control of the ETN. The heart of the PEGASE project will involve advanced algorithmic, build prototypes of software and demonstrate the feasibility of real-time state estimation (SE), multi purpose constrained optimization (OPF) and time domain simulation of very large model representative of the ETN, taking into account its operation by multiple TSOs. Project R&D ambitions: The first ambition is to relieve all knowledge barriers to provide all TSOs with a synchronous display of the state of the ETN, very close to real time (typically each 5-10 seconds). The second ambition is to develop OPF programs determining realistic system operating points that include TSO operating rules but also optimal preventive or corrective actions, typically for real-time congestion management. The third ambition is to improve the existing state of the art technology in time simulation of very large system to permit: i/ off-line studies of the ETN including possibly interconnections with neighboring systems (i.e. Russia), ii/ dispatcher training simulation iii/ preventive security assessment and in on-line emergency conditions, faster than real-time simulation opening new perspectives for an anticipative control of the system. Project expected impacts: The availability of duly tested prototypes will allow for a quick implementation of the developed tools in a central facility and in existing computing environments. A better management of crisis will allow decreasing conservative security margins and improving the identification of real risks. Operating with higher power flows and closer to real available transfer capacities determined more transparently from the shared real-time model will enhance the cross-border electricity market. Eventually, the first European dispatcher training simulator will be at arm length for use in a European training center allowing the simultaneous training of dispatchers from several countries that is the cornerstone of the integrated operation of the ETN.
Ámbito científico
Palabras clave
Tema(s)
Convocatoria de propuestas
FP7-ENERGY-2007-1-RTD
Consulte otros proyectos de esta convocatoria
Régimen de financiación
CP-IP - Large-scale integrating projectCoordinador
1000 BRUXELLES
Bélgica
Ver en el mapa
Participantes (24)
92073 Paris
Ver en el mapa
La participación finalizó
28109 ALCOBENDAS - MADRID
Ver en el mapa
4000 Liege
Ver en el mapa
68219 Mannheim
Ver en el mapa
09310 VILNIUS
Ver en el mapa
5612 AE Eindhoven
Ver en el mapa
75008 PARIS
Ver en el mapa
La participación finalizó
78153 Le Chesnay Cedex
Ver en el mapa
41092 Sevilla
Ver en el mapa
45141 Essen
Ver en el mapa
1048 Riga
Ver en el mapa
75000 TUZLA
Ver en el mapa
M13 9PL Manchester
Ver en el mapa
105318 MOSCOW
Ver en el mapa
1749 061 Lisboa
Ver en el mapa
030786 Bucuresti
Ver en el mapa
109074 Moscow
Ver en el mapa
06100 Bahcelievler - ANKARA
Ver en el mapa
10000 Zagreb
Ver en el mapa
91190 SAINT AUBIN
Ver en el mapa
28006 MADRID
Ver en el mapa
28109 Alcobendas - Madrid
Ver en el mapa
LT-05131 Vilnius
Ver en el mapa
1000 Bruxelles / Brussel
Ver en el mapa