Resultado final
This deliverable will report on the analysis of energy needs and battery integration for truck & trailer (VC8).
Technical requirementsTechnical needs and requirements for BEV and FCEV combinations. This deliverable is related to T1.1.
Supply chain mappingThis deliverable will show the mapping of the ZEFES use cases at a supply chain level. This deliverable is related to T1.3.
Design of the interface between e-trailer and prime moverThis deliverable reports on the analysis of energy needs and battery integration for truck & trailer including design of operation strategies to increase range (VC8).
Digital twin and platform specification & architectureThis deliverable will be a report on the digital twin and platform specification & architecture, including selection of tools, scaling of models, model fidelity, run time and usage assessment. This deliverable is related to activities in T4.1/T4.2, VC16 and VC17.
Feasibility study on new vehicle flexible conceptsThis deliverable will report on the feasibility study on new vehicle flexible concepts for payload capacity up to 100% for next LHDV generations. This deliverable is related to activities in T2.5
Infrastructure model/dataset (V2I Concept)This deliverable will be a report on the infrastructure model/dataset (V2I Concept). This deliverable is related to VC13 and T4.4.
Vehicle simulation platformsThis deliverable will report on the vehicle simulation platforms for BEV, FCEV and trailer combinations. This deliverable is related to activities in T2.2.
ZEFES ecosystem specificationThis deliverable will show the ZEFES ecosystem specification, including the use case KPI needs, stakeholder business needs, consolidation towards consistent system, and TCO. This deliverable is realted to T1.3, 1.4, 1.5.
Functional Safety ConceptThis deliverable will be a report on the functional safety concept for e-trucks, e-dollies and e-trailers for use in vehicles with a distributed zero emission powertrain.
Defined Use Cases, Target metrics and needsThis deliverable will define the KPIs per use case on energy savings and mission efficiency. The deliverable is related to T1.2.
Corporate IdentityThis deliverable will be a report on the project's corporate Identity. This includes the project website, project flyer design, etc.
Optimization co-design tool and right powertrain component’ sizingThis deliverable reports on the design optimization tool (VC10) and right powertrain components’ sizing with at least 90 payload capacity for use-cases. This deliverable is related to activities in T2.3 and T2.4.
Supply chain needsThis deliverable will report the supply chain needs for reduced energy usage on the missions. This deliverable is related to T1.7.
Publicaciones
Autores:
Shantanu Pardhi; Sajib Chakraborty; Dai-Duong Tran; Mohamed El Baghdadi; Steven Wilkins; Omar Hegazy
Publicado en:
Energies, Vol 15, Iss 24, p 9557 (2022), Edición 2022, 15, 9557, 2022, ISSN 1996-1073
Editor:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en15249557
Autores:
Ben Kraaijenhagen, Sten Wandel
Publicado en:
Transportation Research Procedia, Edición 72, 2024, ISSN 2352-1465
Editor:
Elsevier BV
DOI:
10.1016/j.trpro.2023.11.805
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles