Report on data review of energy behavioural data Reanalyse existing data sets and studies on the topic of energy efficiency and consumer behaviour This metaanalysis will be a good starting point for further assessments of ENCHANTs own data set Basedon the consolidated data set of previous projects The descriptive and inferential analysis will inform a data review of energy consumption behaviour to date presented as a metaanalysis report
Literature review on energy-related behavioural interventionsLiterature review on energyrelated behavioural interventions and definition of standardised intervention packages A comprehensive review of existing behavioural interventions drawing on established findings from previous projects where psychological science and behavioural insights have been more or less successfully applied to stimulate behavioural change in the domain of energy choices and sustainable lifestyles in general
Design of intervention matrix, definition of RCT research protocol and short report on the co-construction processDesign of intervention matrix and definition of RCT research protocol Select and define the specific intervention matrix and the experimental research protocol necessary for their assessment These will be made via Workshops addressing three types of userpartners to discuss the practical implications Identification and evaluation of the main infrastructures and existing or potential policy scheme available for each different type of partner and for each different type of intervention to be implemented in ENCHANT
Consolidated datasetConsolidated dataset from ENCHANT interventions. Data collection within the consortium, data sorting and processing, and data analysis. Throughout the process, data integrity and security will be of paramount concern. The ethical guidelines developed in T3.2. will be applied.
Communication strategy and activities ver. 1The communication and dissemination strategy sets out how the results stories and lessons learned in ENCHANT are communicated to relevant audiences and stakeholders most efficiently and effectively The development of the communication strategy follows three steps 1 stocktaking 2 assessment 3 planning
Exploitation Strategy ver. 3A specific exploitation strategy for the full project’s lifetime will be designed in the first 6 months including yearly operational plans detailing precisely the procedure for using ENCHANT’s results. The strategy will be updated in M14 and M24. The strategy will include: (1) a refined stakeholder and market analysis for the project’s outcomes; key messages towards stakeholders, audiences and target groups; selection of tools,channels and measures; communication and dissemination strategies and activities; management of exploitation; and standard operating procedures for publications, participation in conferences and exploitation. The strategy for the exploitation of results will support the consortium’s joint efforts to maximize the project’simpact, but also business plans for individual partners. Additionally, to the conclusions in forms of policy recommendations and proposals for actions, which are the direct outputs of the ENCHANT, the followingare some of potential pathways for exploiting the project’s results:1. Scientific publications under the green or golden open access scheme2. Continued management and exploitation of the project’s data3. Action plans for municipalities and regions involved in energy efficiency strategies4. Data on user preferences and energy efficiency strategies for utilities and other commercial agents in the energy field5. Methodologies for citizen participation in the planning and implementation of energy efficiency measures
Dissemination strategy and activities ver. 4Dissemination Plan. This activity will be devoted to the design of a communication strategy to maximizethe impact of the dissemination efforts. This development will be based on the four basic pillars of thecommunication strategy:1. Definition of the dissemination objectives;2. Identification of the target audiences;3. Description of the dissemination activities to be carried out;4. Identification and selection of the specific tools and activities supporting effective communicationwith all the relevant stakeholders.
Guidelines and Operational Intervention PlanDevelop the guidelines, application principles, and an operational implementation plan for the pilots. This implementation plan includes identifying the suitable time slots for the user-partners, establishing communication and other relevant preliminary work for the implementations, the actual implementation, and a time-phased planning and execution of monitoring and follow-up mechanisms.
A demo of the toolA demo of the tool, demonstrating the tool functions based on data samples.
Exploitation Strategy ver. 2A specific exploitation strategy for the full projects lifetime will be designed in the first 6 months including yearly operational plans detailing precisely the procedure for using ENCHANTs results The strategy will be updated in M14 and M24 The strategy will include 1 a refined stakeholder and market analysis for the projects outcomes key messages towards stakeholders audiences and target groups selection of toolschannels and measures communication and dissemination strategies and activities management of exploitation and standard operating procedures for publications participation in conferences and exploitation The strategy for the exploitation of results will support the consortiums joint efforts to maximize the projectsimpact but also business plans for individual partners Additionally to the conclusions in forms of policy recommendations and proposals for actions which are the direct outputs of the ENCHANT the followingare some of potential pathways for exploiting the projects results1 Scientific publications under the green or golden open access scheme2 Continued management and exploitation of the projects data3 Action plans for municipalities and regions involved in energy efficiency strategies4 Data on user preferences and energy efficiency strategies for utilities and other commercial agents in the energy field5 Methodologies for citizen participation in the planning and implementation of energy efficiency measures
Communication strategy and activities ver. 3The communication and dissemination strategy sets out how the results, stories and lessons learned in ENCHANT are communicated to relevant audiences and stakeholders most efficiently and effectively. The development of the communication strategy follows three steps: 1) stocktaking, 2) assessment, 3) planning.
Work Plan ver. 2The purpose of the Work Plan is to highlight and operationalize ENCHANT WP and task startups and dependencies to handle dates and responsibilities related to deliverables to give an overview of ENCHANT meetings and to give an overview of ENCHANT document risk and costschedule management
Data repositoryData repository of relevant data from userpartners and previous projects A separate file of methodological overview will be assembled in order to inform the methodological approach of the ENCHANT interventions
Progress report to EASMEProgress report to EASME This is a short progress report which will allow EASME and the Coordinator to have a dialogue on the advancement of the project and solve any concerns that may arise on both sides
Dissemination strategy and activities ver. 1Dissemination Plan This activity will be devoted to the design of a communication strategy to maximize the impact of the dissemination efforts This development will be based on the four basic pillars of the communication strategy1 Definition of the dissemination objectives2 Identification of the target audiences3 Description of the dissemination activities to be carried out4 Identification and selection of the specific tools and activities supporting effective communication with all the relevant stakeholders
Policy instrument matrix - xlsx file -In the report on policy instrument matrix and policy-ready recommendations the policy instrument matrix is presented (as an xlsx file) and the consolidated policy-ready recommendations are described in a report which is accompanied by at least three policy briefs, each of which tackles one of the core assessment dimensions Energy-Environment-People.
Data Management Plan ver. 3A specific DMP will be written in the first six months of the project, detailing precisely the procedure for data collection, consent procedure, storage, protection, retention and destruction of data, and confirmation that they comply with national and EU legislation. The DMP will ensure that the exchange of data in ENCHANT is in full compliance with EU and national legislations, as well as with the participating userpartners’ internal data protection strategies. The DMP provides an effective framework to ensure comprehensivecollection and handling of the data used in the project, and will evolve during the lifetime of ENCHANT.
Intervention Monitoring PlanThe operational plan for implementation will be based on a matching of the intervention packages with the user-partners, and the associated communication channels. The development of guidelines will consider the technical compatibility, geographical fit, and the likelihood of attaining expected impact. T4.1 will also suggestand implement possible modifications of the interventions, in order to fine-tune them for smoother implementation and desirable impact. The operational implementation plan will also consider adopting and improving the intervention packages in order to ensure sufficient variety, which may enhance the replicability and reproducibility of interventions during the project, and beyond the project lifetime. The monitoring and follow-up mechanisms will rely on the KPIs developed for the preparation, pilot, and post-implementation stages of the interventions, along with targets for the developed KPIs.
"The report ""How to transfer BPIs?"""The report “How to transfer BPIs?” provides a guideline for transferring the best-practise interventions to other situations, businesses, countries or regions. The report will be written in such a way as to be fully accessible and usable by non-expert users but will also provide expert-users additional information.
Dissemination strategy and activities ver. 2Dissemination Plan This activity will be devoted to the design of a communication strategy to maximizethe impact of the dissemination efforts This development will be based on the four basic pillars of thecommunication strategy1 Definition of the dissemination objectives2 Identification of the target audiences3 Description of the dissemination activities to be carried out4 Identification and selection of the specific tools and activities supporting effective communicationwith all the relevant stakeholders
Ethical and data protection methodologyEthical and data protection methodology of dataset management An overall assessment of key regulatory aspects within the European and national legislation in relation to all aspects of external datasets A methodology for handling external data and ensure that the ethical requirements defined by T14 are followed also for external datasets
KPI reportKPI report which provides detailed guidance on all data and information collection activities in ENCHANT and aims at providing quantitative and qualitative results regarding the impact of ENCHANT.
Work Plan ver. 1The purpose of the Work Plan is to highlight and operationalize ENCHANT WP and task startups and dependencies to handle dates and responsibilities related to deliverables to give an overview of ENCHANT meetings and to give an overview of ENCHANT document risk and costschedule management
Report about the design of decision-making toolReport about the design of decision-making tool, define the detailed requirements and the process of the design of the high-level architecture, develop and test of the recommender system algorithm, as well as the suggestions about data security and privacy.
Communication strategy and activities ver. 2The communication and dissemination strategy sets out how the results stories and lessons learned in ENCHANT are communicated to relevant audiences and stakeholders most efficiently and effectively The development of the communication strategy follows three steps 1 stocktaking 2 assessment 3 planning
Documentation of the final implementation of the web-toolDocumentation of the final implementation of the web-tool including a description of the results from implementing the tool in the pilots.
Communication strategy and activities ver. 4The communication and dissemination strategy sets out how the results, stories and lessons learned in ENCHANT are communicated to relevant audiences and stakeholders most efficiently and effectively. The development of the communication strategy follows three steps: 1) stocktaking, 2) assessment, 3) planning.
Exploitation strategy ver. 1A specific exploitation strategy for the full projects lifetime will be designed in the first 6 months including yearly operational plans detailing precisely the procedure for using ENCHANTs results The strategy will be updated in M14 and M24 The strategy will include 1 a refined stakeholder and market analysis for the projects outcomes key messages towards stakeholders audiences and target groups selection of toolschannels and measures communication and dissemination strategies and activities management of exploitation and standard operating procedures for publications participation in conferences and exploitation The strategy for the exploitation of results will support the consortiums joint efforts to maximize the projectsimpact but also business plans for individual partners Additionally to the conclusions in forms of policy recommendations and proposals for actions which are the direct outputs of the ENCHANT the followingare some of potential pathways for exploiting the projects results1 Scientific publications under the green or golden open access scheme2 Continued management and exploitation of the projects data3 Action plans for municipalities and regions involved in energy efficiency strategies4 Data on user preferences and energy efficiency strategies for utilities and other commercial agents in the energy field5 Methodologies for citizen participation in the planning and implementation of energy efficiency measures
Dissemination strategy and activities ver. 3Dissemination Plan. This activity will be devoted to the design of a communication strategy to maximizethe impact of the dissemination efforts. This development will be based on the four basic pillars of thecommunication strategy:1. Definition of the dissemination objectives;2. Identification of the target audiences;3. Description of the dissemination activities to be carried out;4. Identification and selection of the specific tools and activities supporting effective communicationwith all the relevant stakeholders.
Evaluation Report on Pilot ImplementationsWill extract the experience, and lessons learned, from the pilot implementations. It will integrate information from different channels, and from three main sources: i) the feedback and information collected by the user-partners from the field, ii) the information collected through the established monitoring mechanisms, andiii) the information obtained through the co-ordination of different pilots in different geographical regions. i will reveal the operational aspects of the interventions, as well as pointers concerning their acceptance, replicability, and reproducibility. ii will be in the form of achievements for the KPIs defined for the preperation, pilot, and post-implementation stages. iii will enhance evaluations and cross-implementation comparisons. These will all be documented through a report that will evaluate the effectiveness, and performance, of the implementation process and interventions.
The deliverable will describe how the ENCHANT project meets the national legal and ethical requirements of the country or countries where the tasks raising ethical issues are to be carried out In particular the necessary tasks to comply with the EU General Data Protection Regulation GDPR will be addressed Data acquired in the research work with human participants will be collected retained and processed in pilot studies
Data management Plan ver. 1A specific DMP will be written in the first six months of the project detailing precisely the procedure for data collection consent procedure storage protection retention and destruction of data and confirmation that they comply with national and EU legislation The DMP will ensure that the exchange of data in ENCHANT is in full compliance with EU and national legislations as well as with the participating userpartners internal data protection strategies The DMP provides an effective framework to ensure comprehensivecollection and handling of the data used in the project and will evolve during the lifetime of ENCHANT
Data management Plan ver. 2A specific DMP will be written in the first six months of the project detailing precisely the procedure for data collection consent procedure storage protection retention and destruction of data and confirmation that they comply with national and EU legislation The DMP will ensure that the exchange of data in ENCHANT is in full compliance with EU and national legislations as well as with the participating userpartners internal data protection strategies The DMP provides an effective framework to ensure comprehensivecollection and handling of the data used in the project and will evolve during the lifetime of ENCHANT
Work Plan ver. 3The purpose of the Work Plan is to highlight and operationalize ENCHANT WP and task start-ups and dependencies, to handle dates and responsibilities related to deliverables, to give an overview of ENCHANT meetings, and to give an overview of ENCHANT document, risk and cost/schedule management.
Veröffentlichungen
Autoren:
Fuchs, D., Duetschke, E., Fahy, F., Garzon, J, Klöckner, C. A., & Sahakian, M. (under review).
Veröffentlicht in:
Consumption & Society, 2024, ISSN 2752-8499
Herausgeber:
Bristol University Press
Autoren:
Habibi Asagarabad, M., Vesely, S., Biresselioglu, M. E., Caffaro, F., Carrus, G., Demir, M. H., Kirchler, B., Kollmann, A., Massullo, C., Tiberio, L. & Klöckner, C. A. (in press)
Veröffentlicht in:
Plos one, 2024, ISSN 1932-6203
Herausgeber:
Public Library of Science
Autoren:
Sinea A., Pozsar, H., Liste Munoz L., Nilsen B. T., Tiberio, L, Massullo, C., and Carrus, G. (n.d.)
Veröffentlicht in:
Energy Research and Social Science, 2024, ISSN 2214-6296
Herausgeber:
Elsevier Limited
Autoren:
Habibi Asgarabad, M., Vesely, S. & Klöckner, C. A
Veröffentlicht in:
Consumption & Society, 2024, ISSN 2752-8499
Herausgeber:
Bristol University Press
DOI:
10.31219/osf.io/gd5ra
Autoren:
Christian Klöckner
Mojtaba Habibi Asgarabad
Mehmet Efe Biresselioglu2
Federica Caffaro
Giuseppe Carrus
Muhittin Hakan Demir
Benjamin Kirchler
Andrea Kollmann5
Chiara Massullo
Lorenza Tiberio
Stepan Vesely
Veröffentlicht in:
Nature Climate Change, 2024, ISSN 1758-6798
Herausgeber:
Springer Nature
DOI:
10.21203/rs.3.rs-3964680/v1
Autoren:
Klöckner, C. A., Nayum, A., & Vesely, S. (under review)
Veröffentlicht in:
Frontiers in Psychology, 2024, ISSN 1664-1078
Herausgeber:
Frontiers Research Foundation
DOI:
10.31219/osf.io/2haqm
Autoren:
Biresselioglu, M. E., and Demir, M. H., (under review)
Veröffentlicht in:
Frontiers in Psychology, 2024, ISSN 1664-1078
Herausgeber:
Frontiers Research Foundation
DOI:
10.31219/osf.io/7h2p3
Autoren:
Vesely, S., Klöckner, C. A., Carrus, G., Tiberio, L., Caffaro, F., Biresselioglu, M. E., ... & Sinea, A. C.
Veröffentlicht in:
Frontiers in Psychology, Ausgabe 13, 2022, Seite(n) 1-25, ISSN 1664-1078
Herausgeber:
Frontiers Research Foundation
DOI:
10.3389/fpsyg.2022.967318
Autoren:
Caffaro, F., Massullo, C., Carrus, G., Gastaldo, A., & Tiberio, L. (2023).
Veröffentlicht in:
Psicologia sociale, Ausgabe 18(3), 2023, Seite(n) 383-396, ISSN 2612-2006
Herausgeber:
Il Mulino
DOI:
10.1482/108587
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor