CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.
I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .
Risultati finali
Input D21 D22 D23 D24 D25This deliverable will provide a summary of WP2 results In particular it will summarize a description of the operational requirements from the Airport and ATC point of viewa description of the architecture and solutions from a business and operational point of viewcharacteristics of mechanism of detection identification and trackinga definition of AoI Area of Interesta description of the system to be used for support the running operation evolution according to requirements and of the action to be performed to reduce the dangers
Summary of Validation ResultsThis deliverable will provide a summary of the results found in WP3 Input D31 D32 D33 and D34
Final Project ReportFinal Project Report will summarize ASPRID key finding as well as key achievement towards the European ATM Master In particular the project will report on the achieved maturity steps but also report on the ongoing work in progress supported by a selfmaturity assessment
White Paper on Recommendations for Future Regulations applicable to the Protection of Airports from DronesThe deliverable will propose adaptations andor modifications of existing regulations in order to cope with potential regulatory obstacles identified in D41 and D42 The deliverable will address recommendations for drone operations counterdrone airport and ATM regulations Input from D41 D42 D34 Output to D53
Summary of scenarios assessmentThis deliverable based on D1.4 will derive the possible evolution due to counteractions in order to restore the situation back to normal (safe state). It will support requirements for a decision support system detailing: actors involved in the mitigation actions, specific alternative branch to be adopted, roles of actors, communication procedures, data to be exchanged, interfaces, etc., and conditions for restoring of the nominal condition
DEMO software implemented through an open source platform will be done Input from D21D22 and D31 Output to D34
This deliverable will provide a project webpage according to the designed contents during the initial stages of the project. Input from: D6.1 (Project Management and Quality Manual). Output to: D5.3 (Communication, Exploitation and Dissemination Intermediate Report) and D5.4 (Communication, Exploitation and Dissemination Final Report).
Pubblicazioni
Autori:
Pascarella D., Gigante G., Nebula F., Vozella A., Redondo De La Mata E., Jiménez Roncero F.J., Martinavarro E.
Pubblicato in:
13th International Conference on Electronics, Computers and Artificial Intelligence (ECAI), 2021
Editore:
IEEE International Conference
DOI:
10.1109/ecai52376.2021.9515046
Autori:
Domenico Pascarella, Gabriella Gigante, Angela Vozella, Pierre Bieber, Thomas Dubot, Edgar Martinavarro, Giovanni Barraco and Greta Li Calzi
Pubblicato in:
Aerospace, 2022, ISSN 2226-4310
Editore:
MDPI
DOI:
10.3390/aerospace9120747
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile