Deliverables
This deliverable will collect the main conclusions reached after finalizing the modelling basic and detail engineering and equipment development activities before the deployment of the UC6 and UC7
Paris urban area UC-2 complete solution descriptionThis deliverable will collect the main conclusions reached after finalizing the modelling basic and detail engineering and equipment development activities before the deployment of the UC2
Update of Report on user centric EV charging infrastructureUpdate of DLV35 The Update will be based on the conclusions reached during the Iterative validation loop phase
Tallinn extra-urban area UC-5 complete solution descriptionThis deliverable will collect the main conclusions reached after finalizing the modelling, basic and detail engineering and equipment development activities before the deployment of the UC-5.
Future strategies and recommendations to support e-mobilityA document including the main conclusions reached thanks to the activities carried out during WP2 will be summarized here. Specifically, the DLV will include propositions to incentivize different categories of users in the use of EVs.
Use cases evaluation from the users' perspectiveThis Report includes bio signal and acceptance studies addressing user experience in real conditions
Proposal for pricing and revenue models in the 7 uses casesBased on D9.4, the price for the services will be here detailed based on the competitive landscape. Additionally, this deliverable will include dynamic pricing strategies.
Mid-term Dissemination and Communication reportUpdate of D101 previously delivered
Project synergies reportThis deliverable is the outcome of Task 10.3. The main output of this document is to set the basis of the collaborations with the other mobility initiatives and other relevant EU funded projects.
First Update of ICT Data Management PlanFirst Update of DLV 5.4 The Update will be based on the conclusions reached during the Iterative validation loop phase.
Regulation and standards recommendations on electric infrastructure chargingThis deliverable will collect a set of specific recommendations for the public authorities of Europe. These recommendations will raise the awareness about the amendments needed in regulation towards the implementation of the most feasible and economical interventions for the EV wide implementation. Additionally, this deliverable will include the conclusions of the overall amendments that shall be done to the European Islands regulation in order to facilitate their transition to a greener environment while preserving the ecosystems
Grid, urban and road infrastructure upgrading for meeting users expectations reportThis DLV will consist in a report summarizing the developments of WP4 tasks. This DLV will made publicly available the general information of the reference charging solutions there designed.
Final report on communication and dissemination activitiesUpdate of D10.5 previously delivered.
Citizens and tourism engagementA final report including all the impressions, acceptance and feedback of the citizens and other local stakeholders, collected during the project activities of the INCIT-EV. This report will show the point of view of the cities´ stakeholders after the execution of the INCIT-EV project.
Final Update of Dissemination and Communication PlanFinal Update of Dissemination and Communication Plan previously delivered.
Dissemination and Communication Plan including project identity setThis DLV corresponds to Task 10.1. This deliverable explains how the project will communicate its developments and outcomes, and how the consortium will ensure visibility of the project and dissemination of its results throughout its duration. The main outcomes will be a plan identifying a set of dissemination activities to be implemented and a general communication strategy to follow during the project lifetime.
Update of User characterization: patterns and habitsAn update of DLV 21 will be here included base on the work developed during the first two years of the project
Turin peri-urban area UC-4 complete solution descriptionThis deliverable will collect the main conclusions reached after finalizing the modelling basic and detail engineering and equipment development activities before the deployment of the UC4
Use cases value proposition considering the whole ecosystemThis DLV will consist on a report including the proposition of the use cases once the whole ecosystem has been considered It will include the definition of the technical architecture of the global system to be designed to highlight how activities and resources are combined to deliver value
First Update of Dissemination and Communication PlanFirst Update of Dissemination and Communication Plan previously delivered.
Report on user centric EV charging infrastructureThis DLV will consist in a report summarizing the developments of WP3 tasks. This DLV will made publicly available the general information of the reference charging solutions there designed.
Zaragoza urban area UC-7 complete solution descriptionThis deliverable will collect the main conclusions reached after finalizing the modeling basic and detail engineering and equipment development activities before the deployment of the UC7
Replication potential of technologies in the EU. Action plans for the INCIT-EV cities and TEN-T corridorsThis DV will propose an ad-hoc action plan for each INCIT-EV city. This Action Plan will include the a) setting-up of the top-level Solutions (Use-Cases) configuration for those that are of interest for each city, among the seven available, b) the description of the setting goals for each city, c) the guided steps that need to be followed to ensure success and d) a rough time plan associated by a preliminary Investment plan.
Amsterdam-Utrecht urban area UC-1 complete solution descriptionThis deliverable will collect the main conclusions reached after finalizing the modelling basic and detail engineering and equipment development activities before the deployment of the UC1
ICT Data Management PlanA report including the ICT Data management plan for the data generated during the project.
Users expectations and concerns about e-mobilityThis report will include the conscious implicit associations and discrete choice analysis on users drivers motives and concerns about EVs
User characterization: patterns and habitsThe DLV consists of a report including a series of User characterization, patterns and habits.
Versailles extra-urban area UC-3 complete solution descriptionThis deliverable will collect the main conclusions reached after finalizing the modelling, basic and detail engineering and equipment development activities before the deployment of the UC-3.
Update of Grid, urban and road infrastructure upgrading for meeting users expectations reportUpdate of DLV46 The Update will be based on the conclusions reached during the Iterative validation loop phase
Final Update of ICT Data Management PlanSecond update of DLV 54 and consequently of DLV 510 The Update will be based on the conclusions reached during the Iterative validation loop phase
Demand Scenarios (Roadmap) for the different use cases through PESTEL and estimation of penetration curvesReport including penetration curves for the different competing technologies estimated with the consequent stochastic approach through a PESTEL analysis among other methodologies.
LCCA for the 7 use casesLife Cycle Cost Assessment of the use cases that will be demonstrated during the INCIT-EV project. It will include a roadmap to include the expected technology maturity over time.
List of users and stakeholders engaged for the use casesThe DLV consists of a report including a list of users to be involved in the activities of the project, especially in the Use cases demonstration activities.
This DLV consists on the designs and system to monitor the performance of the platform and its management
Implementation of INCIT-EV ICT platformDeveloped INCITEV platform where the ICT developments of the project will be included
Second stage of Implementation of INCIT-EV ICT platformUpdate of the Developed INCIT-EV platform where the ICT developments of the project will be included. The Update will be based on the conclusions reached during the Iterative validation loop phase.
Second stage of INCIT-EV user interfacesUpdate of DLV 5.6. The Update will be based on the conclusions reached during the Iterative validation loop phase.
This DLV corresponds to Task 10.2. It will define the style guideline to be used in the material developed during the project, generating among others, the templates, working papers or the promotional materials.
Final Update of Project visual materialsFinal Update of Project visual materials previously delivered.
Second Update of Project visual materialsSecond Update of Project visual materials previously delivered.
First Update of Project visual materialsFirst Update of Project visual materials previously delivered.
This deliverable will contain the main features that the website of the INCIT-EV project will contain. Including the release of the website itself.
Publications
Author(s):
Ziad OBEID, Virginie DENIAU, Alexandre DE BERNARDINIS, Karima BOUKIR , Zariff MEIRA, GUERROUDJ Salim,Gregorio FERNANDEZ, ANGEL Ricardo
Published in:
CIRED workshop on E-mobility and power distribution systems, Issue every year, 2022, Page(s) Paper n° 1206
Publisher:
CIRED
Author(s):
Antonio Miguel Munoz
Javier Ballestin-Fuertes
Gregorio Fernandez
Daniel Marquina
Ricardo Igea
Published in:
IEEE Pcim 2022, Issue EVERY YEAR, 2022
Publisher:
VDE
DOI:
10.30420/565822235
Author(s):
Davide La Gamba; Miriam Pirra; Francesco Deflorio; Luis Montesano; Angela Carboni; Maurizio Arnone
Published in:
2022 IEEE 46th Annual Computers, Software, and Applications Conference (COMPSAC), Issue 27 June 2022 - 01 July 2022, 2022, ISSN 0730-3157
Publisher:
IEE
DOI:
10.1109/compsac54236.2022.00270
Author(s):
Marta Bernal-Sancho; Roberto Rocca; Gregorio Fernández-Aznar; María Paz Comech; Noemí Galán-Hernández
Published in:
IEEE Access,, Issue 24, 2023, Page(s) Vol 11, Pp 76768-76780 (2023), ISSN 2169-3536
Publisher:
Institute of Electrical and Electronics Engineers Inc.
DOI:
10.1109/access.2023.3296220
Author(s):
Brahim Mazhoud; Thomas Gabet; Karim Kadem; Zariff Meira; Arnaud Sanzel; Eric Coquelle; Pierre Hornych
Published in:
Transportation Engineering, Issue VOL 10 DEC 22, 2022, ISSN 2666-691X
Publisher:
ELSEVIER ltd
DOI:
10.1016/j.treng.2022.100147
Author(s):
Macaluso, Piero; Carboni, Angela; Botta, Cristiana; Lazzeroni, Paolo; Deflorio, Francesco; Arnone, Maurizio
Published in:
Crossref, Issue 19, 2023, ISSN 1825-3997
Publisher:
Universita degli Studi di Trieste
DOI:
10.48295/et.2023.90.5
Author(s):
Giuseppe Brancaccio; Francesco Paolo Deflorio
Published in:
INTERNATIONAL JOURNAL OF SUSTAINABLE TRANSPORTATION, Issue 1, 2022, ISSN 1556-8318
Publisher:
Taylor and Francis
DOI:
10.1080/15568318.2021.2004629
Author(s):
García-Martínez, E.; Muñoz-Cruzado-Alba, J.; Sanz-Osorio, J.F.; Perié, J.M.
Published in:
Advances on Smart Cities and Smart Buildings, Issue Special Issue, 2021, Page(s) Appl. Sci. 2021, 11(23), 11496, ISSN 2076-3417
Publisher:
MDPI
DOI:
10.3390/app112311496
Author(s):
Sica, Lorenzo; Deflorio, Francesco
Published in:
Green Energy and Intelligent Transportation, - (2023), Issue 16, 2023, Page(s) Vol 2, Iss 2, Pp 100069, ISSN 2773-1537
Publisher:
Elsevier
DOI:
10.1016/j.geits.2023.100069
Author(s):
Družba ELES
Published in:
NOVO, Issue No. 1 (one issue per year), 2021, Page(s) 1
Publisher:
NOVO
Author(s):
Maša Repež Gril,ELES
Published in:
NAŠ STIK, Issue c2685 printed copiues + online access, 2022, Page(s) 32-33
Publisher:
ELES
Author(s):
Maša Repež Gril
Published in:
NAŠ STIK, Issue 06 March 2023, 2023
Publisher:
ELES
Author(s):
Gabet, Thomas; Mazhoud, Brahim; Kadem, Karim; Meira, Zariff; Sanzel, Arnaud; Coquelle, Eric; Sedran, Thierry; Hornych, Pierre
Published in:
Transportation Engineering, Issue 21, 2023, Page(s) 11, pp.100161.
Publisher:
ELSEVIER
DOI:
10.1016/j.treng.2023.100161
Author(s):
Dr JANEZ HUMAR
Published in:
NAŠ STIK, Issue N° 5/2020, 2020, Page(s) 44-45
Publisher:
ELES
Author(s):
Dr. Draško Veselinovič
Published in:
MOST Bulletin, Issue N° 63, 2020, Page(s) 1
Publisher:
Slovenian Business and Research Association
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available