Risultati finali
This is the result of the development of the MARKETFLEX tool. Related tasks: T5.4
Development of the GRIDFLEX tool v1This deliverable will provide the details of the development and implementation of the GRIDFLEX tool for DSO and grid operators Related tasks T44
Development of the GRIDFLEX tool v2This deliverable will provide the details of the development and implementation of the GRIDFLEX tool for DSO and grid operators. Related tasks: T4.4.
Value Analysis ToolThis is the result of the development of the Value Analysis Tool Related tasks T52
SERVIFLEX tool Development v1This deliverable will comprise in the SERVIFLEX software implementation for flexibility analysis forecasting clustering and management together with internal services for flexibility profiling Related tasks T35
SERVIFLEX tool Development v2This deliverable will comprise in the SERVIFLEX software implementation for flexibility analysis, forecasting, clustering and management, together with internal services for flexibility profiling. Related tasks: T3.5.
MARKETFLEX tool v1This is the result of the development of the MARKETFLEX tool Related tasks T54
This report documents the processes tools and procedures in order to manage and control the risks and events that could have a negative impact in the project Related tasks T11 T12
Flexibility Sources Mapping, Analysis and ClassificationThis report will provide a detailed overview of the flexibility sources (DERs) available in the X-FLEX demo sites, together with the analysis of their flexibility characteristics and their classification according to their suitability for the provision of different services to the grid. Related tasks: T3.1.
Analysis of grid infrastructure conditions and pilot sites formal analysisThis report will provide the formal analyse of the requirements and use cases to be demonstrated at each demo site in the context of grid conditions, considering the technical and operational constraints and regulatory, market and social conditions. Related tasks: T4.1.
Dissemination and Communication activities Report v3A report will be generated after each of the planned workshops dissemination and synergies activities containing the minutes report photo or video overview of the meeting presentation used participants list or number of people present and feedback from if appropriate the advisory board the user group people present This report will be updated on Month 36 and Month 48 Related tasks T91 92 and 93
Risk assessment report v1This report documents the processes, tools and procedures in order to manage and control the risks and events that could have a negative impact in the project. Related tasks: T1.1, T1.2.
Pilot site Albena reportThe report will describe the results from the pilot execution in Albena Related tasks T73
Operation and control of the grid services designThis deliverable will provide the details of the design ICT services to facilitate the grid operators to manage and control the network in a more efficient and secure way while avoiding massive investments in infrastructures Related tasks T42
Planning and Resilience monitoring of the gridThis deliverable will provide the details of the design of longterm planning and resilience monitoring of the energy grid Related tasks T43
Replication and Deployment HandbookThis handbook will describe all the technical legal and financial issues needed to deploy the XFLEX products and technologies Related tasks T84
System architecture definitionThe deliverable will contain results of the X-FLEX architecture definition including the description of components, their main functionalities, and interfaces. Related tasks: T2.4.
Final pilot sites conclusion reportThe report will show the main conclusions derived from the different pilots execution Related tasks T71 T72 T73 T74
P2X Flexibility Modelling and Specifications for an Intelligent P2H componentThis deliverable will provide insights into the flexibility capabilities of P2X and VTES solutions and will conclude with specifications of an innovative thermal storage software component Related tasks T33
Flexible and scalable integrated platform v2This is the result of the development of the flexible and scalable integrated platform Related tasks T63
Design specification of MARKETFLEX toolThe report provides a design specification of the MARKETFLEX tool to be used in the Tasks 54 and 55 Related tasks T53
Dissemination and Communication activities Report v2A report will be generated after each of the planned workshops dissemination and synergies activities containing the minutes report photo or video overview of the meeting presentation used participants list or number of people present and feedback from if appropriate the advisory board the user group people present This report will be updated on Month 36 and Month 48 Related tasks T91 92 and 93
Flexible and scalable integrated platform v1This is the result of the development of the flexible and scalable integrated platform Related tasks T63
Obstacles to innovation analysis (data management, business models, regulation and customer engagement) – (BRIDGE initiative cooperation)The report will include the initial analysis made in order to overcome of the obstacles to innovation and policy issues by means of the knowledge generated by similar EU-funded projects through the BRIDGE initiative. Related tasks: T2.3.
Design of the SERVIFLEX tool for Flexibility Forecasting, Clustering and ManagementThis report will provide the specifications for the SERVIFLEX tool and internal components for flexibility profiling Related tasks T34
Standards and data modelsThis deliverable is going to present, analyze, and possibly extend the standards to be used within the context of the X-FLEX project. Especially, with regards to the CIM [58], potential data objects needed for the modelling of the use cases of the project will be created as standards extensions of the CIM. Related tasks: T6.1.
Plan for Exploitation and Dissemination of ResultsDetail the strategy and concrete actions for the exploitation and dissemination of the project results to audiences that may use those results. Related tasks: T9.1
Communication Master PlanThis Plan will set out the communication activities to be undertaken by the project during its lifetime and after. The plan will include goals and outputs, target audience, messages, communication channels, key elements and will be reviewed and updated every year. Related tasks: T9.2
Pilot sites detailed project planThe report will describe in detail the plan activities across all X-FLEX pilot sites (Ravne, Luče, Albena and Xanthi). Related tasks: T7.1
Test reports for the flexible and scalable integrated platformThis deliverable will document the laboratory testing procedure the testing setup and environment as well as the testing results of the flexible and scalable integrated platform with thirdparty systemssoftware and the XFLEX products Related tasks T64
Dissemination and Communication activities Report v1A report will be generated after each of the planned workshops, dissemination and synergies activities containing the minutes, report, photo or video overview of the meeting, presentation used, participants list or number of people present, and feedback from- if appropriate-: the advisory board, the user group, people present. This report will be updated on Month 36 and Month 48. Related tasks: T9.1, 9.2 and 9.3
Evaluation and Impact assessment planThe report includes the impact assessment plan across different dimensions akin to SWOT framework and building it upon the KPIs defined in WP2 Related tasks T81
Project inception plan and best practices analysisThis report includes the analysis of best practices coming from other initiatives and projects and analysis of the current policies and regulatory framework. Related tasks: T2.1.
Pilot site Ravne and Luče reportThe report will describe the results from the pilot execution in Ravne and Lue Related tasks T72
Market mechanisms for using decentralised flexibilitiesThe report presents the results of the market mechanism assessment using Value Analysis Tool Related tasks T55
DER Flexibility ModellingThis deliverable will formalize the flexibility characteristics of batteries and EVs along with their control and response capabilities to achieve specific flexibility levels Related tasks T32
Overview and outlook of market mechanismsThe report details an overview of the existing market mechanisms and proposes additional new mechanisms which will serve as an input to T5.2. Related tasks: T5.1.
KPI identification and monitoring preparationThe report will provide the preliminary list of KPIs and the required data for the monitoring of the project impact. Related tasks: T2.5.
Pilot site Xanthi reportThe report will describe the results from the pilot execution in Xanthi Related tasks T74
Economic impact assessment and business model's analysis reportThe report describes results of the qualitative and quantitative economic analysis evaluating the impact of the XFLEX business models Related tasks T82
Architecture of the flexible and scalable integrated platformThis report will include a detailed description of the flexible and scalable integrated platform of the XFLEX project For describing the various functional and nonfunctional specification of the platform the Smart Grid Architecture Model SGAM framework 23 will be used and detailed information about the component communication information functional and business layers will be provided Also the interfaces between any thirdparty systems and the XFLEX products will be documented in this report Related tasks T62
BRIDGE cooperation activitiesThis report describes the work done as part of the BRIDGE initiative related to regulatory framework business models data management and consumer engagement Related tasks T15
Technical, environmental and social impact assessment reportThe report synthesizes the results of the qualitative and quantitative analysis evaluating for the different use cases the impact of the XFLEX solutions considering technical environmental and social aspects Related tasks T83
Use cases and requirements definitionThe deliverable will contain the description of the use cases and requirements that will be considered as the foundation of the project in the rest of the WPs. Related tasks: T2.2.
This report describes the data management life cycle for the data to be collected, processed and/or generated by the project. Related tasks: T1.4.
Pubblicazioni
Autori:
Chloe Fournely, Andrej F. Gubina, Edin Lakić, Bojan Stojanović.
Pubblicato in:
2022
Editore:
IEEE PES ISGT Europe 2022 conference
DOI:
10.1109/isgt-europe54678.2022.9960553
Autori:
Chloé Fournely, Matej Pečjak, Jernej Zupančič, Edin Lakić, Tomi Medved, Beatriz Ildefonso, Borut Jereb, Gašper Artač, Andrej F. Gubina
Pubblicato in:
2022
Editore:
15th Conference of Slovenian Electrical Power Engineers
DOI:
10.5281/zenodo.6353623
Autori:
Matej Pečjak, Jernej Zupančič, Edin Lakić, Andrej F. Gubina, Estelle Mayer
Pubblicato in:
2022
Editore:
18th International Conference on the European Energy Market Organising Committee
DOI:
10.1109/eem54602.2022.9920985
Autori:
Konstantinos TSATSAKIS; Efstratios PAPOUTSIS; Angeliki Lydia Antonia
Pubblicato in:
Numero 8, 2022
Editore:
15 th International Scientific Conference on Energy and Climate Change
DOI:
10.5281/zenodo.7743733
Autori:
TSATSAKIS KONSTANTINOS; TSAITSANIS ALEXANDROS
Pubblicato in:
Numero 2, 2021
Editore:
14th International Scientific Conference on Energy and Climate Change
DOI:
10.5281/zenodo.7743711
Autori:
Matej Pečjak, Chloé Fournely, Jernej Zupančič, Tomi Medved, Borut Jereb, Gašper Artač, Andrej F. Gubina
Pubblicato in:
2022
Editore:
15th Conference of Slovenian Electrical Power Engineers
DOI:
10.5281/zenodo.6372334
Autori:
Matej Pečjak, Jan Jeriha, Jernej Zupančič, Andrej Gubina, Chloé Fournely, Boštjan Blažič.
Pubblicato in:
2022
Editore:
IEEE PES ISGT Europe 2022 conference
DOI:
10.1109/isgt-europe54678.2022.9960660
Autori:
Chloé Fournely, Matej Pečjak, Tamara Smolej, Andreas Türk, Camilla Neumann.
Pubblicato in:
2021
Editore:
18th International Conference on the European Energy Market Organising Committee
DOI:
10.1109/eem54602.2022.9921138
Autori:
Elena Boskov Kovacs, Lazar Miletic, Bojan Stojanovic, Tomi
Medved, Matej Pečjak, Chloe Fournely.
Pubblicato in:
2022
Editore:
Cired Porto 2022
DOI:
10.1049/icp.2022.0898
Autori:
Chloe Fournely, Matej Pečjak, Tomi Medved.
Pubblicato in:
2022
Editore:
18th International Conference on the European Energy Market Organising Committee
DOI:
10.1109/eem54602.2022.9921072
Autori:
Pečjak, Matej; Fournely, Chloé; Lakić, Edin
Pubblicato in:
Numero 13, 2023
Editore:
19th International Conference on the European Energy Market (EEM23)
DOI:
10.1109/EEM58374.2023.10161697
Autori:
Svilen Piralkov, Nikolay Chavdarov, Stefan Sulakov
Pubblicato in:
Енергетика - Енергийни ракурси (EN: Energetics - Energy perspectives), 2021, ISSN 2682-9770
Editore:
ESO EAD
DOI:
10.5281/zenodo.6198791
Autori:
Denitsa Kuzeva, Nikolay Chavdarov, Stefan Sulakov
Pubblicato in:
2021, ISSN 2367-6728
Editore:
Scientific and technical union of power engineers in Bulgaria
DOI:
10.5281/zenodo.6123741
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile