Project description
Efficient and replicable solutions for integration of renewable energy sources
Bringing together 16 partners in 9 countries (Austria, Belgium, Finland, France, Germany, Greece, Hungary, India and Spain), the EU-funded IELECTRIX project will speed up the grid integration of renewable energy sources. Specifically, this multi-stakeholder project will enhance the role of distribution system operators in integrating local energy communities to the network. The project will pave the way for flexible and smart grids to overcome challenges posed by diverse geographical, technical and economic situations. By building solutions in a cooperative way, the project will help increase grid resilience and boost security of supply. The project is running pilot sites in Austria, Germany, Hungary and India.
Objective
An increasing role is foreseen in Europe for local energy communities (LECs) to speed up the grid integration of RES. To-day, the enabling role of DSOs in support of LECs is hampered by a lack of flexibility when planning cost-efficient LEC connections to their network at MV level, and by a lack of digitalization of the LV networks to make LEC’s smart prosumers benefit economically when serving the DSO flexibility needs. Four European DSOs (E.ON ENEDIS, E.DIS Güssing Stadtwerke) and an Indian DSO (TATA) have joined with IT-based, innovative product and solution providers, and technology and research centers, to demonstrate the combined roles of innovative functionalities serving the MV and LV networks, when implemented in 5 different regulatory regimes (Austria, France, Hungary, Germany, India- state of Delhi-).
For MV networks, a mobile storage concept at substation level is demonstrated in Hungary, Germany and Austria. It enables DSOs to reduce investment uncertainties, avoid hindering future renewables connection and foster the local use of flexibility with participating non-regulated market solutions (Demand Side Response-DR-).
For LV networks, 3 functional use cases served by ATOS and Schneider are tested simultaneously in Austria and India with prosumer support: i) Forecasting/scheduling of Distributed Energy Resources for the optimized energy management of Local Energy Systems, ii) Customized, human-centric prosumer participation in explicit DR programs using context-aware flexibility profiles, iii) Grid-forming/islanding capabilities in Local Energy Communities to optimize their energy system resilience.
The joint work of DSOS aims at accelerating scaling up and replication tested by HEDNO (Greece) and E.ON (Sweden). Dissemination towards players of the energy value chain recommends business models, possible regulatory adjustments and deployment roadmaps of the most promising use cases, in support of the implementation of the Clean Energy Package.
Fields of science
Keywords
Programme(s)
Funding Scheme
IA - Innovation actionCoordinator
92079 Paris
France
See on map
Participants (25)
Participation ended
7540 Gussing
See on map
15517 Furstenwalde Spree
See on map
9027 Gyor
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
Participation ended
205 09 Malmo
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
Participation ended
4024 Debrecen
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
45131 Essen
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
7626 Pecs
See on map
117 43 ATHINA
See on map
7540 Gussing
See on map
28037 Madrid
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
28760 Tres Cantos Madrid
See on map
92500 Rueil Malmaison
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
92500 Rueil Malmaison
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
08019 Barcelona
See on map
152 32 CHALANDRI ATHINA
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
38240 Meylan
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
Participation ended
00260 Helsinki
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
Participation ended
1180 Uccle
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
50018 Zaragoza
See on map
28015 Madrid
See on map
52062 Aachen
See on map
Participation ended
4174 Jystrup Midtsj
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
152 34 CHALANDRI
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
7540 Gussing
See on map
1783 Halden
See on map