Periodic Reporting for period 3 - INTERRFACE (TSO-DSO-Consumer INTERFACE aRchitecture to provide innovative grid services for an efficient power system)
Reporting period: 2022-01-01 to 2022-12-31
• Addressed the ethical issues and requirements of the project and outlined the project approach on the procedures to be implemented for data collection, storage, protection, retention and destruction and confirmation that they comply with national and EU legislation
• Finalized the second IEGSA release
• Finished the integration of IEGSA with all project demos
• Updated the IEGSA documentation (user manual and deployment manual)
• Finalized the Piloting phase in all 7 project demonstrators
• Extracted the most important results from demonstrators and performed a thorough evaluation
• Calculated final Key Performance indicators for all 7 demonstrators in order to verify the successful completion of the piloting phase
• Extracted and analyzed lessons learnt from demos and proposed recommendations towards relevant stakeholders
• Performed a thorough impact assessment on the demo results
• Finalized the execution of the 6 Open Call projects'
• Organized a Workshop presenting the results of the Open Call Projects
• Prepared and/or participated in communication and awareness raising activities promoting the
project and its results in web, social and physical means:
o Kept social media up to date
o Several scientific publications
o Participation to events at national and European level (conferences, events and workshops)
o Participation to BRIDGE initiative activities and meetings
o Organization of the final Annual INTERRFACE Flexibility Webinar
o Publication of the joint Paper with CoordiNet (“Sister” project of INTERRFACE)
o Issued a Newsletter
o Continued the Synergy with the OPEN DEI H2020 Project
o Organized the Project’s final Event with participation of many external Stakeholders and EC actors
o Published a Roadmap Addressing the scalability and replicability considerations for bringing IEGSA to the markets
o Published recommendations to policy makers and regulators
o Finalized the IPR Management of the Project
• Timely and appropriate trouble-shooting, immediate reaction to problems and misunderstandings and adequate use of all project resources by the project and technical management
INTERRFACE will demonstrate services for congestion management and local flexibility in the network, supporting the integration of new and existing distributed generation projects, and promoting innovative business models relating to emerging technologies such as bulk electrical energy storage. It will engage energy assets such as renewable generation and demand response in new ways in the energy market