Identifying best available technologies for decentralized wastewater treatment and resource recovery for India

CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.

Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .

Resultado final

Guidelines Document

The guidelines document will incorporate policy-based recommendations for sustaining the technologies in India and to open channels for replicating their manufacturing in India. This is emphasised in line with the Make in India initiative launched by the Indian government in 2014. It is related to task 6.10 and will be launched at the final event.

Report with basic control strategies for pilots 2,3 and 4

This report is based on task 41 and will summarize the basic control strategies that are proposed for pilots 23 and 4

Evaluation basic and advanced control strategies and recommendations

This report is based on task 4.3 and will evaluate and compare both basic and advanced control strategies under different scenarios and develop guidelines and recommendations.

Sustainability and Exploitation Plan 1

This DL will be the first version of the sustainability and exploitation plan and is based on task 6.5.

Comprehensive sustainability assessment report (not including LCA)

This report is based on tasks 5.2b-5.2g and will summarize the various aspects of the sustainability assessment of all piloted technologies (not including LCAs).

Report on application of an advanced MPC control strategy in pilot 5 and 10.

This report is based on task 4.2 and will summarize the experiences and results with the hybrid model predictive control systems in pilots 5 and propose a concept for pilot 10.

Sustainability and Exploitation Plan 2

This DL will be the final version of the sustainability and exploitation plan and is based on task 6.5.

Description of identified best available technologies

This report is based on task 5.3 and will summarize the work related to identification of best available technologies.

Dissemination and Comm. Plan 2

This DL encompasses the second version of the dissemination and communication plan for the project Task 62

Dissemination and Comm. Plan 1

This DL encompasses the first version of the dissemination and communication plan for the project (Task 6.1).

LCA reports

This report is based on task 5.2a and will summarize the LCAs that will be conducted for all piloted technologies.

Short videos and podcasts etc final version

This DL will be comprised of additional communication and promotional materials such as videos and podcasts as outlined in task 6.3.

Project website

This DL will be comrpised of the developed project webpage for Saraswati 2.0 (Task 6.2).

Communication and Promotional Materials; Project Introduction Video

This DL will be comprised of various communication and promotional materials as well as the project introduction video (Task 6.3).

Short videos and podcasts etc

This DL will be comprised of additional communication and promotional materials such as videos and podcasts as outlined in task 6.3.

Data Management Plan final version

This DL will be comprised the final version of DL 7.2 (brief data management plan). If a partner plans to use data collected during the course of the project for an academic publication (in line with the consortium agreement) it will only be made available to the public after the paper has been accepted/published.

Data Management Plan

This DL will be comprised of a brief data management plan. If a partner plans to use data collected during the course of the project for an academic publication (in line with the consortium agreement) it will only be made available to the public after the paper has been accepted/published.

Pilot 8 implementation report

Pilot 8 Task 28 The DL will be a report that briefly summarizes the process of pilot implementation including eg an outline of the design background information pictures of different construction phases The DL will be coled by partner IITKGP

Pilot 2 implementation report

Pilot 2 (Task 2.2) The DL will be a report that briefly summarizes the process of pilot implementation, including e.g. an outline of the design, background information, pictures of different construction phases;

Pilot 1 implementation report final version

Pilot 1 (Task 2.1) The DL will be a report that briefly summarizes the process of pilot implementation, including e.g. an outline of the design, background information, pictures of different construction phases; This DL will be co-led by partner IITBBS.

Pilot 6 implementation report

Pilot 6 Task 26 The DL will be a report that briefly summarizes the process of pilot implementation including eg an outline of the design background information pictures of different construction phases The DL will be coled by partner IITKGP

Pilot 4 implementation report

Pilot 4 (Task 2.4) The DL will be a report that briefly summarizes the process of pilot implementation, including e.g. an outline of the design, background information, pictures of different construction phases; The DL will be co-led by partner NITIE.

Pilot 5 implementation report final version

Pilot 5 (Task 2.5) The DL will be a report that briefly summarizes the process of pilot implementation, including e.g. an outline of the design, background information, pictures of different construction phases; The DL will be co-led by partner IITKGP.

Pilot 4 implementation report final version

Pilot 4 (Task 2.4) The DL will be a report that briefly summarizes the process of pilot implementation, including e.g. an outline of the design, background information, pictures of different construction phases; The DL will be co-led by partner NITIE.

Pilot 1 implementation report

Pilot 1 (Task 2.1) The DL will be a report that briefly summarizes the process of pilot implementation, including e.g. an outline of the design, background information, pictures of different construction phases; This DL will be co-led by partner IITBBS.

Pilot 10 implementation report

Pilot 10 (Task 2.10) The DL will be a report that briefly summarizes the process of pilot implementation, including e.g. an outline of the design, background information, pictures of different construction phases; The DL will be co-led by partner IITM.

Pilot 3 implementation report

Pilot 3 Task 23 The DL will be a report that briefly summarizes the process of pilot implementation including eg an outline of the design background information pictures of different construction phases This DL will be coled by partner MNIT

Pilot 5 implementation report.

Pilot 5 (Task 2.5) The DL will be a report that briefly summarizes the process of pilot implementation, including e.g. an outline of the design, background information, pictures of different construction phases; The DL will be co-led by partner IITKGP.

Pilot 7 implementation report

Pilot 7 Task 27 The DL will be a report that briefly summarizes the process of pilot implementation including eg an outline of the design background information pictures of different construction phases The DL will be coled by partner IITR

Publicaciones

Using Treated Wastewater for Non-Potable Household Uses in Peri-Urban India: Is It Affordable for the Users?

Autores: Norbert Brunner, Sukanya Das, Anju Singh, Markus Starkl
Publicado en: Water, Edición 16, 2024, Página(s) 2838, ISSN 2073-4441
Editor: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/w16192838

Can International Nonsewered Sanitation Standards Help Solve the Global Sanitation Crisis?

Autores: Clément A Cid, Francine Abiola, and Markus Starkl
Publicado en: Environmental Science & Technology, 2022, ISSN 0013-936X
Editor: American Chemical Society
DOI: 10.1021/acs.est.1c03471

Decentralized Wastewater Management in India: Stakeholder Views on Best Available Technologies and Resource Recovery

Autores: Norbert Brunner, Sukanya Das, Anju Singh, Markus Starkl
Publicado en: Water, Edición 15, 2023, Página(s) 3719, ISSN 2073-4441
Editor: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/w15213719

Start-Up of Anammox SBR from Non-Specific Inoculum and Process Acceleration Methods by Hydrazine

Autores: Ivar Zekker, Oleg Artemchuk, Ergo Rikmann, Kelvin Ohimai, Gourav Dhar Bhowmick, Makarand Madhao Ghangrekar, Juris Burlakovs, Taavo Tenno
Publicado en: Water, Edición 13(3), 2021, Página(s) 350, ISSN 2073-4441
Editor: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/w13030350

Sustainability Assessment for Wastewater Treatment Systems in Developing Countries

Autores: Markus Starkl, Norbert Brunner, Sukanya Das and Anju Singh
Publicado en: water, 2022, ISSN 2073-4441
Editor: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/w14020241

ANAMMOX-denitrification biomass in microbial fuel cell to enhance the electricity generation and nitrogen removal efficiency

Autores: Ivar Zekker, Gourav Dhar Bhowmick, Hans Priks, Dibyojyoty Nath, Ergo Rikmann, Madis Jaagura, Taavo Tenno, Kaido Tämm, Makarand Madhao Ghangrekar
Publicado en: Biodegradation, Edición 31, 2020, Página(s) 249–264, ISSN 1572-9729
Editor: Springer Nature B.V.
DOI: 10.1007/s10532-020-09907-w

Lotka-Volterra analysis of river Ganga pollution in India

Autores: Norbert Brunner, Sukanya Das, Markus Starkl
Publicado en: Ecological Indicators, Edición 150, 2024, Página(s) 110201, ISSN 1470-160X
Editor: Elsevier BV
DOI: 10.1016/j.ecolind.2023.110201

Unlocking the genomic potential of aerobes and phototrophs for the production of nutritious and palatable microbial food without arable land or fossil fuels.

Autores: Abbas Alloul; Janne Spanoghe; Daniel Machado; Siegfried E. Vlaeminck
Publicado en: Microbial Biotechnology, Vol 15, Iss 1, Pp 6-12 (2022), Edición 1, 2022, ISSN 1751-7915
Editor: John Wiley & Sons Ltd and Society for Applied Microbiology
DOI: 10.1111/1751-7915.13747

A novel mechanistic modelling approach for microbial selection dynamics: Towards improved design and control of raceway reactors for purple bacteria

Autores: Abbas Alloul, Ali Moradvandi, Daniel Puyol, Raúl Molina, Giorgio Gardella, Siegfried E. Vlaeminck, Bart De Schutter, Edo Abraham, Ralph E.F. Lindeboom, David G. Weissbrodt
Publicado en: Bioresource Technology, Edición 390, 2023, Página(s) 129844, ISSN 0960-8524
Editor: Elsevier BV
DOI: 10.1016/j.biortech.2023.129844

Operational Strategies to Selectively Produce Purple Bacteria for Microbial Protein in Raceway Reactors

Autores: Abbas Alloul, Marta Cerruti, Damian Adamczyk, David G. Weissbrodt, Siegfried E. Vlaeminck
Publicado en: Environmental Science & Technology, Edición 55, 2023, Página(s) 8278-8286, ISSN 0013-936X
Editor: American Chemical Society
DOI: 10.1021/acs.est.0c08204

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles