Livrables
Report on Exploitation and Dissemination activities
D1.1.2 Communication, Dissemination and exploitation planPlan for Use & Exploitation and Dissemination of Foreground.
D5.2.1 Flight Test ReportFlight test result will be collected in a unique document, necessary as base point for successive R&T phase. This report is very important, not only for ODESSA consortium, but for future development regarding crossing technologies between automotive and aeronautic contest.
D6.1.1 Performance Analysis ReportThis report is necessary to upgrade the “state of of the art” stage regarding performances of a ported sensor. This report can be considered as a starting point from R&T process to R&D.
D1.1.5-Project Management PlanThe Project Management Plan will include the Schedule of the macro and micro activities ( eg. Gantt Diagram) . It will be used by the coordinator and task leaders to track and monitor the project schedule and the deliveries.
Publications
Auteurs:
Lorenzo Travaglini, Iacopo De Angelis ( Interconsulting)
Publié dans:
Aerospace Tech Week, 2021, Page(s) 1
Éditeur:
aerospace tech week review
DOI:
10.5281/zenodo.4556715
Auteurs:
Prof. Dauvignac (CNRS) , with the support of consortium technical team
Publié dans:
IEEE national conference on Radar, Numéro N.A, 2020, Page(s) 8
Éditeur:
IEEE
DOI:
10.5281/zenodo.4275500
Auteurs:
Iacopo De Angelis, Federico Lçolli
Publié dans:
Numéro N.A., 2020
Éditeur:
Interconsulting S.R.L.
DOI:
10.5281/zenodo.4556759
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible