Risultati finali
As part of task 43 this deliverable will report on the creation of the initial design of a heat exchanger with capability to cool the brine to a temperature of around 50C
Report on design and building of retention tankAs part task 45 this report will describe the designing and building of retention tank The antiscaling coatings applied for the heat exchanger will also be applied during to the retention tank
Modeling of scaling potential of geofluidAs part of task 4.1, this deliverable will report on the mathematical modelling of silica scaling potential. The model will be tested and validated.
Heat exchanger design trial reportAs part of task 23 this deliverable will report on the modelling of TES systems Inputs from PG GmbH and ZORLU will be required to correctly represent the flexibility needs and other components of the plant as boundary conditions of the model
Correct material choices documented for demo sitesAs part of task 21 the deliverable will report on the screening of material options at relevant usage temperature for GeoSmart application
Updated End user spec & documnet agreed with users, including KPIs for two case study sitesUpdated End user spec document agreed with users including KPIs for two case study sites
End user spec & documnet agreed with users, including KPIs for two case study sitesThis report will include KPIs identified, under task 1.1, to evaluate the functionalities of the GeoSmart systems. It will also outline the needs and constraints of the users.
Energy storage system design schematicsAs part of task 22 this deliverable will report on the preliminary designs of the storage systems for each GeoSmart deployment case The designs will be based on heat source temperature pressure flow rate etc and end user requirements capacity temperature ranges heat transfer rates
Flow assurance simulator implementation of new geofluid modelsAs part of task 51 this deliverable reports on integration of geofluid modelling into FA simulator This geochemistry modelling will be enhanced by implementation of the scaling induction period models developed in WP4
As part of task 9.1, an advisory board will be recruited.
Project WebsiteAs part of task 9.6, a project website will be launched.
Pubblicazioni
Autori:
Balkan Mutlu; Derek Baker; Feyza Kazanç
Pubblicato in:
Entropy, Numero 1, 2021, ISSN 1099-4300
Editore:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.20944/preprints202105.0542.v1