CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
D1.2 will contain the• description of the work performed during the CLASS Project• conclusion of the evaluation of the UTMS prototype (T4.3)• improvements of the UTM Prototype, needed to comply to the CONOPS.• valuable recommendations for follow up actions
Design document of real time capabilities of UTMSD3.1 will define the real time tracking capabilities of the UTMS and how they are implemented.
"Proceedings Workshop #2"D1.5 contains the minutes of the second workshop (WS2) organised to retrieve feedback on intermediate results in order for the project to validate its work plan for the final stage.
Scenarios and KPI for the UTMS DemonstrationD1.1 will explicit the scenarios to fly during the live experimentation and the demonstrator run. D1.1 will also detail the Key Performance Indicators to be used for the evaluation of the performance reached by the prototype of UTMS
Implementation of De-confliction Advanced Function: definition and resultsD3.3 presents the implementation of the de-confliction algorithms. It finally analyses the recommendation given by the algorithms for performance assessment.
"Proceedings Workshop #1"D1.4 contains the minutes of the first workshop (WS1) organised to retrieve user requirements and to ask for inputs relevant to the project.
Live Experimentation: Configuration and resultsD2.3 describes the live experimentation deployment, configuration and set up, as well as the flights performed. It contains analyses of the flight performed.
Data Fusion: definition and resultsD2.2 describes the work performed and the results achieved in the frame of the data fusion of Cooperative and Non-Cooperative data flows.
Video of the live experimentationD2.4 is a promotional video on the live experimentation for communication and dissemination purposes.
Communication and Dissemination Plan and ReportThe first version of D1.3 will detail the communication and dissemination actions to be undertaken during the implementation of CLASS. The final version will also provide the actions' achievement.
Definition of the cooperative and uncooperative surveillance systemsD2.1 contains the definition and description of both tracking systems . Cooperative tracking system under the responsibility of Airbus . Non-Cooperative tracking system under the responsibility of Aveillant
Publications
Author(s):
K. Cisek, E. Brekke, M. Jahangir, T. A. Johansen
Published in:
Issue Paper 2614, 2019
Publisher:
IEEE Aerospace Conference
Author(s):
Jacob Sim, Chris J Baker, Mohammed Jahangir, Francesco Fioranelli, Holly Dale
Published in:
2019
Publisher:
Radar 2019 Conference
Author(s):
Mohammed Jahangir, Chris J Baker
Published in:
2019
Publisher:
International Radar Symposium
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available