Objective
Today’s world PV market is dominated by standard crystalline solar cells (so-called Al-BSF cells) and part of the market is shifting to PERC solar cells. The shift is obtained by introducing three additional process steps to the standard process (rear side cleaning, passivation and laser opening), and allows a gain of typically 1% absolute in efficiency. Next generation c-Si technologies should feature higher voltage solar cells with higher efficiency and less processing steps in the manufacturing, allowing for further cost reduction, both at the PV panel level and for the final cost of solar electricity. AMPERE focuses on technologies with such a potential and capitalizes on the high tech investments made in Europe over the last decade for establishing advanced manufacturing processes for crystalline silicon heterojunction (SHJ) solar cells and modules, on the development of hardware capable of coating at high speed and low cost homogeneous materials of high electronic quality. It also bases on the unique expertise gained in production of thin film modules, and in all hardware issues related to large area coatings in production environment, which can applied for the production of SHJ cells and modules. The final goal of the project is t the setting-up of a 100 MW full-scale automated pilot line in production environment at the 3Sun fab, while preparing the next steps to 300 MW and GW scale. The project will operate with the support of full technology platforms for solar cells at CEA and the platform for advanced module technologies at MBS. It will demonstrate practically the ultra-low cost potential of such manufacturing approaches, as well as the even more impressively low solar electricity generation costs thanks to high efficiency and/or intrinsic bifaciality of the selected technologies.
Fields of science
- engineering and technologymechanical engineeringmanufacturing engineering
- engineering and technologyenvironmental engineeringenergy and fuelsrenewable energy
- engineering and technologyelectrical engineering, electronic engineering, information engineeringelectrical engineeringpower engineeringelectric power generation
- social sciencessociologyindustrial relationsautomation
- engineering and technologymaterials engineeringcoating and films
Programme(s)
Funding Scheme
IA - Innovation actionCoordinator
00198 Roma
Italy
See on map
Participants (15)
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
00198 Rome
See on map
2068 HAUTERIVE NE
See on map
3645 Gwatt Thun
See on map
75015 PARIS 15
See on map
00196 Roma
See on map
2000 Neuchatel
See on map
1015 Lausanne
See on map
278 OSLO
See on map
EC3A 8AA LONDON
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
20124 Milano
See on map
10553 BERLIN
See on map
1117 BUDAPEST
See on map
00185 Roma
See on map
00121 Roma
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
80686 Munchen
See on map