Demonstration of INTElligent grid technologies for renewables INTEgration and INTEractive consumer participation enabling INTEroperable market solutions and INTErconnected stakeholders

CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.

I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .

Risultati finali

Stakeholder feedback and acceptance report in SE

The report summarizing stakeholder feedback and end-user evaluation collected through dedicated surveys in two demonstration sites: Stockholm Royal Seaport and Hammarby Sjöstad.

Business models to support the developed concepts

This deliverable will present the results of subtask 7.3.1. The goal of this subtask is to identify and propose a set of business models and evaluate their potential implementation under the different regulatory and market conditions found in the target countries. The results of the stakeholder consultation perform in subtask 7.3.2, and presented in D7.6 will be used to update and refine the proposed business models.

Replication roadmap

This deliverable will present the results of task 8.5 and will summarize the best practices and elaborate a roadmap out of them. For this, the results of the scalability and replicability analysis will be analysed in a process including external stakeholders in order to elaborate a replication roadmap identifying best practices and proposing replication paths.

Updated comparative analysis of regulatory frameworks in the target countries

This deliverable will present the results of subtask 7.1.1. The goal of this subtask is to build on the activities of Task 1.3 in order to provide a comprehensive an updated review of existing regulatory frameworks in the target countries (Portugal, Spain, Sweden and Slovenia). This review will be used as the starting point for the subsequent critical analysis to identify existing barriers and propose specific regulatory recommendations.

Detailed specification and guidelines for field testing in SL

This report will detail the field-test procedures of selected tools, according to the use cases defined in WP1.

Economic and regulatory scalability and replicability of the InteGrid smart grid functionalities

This deliverable will present the results of task 8.4. The goal of this task is to identify the factors that may act as barriers or enablers for an effective and efficient deployment of the proposed technologies and solutions in the target countries as well as other selected countries within the project consortium and/or stakeholder board members. The topics considered will include the DSO economic regulation and the design of energy and ancillary services markets.

Consumers’ engagement strategies

Design of innovative engagement strategies with a mix of several welfare criteria targeting communities

DSO grid Stakeholder feedback and acceptance report in SL

Stakeholder feedback reports from demonstration use cases

Report from the joint monitoring of demos

This deliverable will present the results of task 2.5. The goal of this task is to collect information from the demonstrators, to be used for the scalability and replicability analysis (SRA) as well as the CBA analysis, and to quantify and evaluate the demonstration results. This work follows the implementation plan from Task 2.4 and consists in: (1) information collection from the demonstrators via regular meetings and two workshops with demo leaders and participants; (2) extraction and analysis of the relevant data for the SRA from the measurement data repositories used by each demonstrator; (3) Computation and analysis of KPIs defined in Task 1.2 and refined in Task 2.4.

Use cases and requirements

Definition of the use cases and requirements of the functions to be demonstrated. The report will also contain a list of defined KPI.

Business models resulting from the innovative concepts

The purpose of this deliverable is to cope with the economic and business framework of the solutions developed in this work package, namelly the VPP concept and the HEMS, which put a special focus on the customer as an active player of the energy system. The report intends to assess the market and regulatory conditions for the deployment of this solutions.

Implementation plan for demonstration

Plan for the installation and configuration of equipment and/or systems; strategies for fostering end-user engagement where applicable; measurement and calculation of the KPI’s defined in WP1.

Stakeholder feedback and acceptance report in PT

This deliverable aims to summarize the results obtained with the user engagement, namelly: involvement of the end-user on the residential levels and their overall evaluation (impacts, advantages, disadvantages, recommendations) of the HEMS installed in theirs houses the same evaluation and inputs are gathered from other stakeholders, such as the industrial partner, giving insights on the impacts, advantages, disadvantages and recommendations.

Regulatory barriers in target countries and recommendations to overcome them

This deliverable will present the results of subtask 7.1.2. The goal of this subtask is to identify existing regulatory barriers to the implementation of successful smart grid solutions (leveraging on demonstration activities, the CBA and the SRA) tested within the project and provide recommendations to overcome them. This analysis will be focused on the selected target countries (Portugal, Spain, Sweden and Slovenia), although they may also be applicable for similar EU contexts.

Basis for the cost-benefit analysis

This deliverable will present the results of subtask 7.2.1. The goal of this subtask is to perform all preparatory activities for carrying out the CBA analysis: scope definition, scalability analysis, mapping assets, functionalities and benefits, and baseline definition for the target countries.

Website

Within this deliverable, the website of the project will be developed. The website will provide information on the objectives and deliverables of the project, the progress of the work, project partners and will also serve as one of the main tools for dissemination of key findings of the project. It will also provide links to other similar projects and activities across the EU and the world.

Technical scalability and replicability of the InteGrid smart grid functionalities

This deliverable will present the results of tasks 8.1 and 8.2. This deliverable will - Identify and formalize the factors impacting the deployment potential of smart grid technologies (in terms of scalability and replicability) - Assess the scalability and replicability (technical, economic and regulatory) of the of the smart grid technologies implemented and tested in the InteGrid demonstrators from the technical point of view.

Validation test plan

This deliverable is the outcome of Subtask 2.3.1. It describes the devices under test, and the test plan and schedule for the validation of the functions developed in Task 2.1 (grid management prototypes) and Task 2.2 (grid user active participation prototypes). The test plan addresses hardware and software tests, aiming at functional testing, compliance with current standards, and safety, reliability and security testing. Different validation methods are used: simulation, experimental activities in laboratory and hardware-in-the-loop testing.

Report on current market and regulatory incentives and barriers

This deliverable will present the results of task 1.3. The goal of this task is to perform a preliminary assessment of the existing regulatory frameworks and market designs in the target countries and review the regulatory recommendations provided by previous European projects and relevant working groups. This deliverable will be a reelevant input to the work in WP7 which will update the regulatory review, identify existing barriers to the deployment of the tested solutions and propose specific recommendations.

Stakeholder consultation

This deliverable will present the results of subtask 7.3.2. The goal of this subtask is to carry out a consultation process among relevant stakeholders in order to identify limiting factors and acceptance issues concerning the aforementioned business models. This deliverable will summarize the consultation means implemented (surveys, interviews, workshops, etc.) as well as the results obtained and will be a key input to incorporate not only purely technical and economic aspects, but also environmental, socioeconomic and stakeholders perceptions.

Cost-benefit analysis (methodology and results)

This deliverable will present the results of subtask 7.2.2. The goal of this subtask is to collect all the data necessary to perform the CBA of the tested smart grid solutions and to actually perform the quantitative analysis. This report will include a senstitivty analysis to relevant parameters under two different scenarios: i) isolated operation of the individual solutions and ii) integrated operation of the different concepts/technologies.

Pubblicazioni

FROM HOME ENERGY MANAGEMENT SYSTEM LOCAL FLEXIBILITY TO LOW VOLTAGE PREDICTIVE GRID MANAGEMENT

Autori: Lopes, Diogo; André, Ricardo; Moreira, Jorge; Simões, Micael; Sampaio, Gil; Rua, David; Machado, Paulo; Bessa, Ricardo; Abreu, Cláudia; Madureira, André
Pubblicato in: Numero 2, 2020
Editore: CIRED
DOI: 10.5281/zenodo.4055563

A SERVICE CATALYST PROVIDING A NEUTRAL FRAMEWORK FOR SUPPORTING GRID OPERATION, WHILE PROMOTING MARKET-BASED SERVICES: GRID AND MARKET HUB

Autori: Moreira, Jorge; Bernardo, Rui; Prata, Ricardo; Krisper, Ursula; Bessa, Ricardo; Coelho, Fábio; Schwarzländer, Fritz
Pubblicato in: 2020
Editore: CIRED
DOI: 10.5281/zenodo.4055190

Data Economy for Prosumers in a Smart Grid Ecosystem

Autori: Ricardo J. Bessa, David Rua, Cláudia Abreu, Paulo Machado, José R. Andrade, Rui Pinto, Carla Gonçalves, Marisa Reis
Pubblicato in: Proceedings of the Ninth International Conference on Future Energy Systems - e-Energy '18, 2018, Pagina/e 622-630, ISBN 9781-450357678
Editore: ACM Press
DOI: 10.1145/3208903.3210282

LV network control architecture: H2020 InteGrid case study

Autori: José Costa, Célia Trocato, Jorge Moreira, David Rua, André Madureira and David Fonseca
Pubblicato in: 2018
Editore: CIRED
DOI: 10.5281/zenodo.1406902

Smart grid Ellevio - Demo Stockholm

Autori: E. Lejerskog, J. Johansson, I. Felix, M. Esteén, S. Rebner, L. Selberg, O. Hansson
Pubblicato in: 2019
Editore: 25th International Conference on Electricity Distribution (CIRED 2019)
DOI: 10.5281/zenodo.3531401

Predictive Voltage Control for LV Distribution Grids exploiting Flexibility from Domestic Customers

Autori: M. F. Simões; H. M. Costa; A. G. Madureira
Pubblicato in: Numero 1, 2018
Editore: MEDPOWER 2018
DOI: 10.5281/zenodo.3245401

Avoid technical problems in LV networks: from data-driven monitoring to predictive control

Autori: M. Simões, G. Sampaio, A. Madureira, R.J. Bessa, J. Pereira, D. Lopes, D. Fonseca, P. Godinho Matos, R. Pires
Pubblicato in: 2019
Editore: 25th International Conference on Electricity Distribution (CIRED 2019)
DOI: 10.5281/zenodo.3530268

Demonstration of the technical and commercial VPP concept: Slovenian demo in the InteGrid project

Autori: Krisper, Ursula; Turha, Boris
Pubblicato in: Numero 1, 2018
Editore: CIRED
DOI: 10.5281/zenodo.1406914

New Business Models Enabled by Smart Grid Technology and their Implications for DSOs

Autori: Leandro Lind, Rafael Cossent, Pablo Frías
Pubblicato in: 2019
Editore: 25th International Conference on Electricity Distribution (CIRED 2019)
DOI: 10.5281/zenodo.3529520

Probabilistic Low-Voltage State Estimation Using Analog-Search Techniques

Autori: Ricardo Bessa, Gil Sampaio, Vladimiro Miranda, Jorge Pereira
Pubblicato in: 2018 Power Systems Computation Conference (PSCC), 2018, Pagina/e 1-7, ISBN 978-1-910963-10-4
Editore: IEEE
DOI: 10.23919/pscc.2018.8443074

Grid and Market Hub: Empowering Local Energy Communities in InteGrid

Autori: Matos, Pedro; Prates, Inês; Pires, Guido; Bessa, Ricardo; Coelho, Fábio; Rodrigues, Xavier; Alonso, Ana; Soares, Tiago; Shahrokni, Hossein; Mäkivierikko, Aram
Pubblicato in: 2018
Editore: CIRED
DOI: 10.5281/zenodo.1406924

The Traffic Light System to support Flexibility Exploitation from stressed distribution grids

Autori: J.Le Baut, F.Leimgruber, C.Korner, C.Gutschi
Pubblicato in: 2019
Editore: 25th International Conference on Electricity Distribution (CIRED 2019)
DOI: 10.5281/zenodo.3530240

Grid and Market Hub Platform to enable a data-driven smart grid economy

Autori: Coelho, Fábio; Rodrigues, Xavier; Bessa, Ricardo J.; Castro, João; Moreira, Jorge; Matos, Pedro G.; Matos, Rafael; Gregório, Nuno; Silva, Manuel Pio
Pubblicato in: Numero 1, 2019
Editore: 26th International Conference on Electricity Distribution (CIRED 2019)
DOI: 10.5281/zenodo.3529491

Identifying a Potential for the Development of the New Services for the DSO

Autori: Ursula Krisper; Turha Boris; Kržišnik Miha
Pubblicato in: Numero 1, 2019
Editore: """14. KONFERENCA SLOVENSKIH ELEKTROENERGETIKOV – Laško 2019 14th Conference of Slovenian Electrical Power Engineers CIDED ŠK 6-05 """
DOI: 10.5281/zenodo.3532103

InteGrid pilot in Portugal: Smart Grid based flexibility management tools for LV and MV predictive grid operation

Autori: André, Ricardo; Lopes, Diogo; Fonseca, David; Almeida, Bernardo; Bessa, Ricardo; Madureira, André; Simões, Micael; Silva, João; Sampaio, Gil; Andrade, José; Viana, João; Ramirez, Javier; Gutschi, Christoph
Pubblicato in: Numero 2, 2020
Editore: CIRED
DOI: 10.5281/zenodo.4055407

INTEGRATED MONITORING SYSTEM TO ASSESS LV FLEXIBILITY IMPACT

Autori: Morena, Álvaro; Santos, Ricardo; Lopes, Diogo; Antunes, Luis; Sousa, José; Ahmad, Yasin; Mourão, José; Moreira, Jorge; Oliveira, José; Cordeiro, Flávio; Galhardo, Bruno
Pubblicato in: Numero 3, 2020
Editore: CIRED
DOI: 10.5281/zenodo.4055599

Effective design of in-home displays

Autori: Carmen Valor; Carmen Escudero; Victoria Labajo; Rafael Cossent
Pubblicato in: Renewable and Sustainable Energy Reviews, Numero Volume 114, October 2019, 2019, Pagina/e NA, ISSN 1364-0321
Editore: Elsevier BV
DOI: 10.31224/OSF.IO/MGNX2

Multi-period flexibility forecast for low voltage prosumers

Autori: Rui Pinto, Ricardo J. Bessa, Manuel A. Matos
Pubblicato in: Energy, Numero 141, 2017, Pagina/e 2251-2263, ISSN 0360-5442
Editore: Pergamon Press Ltd.
DOI: 10.1016/j.energy.2017.11.142

Probabilistic Price Forecasting for Day-Ahead and Intraday Markets: Beyond the Statistical Model

Autori: José Andrade, Jorge Filipe, Marisa Reis, Ricardo Bessa
Pubblicato in: Sustainability, Numero 9/11, 2017, Pagina/e 1990, ISSN 2071-1050
Editore: MDPI Open Access Publishing
DOI: 10.3390/su9111990

Household responsiveness to residential demand response strategies: Results and policy implications from a Swedish field study

Autori: Anders Nilsson, David Lazarevic, Nils Brandt, Olga Kordas
Pubblicato in: Energy Policy, Numero 122, 2018, Pagina/e 273-286, ISSN 0301-4215
Editore: Pergamon Press Ltd.
DOI: 10.1016/j.enpol.2018.07.044

Exploring the viability of a local social network for creating persistently engaging energy feedback and improved human well-being

Autori: Aram Mäkivierikko, Paula Bögel, Annika N. Giersiepen, Hossein Shahrokni, Olga Kordas
Pubblicato in: Journal of Cleaner Production, Numero 224, 2019, Pagina/e 789-801, ISSN 0959-6526
Editore: Elsevier BV
DOI: 10.1016/j.jclepro.2019.03.127

Data-driven predictive energy optimization in a wastewater pumping station

Autori: Jorge Filipe, Ricardo J. Bessa, Marisa Reis, Rita Alves, Pedro Póvoa
Pubblicato in: Applied Energy, Numero 252, 2019, Pagina/e 113423, ISSN 0306-2619
Editore: Pergamon Press Ltd.
DOI: 10.1016/j.apenergy.2019.113423

Monitoring systems for secondary substations – a comparative study

Autori: Joar Johansson, Henrik Sporre, Lars Selberg, Olle Hansson
Pubblicato in: CIRED - Open Access Proceedings Journal, Numero 2017/1, 2017, Pagina/e 350-354, ISSN 2515-0855
Editore: IET
DOI: 10.1049/oap-cired.2017.0103

Smart homes, home energy management systems and real-time feedback: Lessons for influencing household energy consumption from a Swedish field study

Autori: Anders Nilsson, Misse Wester, David Lazarevic, Nils Brandt
Pubblicato in: Energy and Buildings, Numero 179, 2018, Pagina/e 15-25, ISSN 0378-7788
Editore: Elsevier BV
DOI: 10.1016/j.enbuild.2018.08.026

A Novel Methodology for the Scalability Analysis of ICT Systems for Smart Grids Based on SGAM: The InteGrid Project Approach

Autori: Sergio Potenciano Menci, Julien Le Baut, Javier Matanza Domingo, Gregorio López López, Rafael Cossent Arín, Manuel Pio Silva
Pubblicato in: Energies, Numero 13/15, 2020, Pagina/e 3818, ISSN 1996-1073
Editore: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en13153818

Distribution Grid Fault Location: An Analysis of Methods for Fault Location in LV and MV Power Distribution Grids

Autori: J. von Euler-Chelpin
Pubblicato in: 2018
Editore: Uppsala University

Evaluation of a Centralized Substation Protection and Control system for HV/MV Substation

Autori: J. Ljungberg
Pubblicato in: 2018
Editore: Uppsala University

Internet of Things. Information Processing in an Increasingly Connected World - First IFIP International Cross-Domain Conference, IFIPIoT 2018, Held at the 24th IFIP World Computer Congress, WCC 2018, Poznan, Poland, September 18-19, 2018, Revised Selected Papers

Autori: Mário Nunes, Rita Alves, Augusto Casaca, Pedro Póvoa, José Botelho
Pubblicato in: IFIP International Internet of Things Conference, 2019, Pagina/e 121-132, ISBN 978-3-030-15651-0
Editore: Springer Link
DOI: 10.1007/978-3-030-15651-0

Smart Energy City Final Report Stockholm Royal Seaport

Autori: Fortum, Ellevio, ABB, Ericsson, Electrolux, KTH and Swedish Energy Agency
Pubblicato in: 2018
Editore: Swedish Energy Agency

Diritti di proprietà intellettuale

METHOD AND DEVICE FOR CONTROLLING A WASTEWATER TANK PUMPING SYSTEM

Numero candidatura/pubblicazione: 19 168270
Data: 2019-04-09

METHOD AND DEVICE FOR CONTROLLING A WASTEWATER TANK PUMPING SYSTEM

Numero candidatura/pubblicazione: 19 168270
Data: 2019-04-09

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile