Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

ADvancing user acceptance of general purpose hybridized Vehicles by Improved Cost and Efficiency

CORDIS fournit des liens vers les livrables publics et les publications des projets HORIZON.

Les liens vers les livrables et les publications des projets du 7e PC, ainsi que les liens vers certains types de résultats spécifiques tels que les jeux de données et les logiciels, sont récupérés dynamiquement sur OpenAIRE .

Livrables

Report on state of the art and requirements

Deliverable D2.1 Report on state of the art and requirements (AVL-S, M6) Target of this deliverable is to provide a state of the art review for the technology to be provided in WP1 and summarize the technology and market requirements for these components. This deliverable shall serves as basis for the following deliverables.

Testing procedures

D3.1 Testing procedures Description of the testing procedures applied in ADVICE with purpose to fulfill the expected impacts of the project central theme. Basis for D 3.2 and D 3.3

Final Dissemination Report

D7.8 Final Communication & Dissemination Report (VIF, M36) (related to Task7.2)

Project webpage

D7.1 Project webpage (IESTA, M3) (related to Task7.2)

First ADVICE Newsletter

D7.12 Newsletter (IESTA, M12) (related to Task7.2) On a regular basis, the public will be informed of the progress and the main results of the ADVICE project. Contributions to the Newsletters will be provided by all partners

Second ADVICE Newsletter

D7.13 Newsletter (IESTA, M24) (related to Task7.2)

Dissemination Plan

D7.6 Updated Dissemination Plan (IESTA, M12) (related to T7.2) The Dissemination Plan and its updates provide the strategic and the according operative dissemination activities foreseen by the consortium. It contains the identification of stakeholders with a corresponding mapping of results to be communicated and the corresponding communication channels. The Report on Dissemination Activities is the counter piece to the Dissemination Plan, specifying which activities from the Dissemination Plan have been realized in which way and lists further dissemination activities realized by partners outside the strategic dissemination planning.

Report of requirements for HEVs optimal operations

Evaluation driving scenarios and the optimal operation of HEV systems in such. These activities will especially focus on: • Offline optimization of vehicle speed profiles along a given mission having prior knowledge about all boundary conditions like e.g. road maps, weather, visibility, traffic • Offline optimized set point profiles of energy management for different generic vehicle topologies

Third ADVICE Newsletter

D7.14 Newsletter (IESTA, M36) (related to Task7.2)

Publications

Review of Thermal Management of catalytic converters to decrease engine emissions during cold start and warm-up

Auteurs: Gao, J, tian, G., Sorniotti, A., Karci, A., Di Palo, R.
Publié dans: Applied Thermal Engineering, 2018, ISSN 1359-4311
Éditeur: Pergamon Press Ltd.

A Constrained Eco-Routing Strategy for Hybrid Electric Vehicles Based on Semi-Analytical Energy Management

Auteurs: Giovanni De Nunzio, Antonio Sciarretta, Ibtihel Ben Gharbia, Luis Leon Ojeda
Publié dans: Proceeding of 21st IEEE International Conference on Intelligent Transportation Systems, 2018
Éditeur: IEEE

A General Constrained Optimization Framework for the Eco-Routing Problem: Comparison and Analysis of Solution Strategies for Hybrid and Electric Vehicles

Auteurs: Ben Gharbia I., De Nunzio G, Sciarretta A
Publié dans: Transportation Research Part C, Numéro Under review (2nd round), 2020
Éditeur: Elsevier

Recherche de données OpenAIRE...

Une erreur s’est produite lors de la recherche de données OpenAIRE

Aucun résultat disponible