CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
The plan will be finally checked on their indicators and a final summary of their results will be included
Biodegradable packaging for food applicationBionatic will report on the performance of their specific materials that will be produced in the WP3 and WP4 in the manufacturing of packaging prototypes and the major parameters of the end packaging unit. The specifications parameters which were defined in the beginning of the project will be compared to the prototypes and possible improvement and further development activity will be detailed.
Project communication planThis plan will be proposed for validation by General Assembly, and will detail the strategy adopted (audience, type and hierarchy of actions, responsible persons) and planning for the project duration. Several performance indicators will be proposed to assess the level of visibility and efficiency of actions. The main goal of the communication task will be to propose activities to inform a wide audience: public, media but also closer stakeholders
Biodegradable packaging for cosmetic applicationStefanski will study the performance of their materials that will be produced in the WP4 in the manufacturing of packaging prototypes and the major parameters of the end packaging unit. The specifications parameters which were defined in the beginning of the project will be compared to the prototypes and possible improvement and further development activity will be detailed.
Biodegradable packaging for medical device applicationCOSMETIC will study the performance of their materials that will be produced in the WP4 in the manufacturing of packaging prototypes and the major parameters of the end packaging unit. The specifications parameters which were defined in the beginning of the project will be compared to the prototypes and possible improvement and further development activity will be detailed.
Project communication plan M18 updateThe first plan D7.1 will be checked on their indicators and modified if considered necessary
Project dissemination actions M18This plan, in connection with the exploitation plan will be developed in order to establish and update a strategy for the actions and review past / future activities to achieve a proper dissemination and use of the foreground developed during the project. On this stage will be centred in the plans for dissemination during the last 18months of the project, where the results of the project start to appear.
Publications
Author(s):
Katharina Emmert; Sabine Amberg-Schwab; Francesca Braca; Agostino Bazzichi; Antonio Cecchi; Ferdinand Somorowsky
Published in:
Polymers, Issue 20734360, 2021, Page(s) 1257, ISSN 2073-4360
Publisher:
MDPI
DOI:
10.3390/polym13081257
Author(s):
Marius Wolf, Frederik Berger, Stefan Hanstein, Anke Weidenkaff, Hans-Ulrich Endreß, Arne Michael Oestreich, Mehrdad Ebrahimi, Peter Czermak
Published in:
ACS Omega, Issue 24701343, 2022, Page(s) 13436-13447, ISSN 2470-1343
Publisher:
ACS Publications
DOI:
10.1021/acsomega.1c06055
Author(s):
J. Hoffmann, S. Hanstein, C. Hubert, R. Stauber
Published in:
Chemie Ingenieur Technik, Issue 90/9, 2018, Page(s) 1154-1154, ISSN 0009-286X
Publisher:
Wiley - V C H Verlag GmbbH & Co.
DOI:
10.1002/cite.201855048?af=r
Author(s):
Anna Reising, Stefan Hanstein, Karolina Kazmierczak, Karin Titze-Frech
Published in:
Chemie in unserer Zeit, Issue 52/5, 2018, Page(s) 287-287, ISSN 0009-2851
Publisher:
Wiley - V C H Verlag GmbbH & Co.
DOI:
10.1002/ciuz.201800836
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available