Deliverables
It will be the output of T2.4 and it will report all activities relevant to standardisation conducted during the project.
NeMo Hyper-Network validationThis will be the output of T6.4 and will present the analysis of data collected in the test sites, in the Hackathon and in the cross-country test, validating the Hyper-Network against the requirements and evaluating its impact on acceptance as well its societal and environmental consequences.
Business model and regulatory guidelinesThis will be the outcome of T7.3 and T7.4 and it will present for each use case of WP1 the actors’ value, the value sharing model among actors and a subscription and set up process to ensure the performance of this service. It will also detail blueprints for closing regulatory gaps and efficient implementation within EU member states.
Communication Strategy and PlanThis will be the output of T8.1 and it will include the communication, dissemination and liaison plan to be followed within the project.
Proceedings of the NeMo Final EventThis will be the output of T8.3 and it will include the presentations and a report on discussions during the NeMo final Conference and demonstration.
Communication Strategy and Plan - second updateThis will be the output of T8.1 and it will include the communication, dissemination and liaison plan to be followed within the project. The deliverable will be updated on a yearly basis.
Communication Strategy and Plan - first updateThis will be the output of T8.1 and it will include the communication, dissemination and liaison plan to be followed within the project.
First Updated Report on latest technological and market developments in electromobilityThis deliverable is the output of T1.2, and will be the first update of D1.2.
Consolidated Version of the Use Cases and the Actors’ RequirementsThis deliverable is a common output of T1.1, T1.3 and T1.4. It will comprise of the identified actors list, the use cases selected for the Hyper-Network, as well as all functional and non-functional requirements identified as a result, including data privacy and security requirements.
Global adoption methodology and self-certification methodology for CPOs and EMPThis will be the outcome of T7.1 and T7.2 and it will present a methodology for global adoption of NeMo requirements and specifications by a panel of actors and a self-certification methodology for CPOs and EMP with handover to an international association.
Interoperability and Regulatory RequirementsThis deliverable is the output of T1.5 and will include all requirements in interoperability or regulatory frameworks that need to be taken into account for the Hyper-Network design and development.
NeMo communication tools - first updateThis will be the output of T8.2 and it will accompany and present the communication tools update at the project mid-term.
NeMo communication toolsThis will be the output of T8.2 and it will accompany and present the project brand identity and material, the brochure, posters, newsletters, videos, website and social media accounts.
Second Updated report on latest technological and market developments in electromobilityThis deliverable is the output of T1.2, and will be the second update of D1.2.
Report on latest technological and market developments in electromobilityThis deliverable is the output of T1.2, and will have an initial interim report to be used in the Hyper-Network design phase (M08).
NeMo communication tools - second updateThis will be the output of T8.2 and it will accompany and present the communication tools usage during the project duration.
This Deliverable will be the output of T3.5 and will define the Common Information Models for use within the NeMo Hyper-Network, taking into account and incorporating all existing data modelling standards related to electromobility and smart-grid services. The Deliverable will be updated to include standards’ updates.
NeMo open European Inter-Roaming protocolThis deliverable will be the output of T3.4 and will produce the open European Inter-Roaming protocol specifications.
Publications
Author(s):
Maria Pia Fanti, Giovanni Pedroncelli, Michele Roccotelli, Stefano Mininel, Gabriella Stecco, Walter Ukovich
Published in:
2017 IEEE International Conference on Service Operations and Logistics, and Informatics (SOLI), 2017, Page(s) 162-167, ISBN 978-1-5090-5847-1
Publisher:
IEEE
DOI:
10.1109/SOLI.2017.8120988
Author(s):
Maria Pia Fanti, Agostino Marcello Mangini, Michele Roccotelli, Massimiliano Nolich, Walter Ukovich
Published in:
2018 IEEE International Conference on Systems, Man, and Cybernetics (SMC), 2018, Page(s) 3853-3858, ISBN 978-1-5386-6650-0
Publisher:
IEEE
DOI:
10.1109/smc.2018.00653
Author(s):
Maria Pia Fanti, Massimiliano Nolich, Michele Roccotelli, Walter Ukovich
Published in:
2018 5th International Conference on Control, Decision and Information Technologies (CoDIT), 2018, Page(s) 635-640, ISBN 978-1-5386-5065-3
Publisher:
IEEE
DOI:
10.1109/codit.2018.8394872
Author(s):
Maria Pia Fanti, Agostino Marcello Mangini, Michele Roccotelli, Bartolomeo Silvestri, Salvatore Digiesi
Published in:
2019 IEEE 15th International Conference on Automation Science and Engineering (CASE), 2019, Page(s) 1048-1053, ISBN 978-1-7281-0356-3
Publisher:
IEEE
DOI:
10.1109/coase.2019.8842852
Author(s):
Johannes Fähndrich, Sabine Weber, Hannes Kanthak
Published in:
Semantic Technology - 8th Joint International Conference, JIST 2018, Awaji, Japan, November 26–28, 2018, Proceedings, Issue 11341, 2018, Page(s) 165-181, ISBN 978-3-030-04283-7
Publisher:
Springer International Publishing
DOI:
10.1007/978-3-030-04284-4_12
Author(s):
Nils Masuch, Elif Eryilmaz, Tobias Kuster, Udo Pletat, Johannes
Fahndrich, Thodoris Theodoropoulos, Mariza Koukovini, and Natalia
Selini Hadjidimitriou
Published in:
Springer Lecture Notes in Mobility 2019, 2019
Publisher:
Springer
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available