Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

SELF-INSTALLING TELESCOPIC SUBSTRUCTURE FOR LOW-COST CRANELESS INSTALLATION OF COMPLETE OFFSHORE WIND TURBINES. DEEP OFFSHORE 5MW PROTOTYPE

Objective

In ELICAN, a strong team of complementary European companies with worldwide leading presence in the Wind Energy industry join forces to provide the market with a disruptive high-capacity and cost-reducing integrated substructure system for deep offshore wind energy. The technology is exceptionally fitted to meet the technical and logistical challenges of the sector as it moves into deeper locations with larger turbines, while allowing for drastic cost reduction.
This project will design, build, certify and fully demonstrate in operative environment a deep water substructure prototype supporting Adwen’s 5MW offshore wind turbine, the be installed in the Southeast coast of Las Palmas (Canary Islands). It will become the first bottom-fixed offshore wind turbine in all of Southern Europe and the first one worldwide to be installed with no need of heavy-lift vessels.

The revolutionary substructure consists in an integrated self-installing precast concrete telescopic tower and foundation that will allow for crane-free offshore installation of the complete substructure and wind turbine, thus overcoming the constraints imposed by the dependence on heavy-lift vessels. It will allow for a full inshore preassembly of the complete system, which is key to generate a highly industrialized low-cost manufacturing process with fast production rates and optimized risk control.

The main benefits to be provided by this ground-breaking technology are:
• Significant cost reduction (>35%) compared with current solutions.
• Direct scalability in terms of turbine size, water depth, infrastructure and installation means.
• Complete independence of heavy-lift vessels
• Excellently suited for fast industrialized construction.
• Robust and durable concrete substructure for reduced OPEX costs and improved asset integrity.
• Suitable for most soil conditions, including rocky seabeds.
• Enhanced environmental friendliness regarding both impact on sea life and carbon footprint.

Call for proposal

H2020-LCE-2014-2015

See other projects for this call

Sub call

H2020-LCE-2015-2

Coordinator

ESTEYCO SA
Net EU contribution
€ 5 110 610,59
Address
CALLE MENENDEZ PIDAL 17
28036 Madrid
Spain

See on map

SME

The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.

Yes
Region
Comunidad de Madrid Comunidad de Madrid Madrid
Activity type
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Links
Total cost
€ 7 408 463,75

Participants (9)