Ziel

In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance components and immature international regulations and financial instruments. PROMOTioN will overcome these barriers by development and demonstration of three key technologies, a regulatory and financial framework and an offshore grid deployment plan for 2020 and beyond. A first key technology is presented by Diode Rectifier offshore converter. This concept is ground breaking as it challenges the need for complex, bulky and expensive converters, reducing significantly investment and maintenance cost and increasing availability. A fully rated compact diode rectifier converter will be connected to an existing wind farm. The second key technology is an HVDC grid protection system which will be developed and demonstrated utilising multi-vendor methods within the full scale Multi-Terminal Test Environment. The multi-vendor approach will allow DC grid protection to become a “plug-and-play” solution. The third technology pathway will first time demonstrate performance of existing HVDC circuit breaker prototypes to provide confidence and demonstrate technology readiness of this crucial network component. The additional pathway will develop the international regulatory and financial framework, essential for funding, deployment and operation of meshed offshore HVDC grids. With 35 partners PROMOTioN is ambitious in its scope and advances crucial HVDC grid technologies from medium to high TRL. Consortium includes all major HVDC and wind turbine manufacturers, TSO’s linked to the North Sea, offshore wind developers, leading academia and consulting companies.

Aufforderung zur Vorschlagseinreichung

H2020-LCE-2014-2015

Andere Projekte für diesen Aufruf anzeigen

Unterauftrag

H2020-LCE-2015-3

Finanzierungsplan

IA - Innovation action

Koordinator

DNV NETHERLANDS BV
Netto-EU-Beitrag
€ 3 470 541,22
Adresse
UTRECHTSEWEG 310
6812 AR Arnhem
Niederlande

Auf der Karte ansehen

Region
Oost-Nederland Gelderland Arnhem/Nijmegen
Aktivitätstyp
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Links
Gesamtkosten
€ 6 521 229,46

Beteiligte (49)