Achieving near Zero and Positive Energy Settlements in Europe using Advanced Energy Technology

Objectif

"In ZERO-PLUS, a comprehensive, cost-effective system for Net Zero Energy (NZE) settlements will be developed and implemented. The system will be composed of innovative solutions for the building envelope, for building energy generation and management, and for energy management at the settlement level. A reduction of operational energy usage to an average of 0-20 kWh/m2 per year (compared with the current average of 70-230 kWh/m2) will be achieved through a transition from single NZE buildings to NZE settlements, in which the energy loads and resources are optimally managed.
A primary objective of the project will be to develop a system whose investment costs will be at least 16% lower than current costs. In order to reduce ""balance of system"" costs, an approach of mass customization will be employed. Mass produced technologies will be integrated in a system that is optimally designed according to the local climate and site of each project in which it is implemented. To this end, a structured process will be developed and applied for the integration, optimization and verification of the design.
The project's work programme will ensure a rapid market uptake, within its four-year scope, of the innovative solutions that will be developed. These solutions will be implemented in four different demonstration projects throughout the EU, with varying climates and building types. The results of their implementation will be monitored, analyzed and disseminated. A comprehensive market analysis and business plan will support the commercial exploitation of the project's results. The project will be carried out by a consortium that includes universities, project owners, technology providers and organizations, which will closely collaborate in all the project's phases.
"

Appel à propositions

H2020-EE-2014-2015

Voir d’autres projets de cet appel

Sous appel

H2020-EE-2015-1-PPP

Régime de financement

IA - Innovation action

Coordinateur

ETHNIKO KAI KAPODISTRIAKO PANEPISTIMIO ATHINON
Contribution nette de l'UE
€ 405 062,50
Adresse
6 CHRISTOU LADA STR
10561 Athina
Grèce

Voir sur la carte

Région
Αττική Aττική Κεντρικός Τομέας Αθηνών
Type d’activité
Higher or Secondary Education Establishments
Liens
Coût total
€ 405 062,50