Resultado final
The deliverable will be a Cement and Lime industry CCS Roadmap This will be based on the design construction WP3 and testing of the LEILAC pilot plant WP4 the results of the technoeconomic modelling and retrofit analysis activities T51 T52 and T53It should provide substantive findings of use to policy makers CCS advocates lime and cement plant operators lime and cement plant technology providers and the general public
Life Cycle Assessment (LCA)The public version of the assessment will articulate the enhanced benefits of Direct Separation technology.
Verified Technoeconomics report summary (public)Public version of the Technoeconomics report
Environmental reportA summary of the environmental monitoring activities
The public summary of the Front End Engineering and Design (FEED) study of Task 3b.4.
Feasibility study summary (public)A public summary version of the Feasibility study (public) resulting from Task 3b.3 PRE-FEED study
Publicaciones
Autores:
Thomas P. Hills, Mark Sceats, Daniel Rennie, Paul Fennell
Publicado en:
Energy Procedia, Edición 114, 2017, Página(s) 6166-6170, ISSN 1876-6102
Editor:
Elsevier Ltd
DOI:
10.1016/j.egypro.2017.03.1753
Derechos de propiedad intelectual
Número de solicitud/publicación:
AU
2013904639
Fecha:
2013-11-29