Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

RESilience management guidelines and Operationalization appLied to Urban Transport Environment

Livrables

Back end reference architecture and specifications

provides a detailed description of the architecture for the CRAMSS system and it a result derived from Task 4.1.

European Resilience Management Guidelines, M36

This deliverable is at the core of the RESOLUTE project. The ERMG will be refined according to the validation feedbacks coming from WP6 and from the Advisory Stakeholder Board & User Forum and it is dependent of Task3.3

Integration Framework Implementation

provides the specifications of the integration framework as an outcome of Task 4.5.

Blue print of user experience and interaction for CRAMSS and Apps, M22

this document will present the user requirements for the CRAMSS applications and is an outcome of Task5.1.

Blue print of user experience and interaction for CRAMSS and Apps, M14

this document will present the user requirements for the CRAMSS applications and is an outcome of Task5.1.

Proceedings of the final event

represents the release of the proceedings for the final event and it is related to dissemination activities in Task 7.2

Synthesis and scoping for RESOLUTE

describes the project conceptual framework and understanding of Urban Transport Systems and is an outcome of Task 2.5.

Information Model and Interoperability

represents a report describing how reference architecture shall facilitate integration process related to heterogeneous systems and it represents an outcome of Task 4.3.

State of the Art review and assessment report

represents a report on resilience perspectives, methods and concepts, as well as existing training trends, main contents and structures and is an outcome of Task 2.1, 2.2, 2.3, 2.4.

Multi source data acquisition

represents a report on how various data sources are being exploited and it is an outcome of Task 4.2.

Report on exploitation and business models for RESOLUTE technologies

contains the exploitation and business models for the project’s results and it is related to Task 7.5.

Guidelines methodology

in this document will be defined roles, procedures, responsibilities, communication protocols, and the like in order to secure participation, representation, high quality of the result conflict reduction and so forth during the ERMG definition process, and is dependent of Task 3.2.

Proceedings of the third workshop

represents the release of the proceedings for the third workshop and it is related to dissemination activities in Task 7.2.

Application framework

this report includes detailed information related network based predictive modelling for infrastructure resilience in UTS and the user profile management definition as an outcome of Task 4.3.

ERMG adaptation to UTS, M12

will contain the definition of the system requirements and real user operational scenarios relevant to UTS case and it will be refined according the validation feedback from WP6 and from the Advisory Stakeholder Board & User Forum; it is an outcome of Task 3.4.

Proceedings of the second workshop

represents the release of the proceedings for the second workshop and it is related to dissemination activities in Task 7.2.

Proceedings of the first workshop

represents the release of the proceedings for the first workshop and it is related to dissemination activities in Task 7.2.

UTS Pilot validation

the document will contain the also the test results for the UTS pilot ERMG derived scenarios validation activity and it derives from Task 6.5.

European Resilience Management Guidelines, M12

This deliverable is at the core of the RESOLUTE project. The ERMG will be refined according to the validation feedbacks coming from WP6 and from the Advisory Stakeholder Board & User Forum and it is dependent of Task3.3.

ERMG adaptation to UTS, M36

contain the definition of the system requirements and real user operational scenarios relevant to UTS case and it will be refined according the validation feedback from WP6 and from the Advisory Stakeholder Board & User Forum; it is an outcome of Task 3.4.

CRAMSS application

represents the release of the CRAMSS application and is the outcome of Task5.2.

Game based Training App

represents the release of the smart device app. The smart app will be released for OSx and Android and will be adapted for Mobile phones, tablet, etc. and is the outcome of Task 5.4.

Mobile Emergency support App

represents the release of the smart device app. The smart app will be released for OSx and Android and will be adapted for Mobile phones, tablet, etc. as a result of Task 5.3

Publications

Functional resonance analysis method based-decision support tool for urban transport system resilience management

Auteurs: Emanuele Bellini, Paolo Nesi, Gianni Pantaleo, Alessandro Venturi
Publié dans: 2016 IEEE International Smart Cities Conference (ISC2), 2016, Page(s) 1-7, ISBN 978-1-5090-1846-8
Éditeur: IEEE
DOI: 10.1109/ISC2.2016.7580833

Recherche de données OpenAIRE...

Une erreur s’est produite lors de la recherche de données OpenAIRE

Aucun résultat disponible