Skip to main content
European Commission logo
polski polski
CORDIS - Wyniki badań wspieranych przez UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

STORY- Added value of STORage in distribution sYstems

Rezultaty

Newsletter 8

Advances of the project to be disseminated to the other LCE 6-10 projects.

Newsletter 4

Advances of the project to be disseminated to the other LCE 6-10 projects.

Brochure 2

Brochures and flyers related to the project progress to be distributed to the stakeholders.

Demonstration Site Movies

Visually appealing time lapse videos (2-3 minutes) for each of the 5 demonstration sites which can effectively explain and powerfully promote the significance of energy storage solutions

Newsletter 9

Advances of the project to be disseminated to the other LCE 6-10 projects.

Newsletter 2

Advances of the project to be disseminated to the other LCE 6-10 projects.

Brochure 3

Brochures and flyers related to the project progress to be distributed to the stakeholders.

Newsletter 5

Advances of the project to be disseminated to the other LCE 6-10 projects.

Newsletter 3

Advances of the project to be disseminated to the other LCE 6-10 projects.

Educational Movies

Set of up to 5 whiteboard movies (2 to 3 minutes each) explaining and supporting the STORY project.

Newsletter 1

Advances of the project to be disseminated to the other LCE 6-10 projects.

Webinar on Recommendations

Recommendations on integrating and encouraging energy storages for policy makers and regulatory authorities in the form of a webinar.

Brochure 1

Brochures and flyers related to the project progress to be distributed to the stakeholders.

Newsletter 6

Advances of the project to be disseminated to the other LCE 6-10 projects.

Policy Brief on Recommendations

Recommendations on integrating and encouraging energy storages for policy makers and regulatory authorities in the form of a blog contribution.

Newsletter 7

Advances of the project to be disseminated to the other LCE 6-10 projects.

Input to BRIDGE co-operation

Input to the BRIDGE co-operation on current and emerging standards for smart grids.

Requirements definition of the hardware to be deployed

Market screening to find the hardware components that best match the project defined criteria. A best fit and best price/quality fit is selected for the building, neighborhood, and district communication in the demonstration sites.

Energy Storage Deployment Handbook

The handbook on business models for the deployment of energy storage will include chapters on business model archetypes, and chapters on market, policy, and regulatory frameworks. The handbook will be further enriched with the results from the demos in this project, and with case studies and testimonials from experts that will be interviewed over the period of the project.

Specific Deployment Oriented Reports

Deployment oriented reports about topics emerging from the interactions with the stakeholders.

Report on performance evaluation of control

Report on the performance of the control algorithms developped for storage integration.

Periodic Report 1

Periodic report 1: Draft Report to the Commission covering period 1 i.e. months 1-12 of the project (M12). Final report to be delivered, to the EC, within 60 days after the end of the reporting period.

Summarizing Report on the Stakeholders Workshops

Reports summarizing the stakeholders workshops.

Final report

Final report: Draft final report covering all project (M60). Final report to be delivered, to the EC, within 60 days after the end of the reporting period.

Report on Large Scale Storage Implementation Simulation Results

Evaluation of the impact of large scale implementation of distributed energy storage, using the market-driven, regulated or mixed approach, on: o Maximization of RES integration: impact on RES curtailment on local scale/ on system-wide scale o Grid Challenges and the costs of storage mitigation measures o Required grid investments: some of the investments can be deferred if the peak load is reduced by storage, but some approaches might demand for investments. o Distribution network operation o Power system security. o Environmental and social impacts of large scale storage integration

Overview of requirement for embedding measurements for services on ICT

Overview of the typical requirements that measurement and data logging equipment poses on the ICT infrastructure.

Demonstration Protocol Book

Book on measurement protocols meant to feed the discussions by providing clear and practice oriented information. Illustrations are added from the demonstrations were relevant and avoiding conflicts of interest. Other LCE6-10 projects are invited to add information.

Report Chapter on Performance Evaluation

Monitoring and evaluation of the 8 demonstration sites.

Replication plan

Plan to support a large scale roll out of the successful concepts from STORY and from ideas extracted from the other LCE6-10 projects.

Periodic report 3

Periodic report 3: Draft report to the Commission covering period 3 i.e. months 24-42 of the project (M42). Final report to be delivered, to the EC, within 60 days after the end of the reporting period.

Structured overview of communication standards for smart grids

Overview of the current and emerging standards for smart grids.

Report on interoperability guidelines

Guidelines addressing in-depth interoperability, substantially improving on the state-of-the-art. These guidelines contain solutions on how to design and build interoperable components and subsystems that can be integrated with little effort and time. The guidelines allow the integration of components and subsystems into an overall system while insuring good performances.

Updated report on interoperability guidelines (D3.6)

The Interoperability guidelines reported in D3.6 will be updated by adding the learnings from the demonstrations in the original version.

Periodic report 2

Periodic report 2: Draft report to the Commission covering period 2 i.e. months 13-24 of the project (M24). Final report to be delivered, to the EC, within 60 days after the end of the reporting period.

Report Chapter on Private Multi-Energy Grid in Belgium

Study on the integration of energy storage capabilities in a developing industrial area with an organic Rankine cycle unit.

Demonstrated embedment in 3 different controllable devices able to support flexibility of the energy demand

Different approaches for adding multiple services on a single ICT structure are compared using the inputs form the analyses on interoperability and gateway requirements. One selected approach is used to demonstrate the feasibility in 3 pieces of controllable devices able to support flexibility of the energy demand.

Case study report chapter on building integrated storage

Study of 5 buildings equipped with different energy storage equipments.

Report Chapter on Neighborhood Network

Study on the integration of 5 buildings with energy storage capacities in the neighborhood grid.

Report Chapter on Storage in a Factory

Study on the integration of energy storage with PV production capacity and high demand in a fridge room factory.

Report Chapter on Medium Scale Storage: Residential Zone in Slovenia

Study on the integration of a medium scale storage unit in a low voltage substation connecting a residential area and photovoltaic production.

Streamlined control algorithm for storage integration

Streamlined control algorithm, which could be used as an interface between the controllable resources and the network and market needs. It should be open and easily integrate different technologies and requirements. It should also be able to interact with resources of different levels of ‘smartness’.

Interoperability platform

Software platform to support and implement the interoperability as elaborated in the guidelines. It ensures that the project always has one option to apply the guidelines in practice (in the demonstrations).

Report on Large Scale Impact Simulations

With the cases and scenarios defined, the simulations can be prepared, simulated and the results evaluated. The focus is on understanding the following issues (both economic and technical) for each of the market-driven, regulated and mixed methods of implementing storage: • Impact of large scale implementation of distributed energy storage on the grid operation challenges, required grid investments and maximization of RES integration. • Possible mitigation measures for the detrimental impacts (e.g. investment needs and potential investors).

Neighbourhood simulation models for input in extrapolation (WP7)

Models for the different neighbourhood levels including the electrical loads and the direct and indirect storage capabilities for electricity as well as the dynamics of the heat storage installations and other local processes.

Report on Environmental and Social Analysis of a Large Scale Storage Implementation

Environmental and social analysis for the selected large scale storage integration scenarios.

Publikacje

STORY – Demonstrating the added value of storage in distribution systems

Autorzy: Johanna Pucker, Heribert Vallant, Stefan Marksteiner, Andreas Tuerk
Opublikowane w: 14th Symposium Energieinnovation, Numer 10-12 February 2016, 2016
Wydawca: University of Technology Graz

Life Cycle Assessment of waste wood used for energy production – Methodology and case studies

Autorzy: M. Hingsamer, J. Pucker-Singer, G. Jungmeier,J. Van Bael & J. Al Koussa, W. Van der Stricht & S. Van de Casteele,F. Norman
Opublikowane w: Recy & DepoTech 2020, Numer 18 - 20 November 2020, 2020
Wydawca: Montanuniversität Leoben

Carbon Footprint and Social Impact Assessment of Stationary Batteries in Distribution Grids

Autorzy: Johanna Pucker-Singer, Ingrid Kaltenegger, Jernej Zupančič, David Neil Bird, Andrej Gubina, Hannes Schwaiger
Opublikowane w: 16th Symposium Energieinnovation, Graz, Numer 12 -14 February 2020, 2020
Wydawca: Graz University of Technology

The role of storage systems in industrial and residential environmen

Autorzy: Andreas Tuerk, Camilla Neumann, Johanna Pucker, Jernej Zupančič, Andrej Gubina, Ariana Ramos
Opublikowane w: Sustainable Places 2020, Numer 27-30 October 2020, 2020
Wydawca: R2M Solution S.r.l.

STORY: Studying the added value storage can bring to flexible energy systems

Autorzy: Mia Ala-Juusela, Francesco Reda, Rinat Abdurafikov
Opublikowane w: 8th Nordic Passive House Conference; Adaptive and Interactive Buildings and Districts; Conference Proceedings, Numer 27-29 September 2017, 2017, Strona(/y) 228-238, ISBN 978-951-758-621-4
Wydawca: RIL and VTT

Energy services innovation at the edges of distribution grids – a business model perspective

Autorzy: Keyaerts, Nico
Opublikowane w: 15th IAEE European Conference proceedings, Numer 3-6 September 2017, 2017
Wydawca: IAEE

Analysis of Large Scale Storage Impact on Distribution Network

Autorzy: Jernej Zupancic, Edin Lakic, Tomi Medved, Andrej F. Gubina
Opublikowane w: 2018 15th International Conference on the European Energy Market (EEM), Numer 27 - 29 June 2018, 2018, Strona(/y) 1-5, ISBN 978-1-5386-1488-4
Wydawca: IEEE
DOI: 10.1109/eem.2018.8469837

A review of business models for small prosumers in a post-RES subsidy and post-priority dispatch world

Autorzy: Tomi Medved, Edin Lakic, Jernej Zupancic, Andrej F. Gubina
Opublikowane w: 2017 14th International Conference on the European Energy Market (EEM), Numer 6 - 9 June 2017, 2017, Strona(/y) 1-6, ISBN 978-1-5090-5499-2
Wydawca: IEEE
DOI: 10.1109/eem.2017.7981998

Advanced peak shaving control strategies for battery storage operation in low voltage distribution network

Autorzy: Jernej Zupancic, Edin Lakic, Tomi Medved, Andrej F. Gubina
Opublikowane w: 2017 IEEE Manchester PowerTech, Numer 18 - 22 June 2017, 2017, Strona(/y) 1-6, ISBN 978-1-5090-4237-1
Wydawca: IEEE
DOI: 10.1109/ptc.2017.7981124

Market-based business model for flexible energy aggregators in distribution networks

Autorzy: J. Zupancic, B. Prislan, E. Lakic, T. Medved, A. F. Gubina, A. Tuerk, V. Kulmer
Opublikowane w: 2017 14th International Conference on the European Energy Market (EEM), Numer 6 - 9 June 2017, 2017, Strona(/y) 1-6, ISBN 978-1-5090-5499-2
Wydawca: IEEE
DOI: 10.1109/eem.2017.7981997

Analysis by simulation of demand charge reduction supported by energy storage

Autorzy: Raquel Garde, Alicia Kalms, Sindia Casado, David Rivas, Miguel A. Sicilia, Clemente Lopez
Opublikowane w: 8th Nordic Passive House Conference 2017; Adaptive and Interactive Buildings and Districts, Numer 27-29 September 2017, 2017, ISBN 978-951-758-621-4
Wydawca: RIL and VTT

Research overview on thermal energy storage in FP7-project Merits and H2020-project Story

Autorzy: Johan Van Bael
Opublikowane w: Workshop and B2B Meeting: Thermal Energy Storage Systems for Energy Efficient Buildings (TESSe2b), Numer 22 June 2017, 2017
Wydawca: Ruhr-University Bochum (RUB) Institute of Power Systems Technology and Power Mechatronics (EneSys)

State-Of-Charge Determination In Residential Hot-Water Buffers

Autorzy: Jan Diriken, Jad Al Koussa, Ana Soares, Leen Peeters, Jef Verbeeck, Koen Vanthournout, Johan Van Bael
Opublikowane w: 14th International Energy Storage Conference – EnerStock 2018, Numer 25-28 April 2018, 2018
Wydawca: Cukurova University, Adana, Turkey

Control strategies for a residential property with solar building, thermal and electricity storages

Autorzy: Timo Korvola, Rinat Abdurafikov and Francesco Reda
Opublikowane w: 12th International Conference on Solar Energy for Buildings and Industry, Numer 10.-13. September 2018, 2018
Wydawca: PSE Conferences & Consulting GmbH

The STORY of showing added value of storage in distribution system

Autorzy: Mia Ala-Juusela, Francesco Reda, Andrej Gubina, Tomi Medved, Raquel Garde
Opublikowane w: Power-Gen Europe and REWE 2017, Numer 27 - 29 June 2017, 2017
Wydawca: Pennwell Inc.

Demonstration of flexible and robust use of large scale battery storage in low voltage distribution network with high penetration of distributed generation

Autorzy: Marjan Jerele, Anže Vilman
Opublikowane w: CIRED 2019: Conference and exhibition, Numer 3-6 June 2019, 2019
Wydawca: CIRED

Pregled poslovno-ekonomskih modelov malih proizvajalcev elektrike po izteku subvencij in prednostnega dispečiranja [Slovenian]

Autorzy: Tomi Medved, Gašper Artač, Edin Lakić, Jernej Zupančič, Andrej Gubina
Opublikowane w: 13. Conference of Slovenian Electric Power Engineers CIGRE-CIRED, Numer 22 - 24 May 2017, 2017
Wydawca: CIGRE-CIRED

Napredno vodenje sistemskih shranjevalnikov elektrike v distribucijskem omrežju[Slovenian]

Autorzy: Jernej Zupančič, Gašper Artač, Edin Lakić, Tomi Medved, Andrej Gubina
Opublikowane w: 13. Conference of Slovenian Electric Power Engineers CIGRE-CIRED, Numer 22 - 24 May 2017, 2017
Wydawca: CIGRE-CIRED

Clean Energy Storage Workshop

Autorzy: Ala-Juusela, Zupančič, Gubina, Tuerk
Opublikowane w: Proceedings, Numer 20/1, 2019, Strona(/y) 20, ISSN 2504-3900
Wydawca: MDPI
DOI: 10.3390/proceedings2019020020

Data analysis of a monitored building using machine learning and optimization of integrated photovoltaic panel, battery and electric vehicles in a Central European climatic condition

Autorzy: Hassam ur Rehman, Timo Korvola, Rinat Abdurafikov, Timo Laakko, Ala Hasan, Francesco Reda
Opublikowane w: Energy Conversion and Management, Numer 221, 2020, Strona(/y) 113206, ISSN 0196-8904
Wydawca: Pergamon Press Ltd.
DOI: 10.1016/j.enconman.2020.113206

Wyszukiwanie danych OpenAIRE...

Podczas wyszukiwania danych OpenAIRE wystąpił błąd

Brak wyników