Livrables
The first release of the document will analyze the LCA of case studies with and without the MOSES services. Comparisons will be done using multi-criteria analysis techniques if the straight comparison of indicators does not yield a clear assessment of the performance. In the second release of the document (PA) comparisons of the products life-cycle assessment will be put in evidence the expected improvement in overall sustainability and environmental impact, as well as the amount of water saving, related to the application of the MOSES platform. Delivery date: PRR (M24); FR (M36)
Requirements DocumentThe requirements document will collate requirements from the local users/stakeholders, will receipt requirements from system already available in the demo areas and will assess and receipt the laws, limitations and best practices already present in the demo areas. The document will be prepared takiing into account existing forecasting systems in the demo areas, preparing questionnaires to be disseminated to the main stakeholders, collecting policy information and existing strategies for irrigation system development, collecting expertize in other universities and research institutions involved in previous research projects, collecting “know-how”, needs and requests at the local level (farmers in the pilot area, local administration) for irrigation used for specific types of crops, collecting the field data. The document will contain also a report of regulations, constrains, data availability, data needs and specific forecasting services and data outputs delivery requirements will be prepared. Documents
Crop mapping packageIt is a set of deliverables concerning the “Crop Mapping” module of MOSES platform. It includes the implemented algorithms, the SW code and the high-level procedures for the usage of the module. It will be first released at the Alpha version of the system and it will be updated, if necessary, for Beta and Release Candidate versions. Delivery date: FARR (12); PRR (24); PA (31)
In-season water demand monitoring packageIt is a set of deliverables concerning the “In-season water demand monitoring” module of MOSES platform. It includes the implemented algorithms, the SW code and the high-level procedures for the usage of the module. It will be first released at the Alpha version of the system and it will be updated, if necessary, for Beta and Release Candidate versions. Delivery date: FARR (M12); PRR (M24); PA (M31)
Communication and Dissemination PlanDocument describing the plan of the activities that will support the communication and dissemination of the activities and results of the MOSES project, including workshop organization and event participation. Delivery date: PDR (M7); IR (M19)
Seasonal probabilistic forecasting packageIt is a set of deliverables concerning the “Seasonal probabilistic forecasting” module of MOSES platform. It includes the implemented algorithms, the SW code and the high-level procedures for the usage of the module. It will be first released at the Alpha version of the system and it will be updated, if necessary, for Beta and Release Candidate versions Delivery date: FARR (M12); PRR (M24); PA (M31)
Irrigation forecasting packageIt is a set of deliverables concerning the “Irrigation forecasting” module of MOSES platform. It includes the implemented algorithms, the SW code and the high-level procedures for the usage of the module. It will be first released at the Alpha version of the system and it will be updated, if necessary, for Beta and Release Candidate versions Delivery date: FARR (M12); PRR (M24); PA (M31)
Demo IT Pre-operation Package ReportIt is a package reporting on setup, operations and service assessment of the IT pre-operation campaign. Delivery date: IR (M19); PA (M31)
Training Activities ReportDocument reporting on training activities and containing samples of learning materials Delivery date: IR (M19)
Service Assessment ReportThe document is composed by two different parts, all of them relevant to the first application on the Italian DA: the first is an assessment of the MOSES services tested and used; the second reports the operation performed, giving also recommendations for fixing errors and/or improving the overall quality. Delivery date: IR (M19)
First Setup Report and Replication PlanningDocument reporting on: 1) the plan and the procedures used to setup MOSES services for Italian DA; 2) RO-ES-MA initial data collection; 3) planning of the Replications in the three DAs of Spain, Romania and Morocco. Delivery date: FARR (M12)
Impact analysis and Business PlanDocument containing a market and business analysis and plan of the MOSES project. Document reporting on MOSES performance and impact analysis of MOSES campaigns, through benchmarking of selected indicators Delivery date: IR (M19); FR (M36)
Service Definition DocumentThe document provides a technical and operational description of the services of the MOSES Platform. It will be first released as draft at the Alpha version of the system and it will be updated, if necessary, for Beta and Release Candidate versions. Delivery Date: PDR (T0+12); PRR (T0+24); PA (T0+31)
Demo ES Replication ReportIt is a package reporting on setup, operations and service assessment of the ES campaign
Demo RO Replication ReportIt is a package reporting on setup, operations and service assessment of the RO campaign
Management PlanThe objective of the Management Plan is to define the approach to be used by the Project team to deliver the intended project management scope of the project. It describes the execution, management and control of the project. The plan is not a fixed document, but evolves during the lifespan of the project. Important sections of the MP are the related to the management and organization of the demonstration activities, and a section related to the Scientific Plan. At PDR (M7) the Management Plan will include a Demo Plan and the Scientific Plan. The Demo Plan aims to organize the demonstration activities; in particular, it contains the plan for the first application in Italian Demonstration Area (DA) and the plan for the replications in the three DAs of Spain, Romania and Morocco. It will include DA characterization and outline DA-specific actions needed for DA setting-up and operation - each MOSES component will be considered by referring to existing local know-how and practices. A plan for MOSES system assess
Demo MA Replication ReportIt is a package reporting on setup, operations and service assessment of the MO campaign
Design Definition FileThis is a document which fully describes the design of MOSES platforms, in terms of architecture, interfaces, test procedures. It will be first released at the Alpha version of the system and it will be updated, if necessary, for Beta and Release Candidate versions. The document provides a technical and operational description of the services of the MOSES Platform. It will be first released at the Alpha version of the system and it will be updated, if necessary, for Beta and Release Candidate versions. Delivery date: PDR (M7); PRR (M24); PA (M31)
Integrated MOSES project GeoPortal website; the website will integrate the public website containing information on the project and the services of the Moses platform (in particular DSS), which will be accessible under the terms that will be defined during the project. Access to the code of the website will be open, while access to the code of the MOSES Service Platform and to the relevant integration code will be restricted to the Consortium. The first version of the project website will be available at M2, containing only general information on the project.
Communication and Dissemination Report & MaterialDocument describing the activities carried out during the project to communicate and disseminate the results of MOSES project. All the materials (booklets, leaflets, presentations, brochures, advertisement on social media, scientific publications…) which will be delivered by MOSES Consortium to communicate and disseminate the results of MOSES project. There is no specific delivery date; anyway, at least material will be delivered at IR (M19); FR (M36)
The purpose of the Data Management Plan (DMP) is to provide an analysis of the main elements of the data management policy that will be used by the applicants with regard to all the datasets that will be generated by the project. The DMP is not a fixed document, but evolves during the lifespan of the project. PDR (M7)
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible