Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

Holistic Innovative Solutions for an Efficient Recycling and Recovery of Valuable Raw Materials from Complex Construction and Demolition Waste

Objectif

EU28 currently generates 461 million tons per year of ever more complex construction and demolition waste (C&DW) with average recycling rates of around 46%. There is still a significant loss of potential valuable minerals, metals and organic materials all over Europe.
The main goal of HISER project is to develop and demonstrate novel cost-effective technological and non-technological holistic solutions for a higher recovery of raw materials from ever more complex C&DW, by considering circular economy approaches throughout the building value chain (from the End-of-Life Buildings to new Buildings). The following solutions are proposed:
- Harmonized procedures complemented with an intelligent tool and a supply chain tracking system, for highly-efficient sorting at source in demolition and refurbishment works.
- Advanced sorting and recycling technologies for the production and automated quality assessment of high-purity raw materials from complex C&DW.
- Development of optimized building products (low embodied energy cements, green concretes, bricks, plasterboards and gypsum plasters, extruded composites) through the partial replacement of virgin raw materials by higher amounts of secondary high-purity raw materials recovered from complex C&DW.
These solutions will be demonstrated in demolition projects and 5 case studies across Europe. Moreover, the economic and environmental impact of the HISER solutions will be quantified, from a life cycle perspective (LCA/LCC), and policy and standards recommendations encouraging the implementation of the best solutions will be drafted.
HISER will contribute to higher levels of recovered materials from C&DW from 212 Mt in 2014, to 359 Mt in 2020 and 491 Mt by ca. 2030, on the basis of the increase in the recovery of aggregates, from 40% (169 Mt) to more than 80% (394 t) and wood, from 31% (2.4 Mt) to 55% (5 Mt);. Similarly, unlocking valuable raw materials currently not exploited is foreseen, namely some metals and emerging flows.

Appel à propositions

H2020-WASTE-2014-2015

Voir d’autres projets de cet appel

Sous appel

H2020-WASTE-2014-one-stage

Coordinateur

FUNDACION TECNALIA RESEARCH & INNOVATION
Contribution nette de l'UE
€ 851 000,00
Adresse
PARQUE CIENTIFICO Y TECNOLOGICO DE GIPUZKOA, PASEO MIKELETEGI 2
20009 DONOSTIA-SAN SEBASTIAN (GIPUZKOA)
Espagne

Voir sur la carte

Région
Noreste País Vasco Gipuzkoa
Type d’activité
Research Organisations
Liens
Coût total
€ 851 000,00

Participants (27)