Skip to main content
European Commission logo
Deutsch Deutsch
CORDIS - Forschungsergebnisse der EU
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

Super high efficiency Cu(In,Ga)Se2 thin-film solar cells approaching 25%

Ziel

Prime objective of the Sharc25 project is to develop super-high efficiency Cu(In,Ga)Se2 (CIGS) solar cells for next generation of cost-beneficial solar module technology with the world leading expertise establishing the new benchmarks of global excellence.
The project partners ZSW and EMPA hold the current CIGS solar cell efficiency world records of 21.7% on glass and 20.4% on polymer film, achieved by using high (~650°C) and low (~450°C) temperature CIGS deposition, respectively. Both have developed new processing concepts which open new prospects for further breakthroughs leading to paradigm shift for increased performance of solar cells approaching to the practically achievable theoretical limits. In this way the costs for industrial solar module production < 0.35€/Wp and installed systems < 0.60€/Wp can be achieved, along with a reduced Capex < 0.75€/Wp for factories of >100 MW production capacity, with further scopes for cost reductions through production ramp-up.
In this project the performance of single junction CIGS solar cells will be pushed from ~21% towards 25% by a consortium with multidisciplinary expertise. The key limiting factors in state-of-the-art CIGS solar cells are the non-radiative recombination and light absorption losses. Novel concepts will overcome major recombination losses: combinations of increased carrier life time in CIGS with emitter point contacts, engineered grain boundaries for active carrier collection, shift of absorber energy bandgap, and bandgap grading for increased tolerance of potential fluctuations. Innovative approaches will be applied for light management to increase the optical path length in the CIGS absorber and combine novel emitter, front contact, and anti-reflection concepts for higher photon injection into the absorber. Concepts of enhanced cell efficiency will be applied for achieving sub-module efficiencies of >20% and industrial implementation strategies will be proposed for the benefit of European industries.

Aufforderung zur Vorschlagseinreichung

H2020-LCE-2014-2015

Andere Projekte für diesen Aufruf anzeigen

Unterauftrag

H2020-LCE-2014-1

Koordinator

ZENTRUM FUR SONNENENERGIE- UND WASSERSTOFF-FORSCHUNG BADEN-WURTTEMBERG
Netto-EU-Beitrag
€ 1 428 010,00
Adresse
MEITNERSTRASSE 1
70563 Stuttgart
Deutschland

Auf der Karte ansehen

Region
Baden-Württemberg Stuttgart Stuttgart, Stadtkreis
Aktivitätstyp
Research Organisations
Links
Gesamtkosten
€ 1 428 010,00

Beteiligte (11)