Resultado final
According to the Initial Communication plan, the objective of this Deliverable is describing whole communication activities developed during the fourth year.
Second year´s performed communication activitiesAccording to the Initial Communication plan the objective of this Deliverable is describing whole communication activities developed during the second year
BRESAER system conceptual design and methodology for a systemic building refurbishmentThis deliverable is the result of the activities carried out in Task 22 It will define the conceptual design of the system the methodology to achieve a systemic building refurbishment overview the representative base cases to apply the system and the conceptual energy stratategies for its implementation
Future standardization proposalsThis deliverable is the result of the activities of Task 7.1.Standarization, with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution. The deliverable will summarize the outcomes of the project into future new or revised standards so they can be easily found and used by the European or international industry sector and will present a list of specific standardization proposals. These proposals will fit the standardization procedures and requirements to be ready for inclusion in the development of future new standards or into revised ones.
Third year´s performed Communication activitiesAccording to the Initial Communication plan the objective of this Deliverable is describing whole communication activities developed during the third year
Guides for installation, commissioning and maintenance of BRESAER systemThis deliverable is the final result of the activities carried out in Task 4.1. It is the guides for installation, commissioning and maintenance of BRESAER system.
Logistics efficiency and initial installation analysis of BRESAER systemThis deliverable is the first result of the activities carried out in Task 41 It is the validation of the BRESAER system in terms of production transport workshop assembling onsite installation and maintenance
Business models definitionThis deliverable will present different proposals of suitable business models that could support the commercialization of BREASAER project result. The deliverable will include also a summary of the result of the validation activities proposed in Task 7.5. The selected business models will be subject a “light” business plan (D7.17) that will also be a central part of the Exploitation Plan.
Current status of the real demonstrator with monitored resultsThis deliverable will collect the preliminary status of the demonstration building prior to intervention including monitoring results of a full one year.
Performance assessment in real buildings with simulated interventionsThis deliverable is the result of the activities carried out in Task 6.8. BRESAER system will be evaluated by the implementation of the envelope system at model level in four virtual demo buildings.
First year´s performed communication activitiesAccording to the Initial Communication plan the objective of this Deliverable is describing whole communication activities developed during the first year
Report on existing standards and standardization landscapeThis deliverable is the result of the activities of Task 71Standarization with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution The deliverable will present an identification of related applicable standards by identifying the existing standards and the ongoing developments at European and international levels applicable to BRESAER solution It is proposed at the very beginning of the project as it will constitute an important output that could influence the technical definition of the BRESAER system and its components
Final year´s performed communication activitiesAccording to the Initial Communication plan, the objective of this Deliverable is describing whole communication activities developed during the last year and the conclusions of all project.
BRESAER system tested and validatedThis deliverable is the result of the activities carried out in Task 37 It is the validation of the BRESAER system under CPDs standards
Performance assessment of the real demonstrationThis deliverable is the result of the activities carried out in Tasks 6.2 and 6.7. It will collect the evaluation of the real demonstrator through measurements and energy modelling, inluding analysis of possible causes for any divergence between measured and calculated results.
BRESAER system costs and payback calculationsThis deliverable is the final result of the activities carried out in Task 2.4. It will define an update and refinement of the initial calculations once the envelope components are optimized and enhanced.
Preliminary constructive designThis deliverable is one of the result of the activities carried out in Task 31 32 33 34 and 35 It will define the preliminary constructive design for each envelope component structural elements of faade and roof lightweight industrialized ventilated faade module multifunctional insulation panels combined solar thermal air and PV envelope component and dynamic window
Building Energy Management System (BEMS) definitionThis deliverable will collect all the developments carried out in Task 51 It will be defined all the requirements of the BEMS the ICT solutions for system controlling the data model and the external systems integration
Final report on the interaction with standardization systemThis deliverable is the final result of the activities of Task 7.1.Standarization, with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution. The deliverable will resume the activities and feedback collected from the interaction with the standardization technical committees (TCs) related with the project in order to improve the development and the exploitation strategy of the project, checking the feasibility and guide the characteristics of a future standardization of the project results.
First report on the interaction with the standardization systemThis deliverable is related to the activities of Task 71Standarization with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution The deliverable will resume the activities and feedback collected during the first 36 months of the project from the interaction with the standardization technical committees TCs related with the project in order to improve the development and the exploitation strategy of the project checking the feasibility and guide the characteristics of a future standardization of the project results
Initial costs and payback calculations for the demonstration locationsThis deliverable is the result of the initial activities carried out in Task 24 It will define the initial estimation of the economic impacts of the system when used in a retrofitting project
The objective of the 2nd version is to update the initial Data Management Plan in order to finetune it to the data generated and the uses identified by the consortium since not all data or potential uses are clear from the start
Final version of the Data Management PlanThis deliverable provides the final version of the Data Management Plan, implemented by the consortium.
This deliverable is the result of the activities carried out in Task 25 It is the development of Geocluster maps to indicate the BRESAER technology impacts potential and its applicability
Design guide and computer tool refinedThis deliverable will be the second version of the D2.3 after a refinament process of the computer tool once used during the design phase of the demonstration stage to develop in WP6.
Publicaciones
Autores:
Imanol A. Peña, Ane Miren A. Aranzasti, Andrew Ferdinando, Isabel L. Azpeitia, Alejandro M. Barreiro
Publicado en:
EESAP 8 Final Proceedings, 2017
Editor:
Universidad del País Vasco
Autores:
Isaac Guedi Capeluto, Carlos Ochoa
Publicado en:
PLEA 2017 Final Proceedings, 2017, ISBN 978-0-9928957-5-4
Editor:
NCEUB 2017
Autores:
Beñat A. Goikolea, Roberto G. Martinez, Alberto R. Lacasta, Daniel C. Villegas
Publicado en:
Comunicación presentada al III Congreso Edificios Energía Casi Nula, Edición August 2016, 2016
Editor:
Congreso EECN
Autores:
Roberto Garay
Publicado en:
Proceedings of the conference: 7º Congreso Europeo sobre Eficiencia Energética y Sostenibilidad en Arquitectura y Urbanismo; Universidad del País Vasco., Edición 4-6 July 2016, 2016
Editor:
Donostia-San Sebastian,
Autores:
Víctor I. Serna, José L. Hernández, Álvaro Corredera, Roberto Sanz, Francisco J. Miguel, Jesús García
Publicado en:
Proceedings of the Conference: II Congreso Edificios Inteligentes, Edición October 2015, 2015, Página(s) 106-112, ISBN 978-84-608-2793-1
Editor:
Grupo Tecma Red S.L.
Autores:
Beñat Arregi and Roberto Garay, Alberto Riverola and Daniel Chemisana
Publicado en:
III Congreso Edificios Energía Casi Nula, Edición 21-22 June 2016, 2016, Página(s) 114-119, ISBN 978-84-608-8686-0
Editor:
Madrid
Autores:
Garay, Roberto
Publicado en:
Journal of Facade Design and Engineering, Vol 6, Iss 2, Pp 095-106 (2018), Edición 1, 2018
Editor:
TU Delft Open Journals
DOI:
10.7480/jfde.2018.2.2206
Autores:
José Hernández, Roberto Sanz, Álvaro Corredera, Ricardo Palomar, Isabel Lacave
Publicado en:
Buildings, Edición 8/2, 2018, Página(s) 14, ISSN 2075-5309
Editor:
MDPI AG
DOI:
10.3390/buildings8020014
Autores:
Roberto G. Martinez, Daniel C. Villegas
Publicado en:
Edición November 2017, 2017
Editor:
Universitat de Lleida
Autores:
José L. Hernández
Publicado en:
CARTIF newsview, Edición "#15, November/December 2015", 2015, Página(s) 10-13
Editor:
CARTIF Research Centre
Autores:
José L. Hernández, Álvaro Corredera
Publicado en:
FuturEnergy, Edición "#31, June 2016", 2016, Página(s) 39-41, ISSN 2340-261X
Editor:
Saguenay S.L.
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles