Risultati finali

Trip Tracker Specifications document

This document shall define the platform independent prescription of all functional and system requirements on the implementation of all software components comprised in the WP4, including their modular architecture, internal and external interfaces, and the detailed interactions and activity flows defined within and across WPs, and with the transportation ecosystem where applicable. This document will contribute to the Conceptual Requirement Specification and the Conceptual Interface Specification created by WP7.

Dissemination, Exploitation activities and impact on standardisation and regulation

Report summarising the results/impacts of all the dissemination, communication and exploitation activities.

Travel Companion Additional Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the additional features implemented in this second iteration of software components development for WP5 Travel Companion POC.

Project Initiation Review Pack

• Technical Management Principles (TMP) This deliverable will introduce the overall technical management rules and organisation shared by all partners, with the aim to offer robust, yet tailored, means of monitoring and control of the WPs progress to the Technical Management Committee. This deliverable will gathers sections for each work package describing their own internal management organisation, reporting mechanisms and plan. • Engineering Methodology & Guidelines (EMG) The guidelines will address the technical Project management and the WPs internal management to guarantee the Project consistency, by defining methods, guidelines and mandated procedures to follow throughout the WPs own lifecycles. • Technical Quality Plan (TQP) This document Plan shall define Quality assurance procedures definition, through the description of the detail expectations on each deliverable of the Project, the approval rules guidelines, and the standards. • Technical Master Schedule (TMS) This document will cons

Project Initiation Review Pack - iteration 2

Final version

Development Readiness Review Pack (FREL)

Final version

Trip Tracker Core Integration Report

This report will be consolidated following integration tests at the WP4 level of the software components released at the first iteration as the Trip Tracker’s Core Feature POC for deployment on WP7 verification platform and Pilot Testing in WP7. The report will include the software configuration, the functions implemented for the version and a list of test procedures with the associated results. The aim of the report is to present an exhaustive status of the implementation works of the WP4 along with its convergence to the IT²RAIL Pilot objectives.

Business Analytics Additional Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the additional features implemented in this second iteration of software components development for WP6 Business Analytic POC.

Trip Tracker Additional Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the additional features implemented in this second iteration of software components development for WP4 Trip Tracker POC.

Trip Tracker Final Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the final features implemented in this final iteration of software components development for WP4 Trip Tracker POC.

Travel shopping Final Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the final features implemented in this final iteration of software components development for WP2 Travel Shopping POC.

Business Analytics Specifications documents

This document shall define the platform independent prescription of all functional and system requirements on the implementation of all software components comprised in the WP6, including their modular architecture, internal and external interfaces, and the detailed interactions and activity flows defined within and across WPs, and with the transportation ecosystem where applicable. This document will contribute to the Conceptual Requirement Specification and the Conceptual Interface Specification created by WP7.

Conclusions and Recommendations of the Experts’ Groups

Report presenting the minutes of the meetings, together with any specialised report/opinion prepared by the external experts.

Set up a dissemination plan for IT²RAIL

Report defining the IT²RAIL dissemination, communication and exploitation strategies.

Travel shopping Core Integration Report

This report will be consolidated following integration tests at the WP2 level of the software components released at the first iteration as the Travel Shopping’s Core Feature POC for deployment on WP7 verification platform and Pilot Testing in WP7. The report will include the software configuration, the functions implemented for the version and a list of test procedures with the associated results. The aim of the report is to present an exhaustive status of the implementation works of the WP2 along with its convergence to the IT²RAIL Pilot objectives.

Business Analytics Ontology document (FREL)

Final version

Booking & Ticketing Additional Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the additional features implemented in this second iteration of software components development for WP3 Booking & Ticketing POC.

Travel Shopping Specifications document

This document shall define the platform independent prescription of all functional and system requirements on the implementation of all software components comprised in the WP2, including their modular architecture, internal and external interfaces, and the detailed interactions and activity flows defined within and across WPs, and with the transportation ecosystem where applicable. This document will contribute to the Conceptual Requirement Specification and the Conceptual Interface Specification created by WP7.

Travel Companion Specifications document

This document shall define the platform independent prescription of all functional and system requirements on the implementation of all software components comprised in the WP5, including their modular architecture, internal and external interfaces, and the detailed interactions and activity flows defined within and across WPs, and with the transportation ecosystem where applicable. This document will contribute to the Conceptual Requirement Specification and the Conceptual Interface Specification created by WP7.

Business Analytics Core Integration Report

This report will be consolidated following integration tests at the WP6 level of the software components released at the first iteration as the Business Analytics’ Core Feature POC for deployment on WP7 verification platform and Pilot Testing in WP7. The report will include the software configuration, the functions implemented for the version and a list of test procedures with the associated results. The aim of the report is to present an exhaustive status of the implementation works of the WP6 along with its convergence to the IT²RAIL Pilot objectives.

Booking & Ticketing Core Integration Report

This report will be consolidated following integration tests at the WP3 level of the software components released at the first iteration as the Booking and Ticketing’s Core Feature POC for deployment on WP7 verification platform and Pilot Testing in WP7. The report will include the software configuration, the functions implemented for the version and a list of test procedures with the associated results. The aim of the report is to present an exhaustive status of the implementation works of the WP3 along with its convergence to the IT²RAIL Pilot objectives.

Travel Companion Core Integration Report

This report will be consolidated following integration tests at the WP5 level of the software components released at the first iteration as the Travel Companion’s Core Feature POC for deployment on WP7 verification platform and Pilot Testing in WP7. The report will include the software configuration, the functions implemented for the version and a list of test procedures with the associated results. The aim of the report is to present an exhaustive status of the implementation works of the WP5 along with its convergence to the IT²RAIL pilot objectives.

Travel Companion Final Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the final features implemented in this final iteration of software components development for WP5 Travel Companion Analytic POC.

Studies Pack

• White Paper for adaptation and openness of business ecosystem • White Paper on Security and Privacy aspects of SHIFT²RAIL IP4 • White Paper report for SHIFT²RAIL IP4 Concepts end-user applicability

Travel Companion Ontology document (FREL)

Final version

Booking & Ticketing Specifications document

This document shall define the platform independent prescription of all functional and system requirements on the implementation of all software components comprised in the WP3, including their modular architecture, internal and external interfaces, and the detailed interactions and activity flows defined within and across WPs, and with the transportation ecosystem where applicable. This document will contribute to the Conceptual Requirement Specification and the Conceptual Interface Specification created by WP7.

Booking & Ticketing Final Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the final features implemented in this final iteration of software components development for WP3 Booking & Ticketing POC.

Travel shopping Additional Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the additional features implemented in this second iteration of software components development for WP2 Travel Shopping POC.

Business Analytics Final Integration Report

This report will follow the same principles and format than the Core integration Report but will be dedicated to the final features implemented in this final iteration of software components development for WP6 Business Analytic POC.

Trip Tracker Ontology document (FREL)

Final version

Document Management Plan

Report defining the Data Management Plan.

Booking & Ticketing Ontology document (FREL)

Final version

Travel Shopping Ontology document (FREL)

Final version

Proof-of-Concept Packaged Resolvers Core Features

Release for CREL milestone of the specifications document and a Proof-of-Concept implementation of core features of Location, Travel Expert and Event resolvers, delivered as a set of pre-defined semantic discovery, query and aggregation templates used by functional applications to obtain specific resources from the web of transportation data by using Interoperability Framework semantic web technology components.

Proof-of-Concept Packaged Resolvers Full Features

Release for FREL milestone of the specifications document and a Proof-of-Concept implementation of the full features of Location, Travel Expert and Event resolvers, delivered as a set of pre-defined semantic discovery, query and aggregation templates used by functional applications to obtain specific resources from the web of transportation data by using Interoperability Framework semantic web technology components.

Proof-of-Concept Packaged Resolvers Additional Features

Release for AREL milestone of the specifications document and a Proof-of-Concept implementation of additional features of Location, Travel Expert and Event resolvers, delivered as a set of pre-defined semantic discovery, query and aggregation templates used by functional applications to obtain specific resources from the web of transportation data by using Interoperability Framework semantic web technology components.

IT²RAIL Domain Ontology Specification and Repository

The deliverable consists of: • Module D1.1.1: specification document of the harmonised, integrated IT²RAIL domain ontology; • Module D1.1.2: platform independent specification document of IT²RAIL domain ontology repository; • Module D1.1.3: a software implementation of the ontology repository specification that provides the WP1 Proof-of-Concept packaged resolvers and other IT²RAIL work package functional applications with a shared, machine-readable, formal description of the knowledge documented in the IT²RAIL domain ontology specification, used to automate the interpretation of data exchanges between functional applications irrespective of syntactic formats or protocols.

Interoperability Framework integrated development environment (FREL)

Final version

Semantic Query and Aggregation Engine

The deliverable consists of: • Module D3.4.1: the platform independent specification document of the Semantic Query and Aggregation Engine; • Module D3.4.2: a software implementation of the Semantic Query and Aggregation Engine specification that implements distributed query capabilities on the web of transportation data.

Semantic Discovery Engine

The deliverable consists of: • Module D3.1.1: the platform independent specification document of the Semantic Discovery Engine; • Module D3.1.2: a software implementation of the Semantic Discovery Engine specification that provides WP1 Proof-of-Concept packaged resolvers and other IT²RAIL functional applications with resource discovery and run-time binding irrespective of syntactic formats or protocols.

Semantic Web Services Registry

The deliverable consists of: • Module D2.1.2: the platform independent specification document of the Semantic Web Services Repository; • Module D2.1.1: a software implementation of the semantic web services repository specification that provides semantically annotated web service descriptors of functionality requested at run-time by WP1 Proof-of-Concept packaged resolvers and by other IT²RAIL functional applications.

Set up public website

Report defining the setting up the Project public website and its functionalities.

Pubblicazioni

Interoperability and Governance of IT Solutions for Attractive Railway and Multimodal Transport Services: the point of view of EU Research

Autori: A. CARENINI, I. CELINO , M. COMERIO , M.M. POURHASHEM KALLEHBASTI, M. ROSSI, L. TANCA
Pubblicato in: Proceedings of UITP Global Public Transport Summit, 2017
Editore: uitpsummit.org

Context-Aware Access to Heterogeneous Resources Through On-the-Fly Mashups

Autori: Florian Daniel, Maristella Matera, Elisa Quintarelli, Letizia Tanca, Vittorio Zaccaria
Pubblicato in: Advanced Information Systems Engineering - 30th International Conference, CAiSE 2018, Tallinn, Estonia, June 11-15, 2018, Proceedings, Numero yearly, 2018, Pagina/e 119-134, ISBN 978-3-319-91562-3
Editore: Springer International Publishing
DOI: 10.1007/978-3-319-91563-0_8

Transforming Real-Time Passenger Information and ticketing

Autori: Stefanos Gogos
Pubblicato in: European Railway Review, RTPI & TICKETING SUPPLEMENT, Numero Volume 22 , Numero 3, 2016, 2016, Pagina/e 61-62, ISSN 1351-1599
Editore: Russell Publishing Ltd

IT2Rail: information technologies for shift to rail

Autori: Stefanos Gogos, Xavier Letellier
Pubblicato in: Transportation Research Procedia, Numero Volume 14, 2016, Pagina/e 3218–3227, ISSN 2352-1465
Editore: Elsevier
DOI: 10.1016/j.trpro.2016.05.265

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile