Electrification of public transport in cities

Risultati finali

London Use Cases set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Leipzig Final Use Cases Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

Barcelona Final Use Cases Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

Leipzig Use Cases set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Take-up guidelines for ELIPTIC use cases (incl. business model part)

Take-up guidelines for ELIPTIC use cases (incl. business model part) [Month 34]

London Final Use Cases Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

Final Business Cases (for each use case) for further take-up / implementation

Final Business Cases (for each use case) for further take-up/implementation [Month 34 -after workshop 3]

Process Evaluation Plan

describes the methodology to collect any useful data/information to evaluate the process, including specific datasheets for the data process for each EUC. [Month 6]

Warsaw Use Case set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Oberhausen Use Cases set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Joint policy recommendations

Joint policy recommendations as a key deliverable of the ELIPTIC project – with summarizing statements in all 8 ELIPTIC languages [Month 35]

ELIPTIC Dissemination Report v2

Based on the structure of Eliptic Common Brochure, this document will report on the dissemination activities performed by the ELIPTIC project during the entire project, summarizing the content of Eliptic Common Brochure and adding content relative to the second half of the project [Month 36]

ELIPTIC Dissemination Report v1

This document will report on the dissemination activities performed by the ELIPTIC project during the first half of the project. It will include recommendations for improving the project dissemination [Month 18]

Brussels Final Uses Case Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

Brussels Use Cases set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Gdynia Final Use Cases Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

Evaluation findings and transferability potential at European level

synthesizes the key findings from all the ELIPTIC case studies and provides references for transferability of EUCs at European level. [Month 34]

11 ELIPTIC use case leaflets 1 - 11

Every site produces a leaflet – describing the use case(s) in the national languages(s) – for local and national dissemination. An English version will be as well provided. [Month 15]

FAS Lanciano Use Case Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

Report on ELIPTIC twin call’s funded activities and outcomes

Report on ELIPTIC call’s funded activities and outcomes (incl. 6-8 implementation scenarios and 6-8 take-up plans) [Month 34]

Bremen Use Cases set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Oberhausen Final Use Cases Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

Detailed use case scenario descriptions

Detailed use case scenario descriptions (23 use case scenarios) [Month 10]

FAS Lanciano Use Case set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Conventional Full Evaluation, the test results

describes the results from the “before-during” comparison of the ELIPTIC demonstrators both at local and cross-site, including those from the CBA. [Month 34]

ELIPTIC User Forum Methodology and Report

This document aims at defining and describing the set of practices, rules, procedures and working methods for the set-up, organisation and activities of the ELIPTIC User Forum. It will also report on the creation and activities of the ELIPTIC User Forum composed of public transport operators and public transport authorities [Month 36]

Barcelona Use Cases set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Warsaw Final Use Case Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

Szeged Use Cases set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Szeged Final Use Cases Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

Gdynia Use Cases set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

Conventional Full Evaluation, the reference scenarios

describes the assessed baseline situation of the ELIPTIC demonstrators, including a cross case comparison. [Month 18]

Eberswalde Final Use Case Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

ELIPTIC Networking Report

This deliverable will describe the networking activities performed by the ELIPTIC project. [Month 34]

Bremen Final Uses Case Report

The second deliverable will add for each site specifically the use case(s) evaluation section incl. the data collection plan, the evaluation methodologies used, and results of the use case(s)/data collection as well as lessons learnt . [Month 32]

ELIPTIC common use case brochure

The single brochure gathers the key information of the individual leaflets (D6.3) of every use case site of WP2. Task 6.2 and will be summarised in 8 different languages to strengthen the dissemination on the national level [Month 18]

Final Development Schemes

Final Development Schemes (for each use case) - [Month 34 -after workshop 3]

Impacts Evaluation Plan

describes the methodology to evaluate impacts, including practical guidelines for the data process. [Month 6]

ELIPTIC Dissemination Strategy

This document will describe the strategy for the dissemination of the ELIPTIC activities and results. It will identify the key interests of the different stakeholders’ categories, define audience categories and associate them with the most suitable dissemination tools to be used to produce the highest awareness of the project [Month 4]

Technological Viability Evaluation

describes the results of the SWOT analysis performed to assess the ELIPTIC feasibility studies. [Month 34]

Eberswalde Use Case set-up report

This report will include for each site separately information about the use case(s) background/set-up (objectives, operational environment, use case operational/work plan, details about the selection and installation of the charging infrastructure and the electrified vehicle) and the planned use case(s) execution (e.g. route used, vehicle used, charging infrastructure used, work plan, detailed schedules – or study details etc.,). [Month 6]

ELIPTIC Thematic Workshop 1 (according thematic pillars)

will involve operators, authorities and suppliers (task 6.3) [Month 10, 18, 24]

webinar 1 platform and at least 1 ELIPTIC web-based training

ELIPTIC web-based training and webinar platform (incl. web-based option generator) [Month 10, 18, 28]

6 stakeholder dialogue workshops (task 5.1)

6 stakeholder dialogue workshops (task 5.1) [Month 12-33]

ELIPTIC Thematic Workshop 2 (according thematic pillars)

will involve operators, authorities and suppliers (task 6.3) [Month 10, 18, 24]

webinar 2 platform and at least 1 ELIPTIC web-based training

ELIPTIC web-based training and webinar platform (incl. web-based option generator) [Month 10, 18, 28]

ELIPTIC website www.eliptic-project.eu

The website www.eliptic-project.eu is reserved and already active. The webportal will serve as a main communication tool with regular updates, links and a download section of all relevant project documents... [Month 3, continuously updated]

ELIPTIC Thematic Workshop 3 (according thematic pillars)

will involve operators, authorities and suppliers (task 6.3) [Month 10, 18, 24]

webinar 3 platform and at least 1 ELIPTIC web-based training

ELIPTIC web-based training and webinar platform (incl. web-based option generator) [Month 10, 18, 28]

Pubblicazioni

Electrification of public transport: lessons from the ELIPTIC project

Autori: Bousse, Y., Corazza, M.V., Kowalski, J., Sessing, G., Salzillo Arriaga D, De Belen M
Pubblicato in: Proceedings of 4th Conference on Sustainable Urban Mobility CSUM 2018, 2018, Pagina/e 226-233
Editore: Springer

Electrification of Public Transport in Europe: Vision and Practice from the ELIPTIC project

Autori: Bousse, Y., Corazza, M.V., Sessing, G., Salzillo Arriaga D.
Pubblicato in: Proceedings of the 2018 IEEE International Conference on Environment and Electrical Engineering (EEIC), 2018, Pagina/e 296-301
Editore: IEEE International Conference on Environment and Electrical Engineering

Visioning and Practicing Electrification of Public Transport in Europe: Methodology and Results from the ELIPTIC Experience

Autori: Bousse Y., Corazza, M.V., Kowalski, J., Sessing G.
Pubblicato in: Proceedings of 7th Transport Research Arena TRA 2018, Numero 01/04/2018, 2018
Editore: Transport Research Arena

Battery Electric Buses in European Cities: Economic Comparison of Different Technological Concepts Based on Actual Demonstrations

Autori: Fabian Meishner, Bonjad Satvat, Dirk Uwe Sauer
Pubblicato in: 2017 IEEE Vehicle Power and Propulsion Conference (VPPC), 2017, Pagina/e 1-6, ISBN 978-1-5386-1317-7
Editore: IEEE
DOI: 10.1109/VPPC.2017.8331012

UPROSZCZONA METODA OCENY POTENCJAŁU REKUPERACJI ENERGIIW TRAKCJI MIEJSKIEJ

Autori: Mikołaj Bartłomiejczyk
Pubblicato in: Zeszyty Naukowe Wydziału Elektrotechniki i Automatyki Politechniki Gdańskiej, Numero No. 47, 2015, 2015, Pagina/e 23-36, ISSN 2353-1290
Editore: Wydział Elektrotechniki i Automatyki Politechniki Gdańskiej

Possibilities of Electric Powered Public Transport in Tourism of Szeged

Autori: Gal, J. – Toth, I. T.
Pubblicato in: Quaestus, Numero No. 8/ April 2016, Anul V, 2016, Pagina/e 22-30, ISSN 2343-8134
Editore: Faculty of Management in Tourism and Commerce Timişoara

SURVEY OF PASSENGERS’ BEHAVIOR TRAVELLING BY PUBLIC TRANSPORT IN SZEGED

Autori: József GÁL, István Tibor TÓTH
Pubblicato in: Acta Technica Corviniensis, Numero Tome IX [2016], Fascicule 3[July–September], 2016, Pagina/e Pages not numbered in the document, ISSN 2067-3809
Editore: University POLITEHNICA Timisoara, Faculty of Engineering Hunedoara

Praktyczna aplikacja In Motion Charging w Gdyni: trolejbusy w obsłudze linii autobusowych

Autori: Bartłomiejczyk M.
Pubblicato in: Autobusy. Technika, Eksploatacja, Systemy Transportowe, Numero 9, 2016, Pagina/e 18-24, ISSN 1509-5878
Editore: Instytutu Naukowo-Wydawniczego „SPATIUM” sp. z o.o.

Multiaspect measurement analysis of breaking energy recovery

Autori: Bartłomiejczyk M., Połom M.
Pubblicato in: ENERGY CONVERSION AND MANAGEMENT, Numero 127, 2016, Pagina/e 35-42, ISSN 0196-8904
Editore: Pergamon Press Ltd.

Introducing high capacity e-buses in cities: the ZeEUS and ELIPTIC projects

Autori: Yannick Bousse, Pauline Bruge, Umberto Guida
Pubblicato in: Eurotransport Magazine, Numero 4, 2016, Pagina/e 22-25, ISSN 1478-8217
Editore: Russell Publishing Ltd