Resultado final
Coordination and meetings report updated each year M12 M24 M36
User requirements for tracking services aiming at behaviour changeEvaluation plan, describing the evaluation framework and the data collection requirements
Evaluation plan describing the evaluation framework and the data collection requirements
Assessment of the potential and conditions for use in behaviour change initiativesReport on activities and results in pilots
Report on activities and results at each pilotA report for each pilotsite will be made each local pilot implementer M31
Guidelines for campaign design using tracking servicesInformation and guidelines on using tracking data for planning
Evaluation report
TRACE Toolkit
Bi-annual newsletters 1 and 2
D8.2 Bi-annual newsletters
Preliminary Prototypes of integrated solutionsProject repository report
Project repository reports updated each year M12 M24 M36
Project quality planProject quality plan PQP
Dissemination StrategyICT Architecture Specification Draft
Specifications for the development of tracking tools
Updated information and guidelines package
Stakeholder assessment toolkit
Mobiel 21 will develop a stakeholder assessment toolkit which contains all necessary tools and guidance for partners so that they can fully contribute to the work package
Data Management PlanData Management Plan updated each year M12 M24 M36
Pilot implementation strategy in pilotsPilot implementation strategy reportsA report for each pilotsite will be made each local pilot implementer M18
Bi-annual newsletters 5 and 6D82Biannual newsletters
Bi-annual newsletters 3 and 4D82Biannual newsletters
Publicaciones
Autores:
Rodrigo Bruno, Nuno Santos, Paulo Ferreira
Publicado en:
Proceedings of the 12th EAI International Conference on Mobile and Ubiquitous Systems: Computing, Networking and Services, 2015, ISBN 978-1-63190-072-3
Editor:
ACM
DOI:
10.4108/eai.22-7-2015.2260069
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles