Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary
Contenu archivé le 2024-05-28

The Endless Runway

Objectif

"The airport’s capacity is determined by the capacity of its runway system. The real capacity is usually lower than the declared capacity because of weather restrictions (cross- and tailwind and visibility) and because of dependencies between runways.

Aircraft need to take off and land within defined cross- and tailwind limits. The direction of the runway determines the cross- and tailwind components. With changing wind (direction and speed), other runways in other directions need to be used.

This proposal investigates the use of a circular runway. Starting anywhere in the circle, aircraft can take off from the point where the crosswind is at minimum (or zero). Just as well, they can land at the point where they fly exactly headwind and continue their landing roll in the circle, exiting anywhere where they are closest to their gate. This will create a runway that can be used under any conditions without loss of capacity."

Appel à propositions

FP7-AAT-2012-RTD-L0
Voir d’autres projets de cet appel

Coordinateur

STICHTING KONINKLIJK NEDERLANDS LUCHT - EN RUIMTEVAARTCENTRUM
Contribution de l’UE
€ 182 249,00
Adresse
ANTHONY FOKKERWEG 2
1059 CM Amsterdam
Pays-Bas

Voir sur la carte

Région
West-Nederland Noord-Holland Groot-Amsterdam
Type d’activité
Research Organisations
Contact administratif
Henk Hesselink (Mr.)
Liens
Coût total
Aucune donnée

Participants (4)