The primary objective of the RISPECT project is to use ship structural inspection results (coating condition, corrosion, cracks and deformation) along with the calculated expected results to guide future inspections required to achieve a minimum structural reliability.
This “probabilistic inspection planning” is not new but this project takes the method a stage further to use data from large numbers of ships in a “central statistical database” to contribute to the decision making process for any one ship. This has the effect of combining the traditional Classification Society broad view with the usual probabilistic method that is based on data from one ship only.
Secondary objectives of the project are to:
1) improve communications between ship owners, managers, inspectors and class,
2) use the results as input to new design.
Dziedzina nauki
Not validated
Not validated
Słowa kluczowe
Temat(-y)
Zaproszenie do składania wniosków
FP7-SST-2007-RTD-1
Zobacz inne projekty w ramach tego zaproszenia
System finansowania
CP-FP - Small or medium-scale focused research projectKoordynator
G1 1XQ Glasgow
Zjednoczone Królestwo