Resultado final
A review of use cases for energy storage integration that outlines integration requirements, financial incentives and use case specific constraints that will be used to inform the integration approach developed in WP 3. This deliverable is related to work that is conducted in: T2.1, 2.2, 2.3
First year risk management planOutline of critical risks, monitoring actions and mitigation actions, including responsibility for actioning each. This will be the basis from which the final risk management plan will start. This deliverable is related to work that is conducted in: T1.1
First DEC PlanCommunication and Dissemination Master Plan to maximise the impact of the project results for its entire duration and after completion. Includes guidelines related to dissemination aactivites (website, articles, etc.), events and techncial publications. This deliverable is related to work that is conducted in: T7.1
Use case identification and test infrastructure set-upThis report outlines how the use cases and topologies previously identified in WP 2 and WP3 can be translated into the test faciltiy where battery and ECRs can be evaluated. The report also provides a summary of the plan for testing and implemetnation of AGI controller tests using the electric vehicle charging application. This deliverable is related to work that is conducted in: T4.1
Project method and activity planProject plan outlining order and strucutre of work packages, work breakdown structure, timelines, due dates, review procedures. The PMP will also include a schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks. This report is related to work that is conducted in: T1.1
Topologies for common AGI of the identified combinationsD3.1 outlines the topology and high level common features of the most prominent means to integrate storage with end use and generation applications to provide advanced grid integration. The prioritised options will be based on outcomes of aliterature survey and industry engagement activities. This deliverable is related to work that is conducted in: T3.1, 3.2
Project plan outlining order and structure of work packages, work breakdown structure, timelines, due dates, review procedures. The PMP will also include a schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks. This deliverable is related to work that is conducted in: T1.1.
Publicaciones
Autores:
Häberle, Verena; He, Xiuqiang; Huang, Linbin; Prieto-Araujo, Eduardo; Dörfler, Florian
Publicado en:
IEEE Transactions on Power Systems, 2024, ISSN 1558-0679
Editor:
IEEE
DOI:
10.48550/arxiv.2401.17793
Autores:
Häberle, Verena; Huang, Linbin; He, Xiuqiang; id_orcid0000-0002-3755-7553; Prieto-Araujo, Eduardo; Smith, Roy; id_orcid0000-0002-8139-4683; Dörfler, Florian; id_orcid0000-0002-9649-5305
Publicado en:
2023 IEEE 62nd Conference on Decision and Control (CDC), 2023, ISSN 2576-2370
Editor:
IEEE
DOI:
10.48550/arxiv.2305.00192
Autores:
N. Wiese; B. Karadag; M. Braun
Publicado en:
2023, ISBN 978-1-83953-966-4
Editor:
IET
DOI:
10.1049/icp.2023.2780
Autores:
Verena Häberle; Linbin Huang; Xiuqiang He; Eduardo Prieto-Araujo; Florian Dörfler
Publicado en:
Electric Power Systems Research, 234, 2024, ISSN 0378-7796
Editor:
Elsevier BV
DOI:
10.3929/ethz-b-000680807