Leistungen
Software source code of the components developed in tasks T3.1, T3.2, T3.3, and T3.4 is delivered and made public at the end of each cycle in a single deliverable.
Cognit Serverless Platform - Software Source - aSoftware source code of the components developed in tasks T4.1, T4.2, T4.3, and T4.4 is delivered and made public at the end of each cycle in a single deliverable.
Cognit Serverless Platform - Software Source - bSoftware source code of the components developed in tasks T4.1, T4.2, T4.3, and T4.4 is delivered and made public at the end of each cycle in a single deliverable.
Cognit FaaS Model - Software Source - bSoftware source code of the components developed in tasks T3.1, T3.2, T3.3, and T3.4 is delivered and made public at the end of each cycle in a single deliverable.
Cognit Framework - Software Source - aThe technology developed in WP3 and WP4 will be integrated and distributed in two intermediary versions, and one final version at the end of the Project. The software release will include guides for users and integrators.
A single Report delivered at the end of each cycle that summarizes the research and development design performed in tasks T3.1, T3.2, T3.3, and T3.4.
Cognit Framework - Architecture - cD2.[1,2,3,4,5,6]. Cognit Framework Architecture - [a,b,c,d,e,f] (R) (M3, M9, M15, M21, M27, M33)The main version of this deliverable will be released at the end of start phase (M3), with the analysis of use case requirements (T2.1), sovereignty, sustainability, interoperability and security requirements (T2.2), programming model (T2.3), framework architecture (T2.4), and verification (T2.5). The Project will generate incremental releases at the end of each 6-month research cycle (M9, M15, M21, M27, M33) with updates if any in use cases (T2.1), sovereignty, sustainability, interoperability, security requirements (T2.2), and Verification (T2.5).
Use Cases - Scientific Report - cThe first version of this deliverable will be released at the end of start phase (M3) with the use case requirements. The Project will then generate incremental releases at the end of each 6-month research cycle (M9, M15, M21, M27, M33) with updates (if any) in requirements, a description of the open source integration and certification process, and a description of the research, development, and validation done in the cycle.
Communication and Dissemination Plan and Report - bThis document provides information about the Project communication and dissemination plan including the specification of the target dissemination groups, the publication policy, event planning, and marketing. It also reports the dissemination activities that will take place throughout the Project. It is an ongoing deliverable with subsequent, updated versions to be produced in M18 and M36.
Cognit Serverless Platform - Scientific Report - bA single Report delivered at the end of each cycle that summarizes the research and development design performed in tasks T4.1, T4.2, T4.3, and T4.4.
Use Cases - Scientific Report - bThe first version of this deliverable will be released at the end of start phase (M3) with the use case requirements. The Project will then generate incremental releases at the end of each 6-month research cycle (M9, M15, M21, M27, M33) with updates (if any) in requirements, a description of the open source integration and certification process, and a description of the research, development, and validation done in the cycle.
Cognit FaaS Model - Scientific Report - bA single Report delivered at the end of each cycle that summarizes the research and development design performed in tasks T3.1, T3.2, T3.3, and T3.4.
Data and Research Outputs Management Plan - bThe Project will develop a detailed data management plan (DMP) for making the data/research outputs findable, accessible, interoperable, and reusable (FAIR) as a deliverable in month M6, and will be revised towards the end of the Project’s lifetime in months M18 and M36.
Communication and Dissemination Plan and Report - aThis document provides information about the Project communication and dissemination plan including the specification of the target dissemination groups, the publication policy, event planning, and marketing. It also reports the dissemination activities that will take place throughout the Project. It is an ongoing deliverable with subsequent, updated versions to be produced in M18 and M36.
Data and Research Outputs Management Plan - aThe Project will develop a detailed data management plan (DMP) for making the data/research outputs findable, accessible, interoperable, and reusable (FAIR) as a deliverable in month M6, and will be revised towards the end of the Project’s lifetime in months M18 and M36.
Use Cases - Scientific Report - aThe first version of this deliverable will be released at the end of start phase (M3) with the use case requirements. The Project will then generate incremental releases at the end of each 6-month research cycle (M9, M15, M21, M27, M33) with updates (if any) in requirements, a description of the open source integration and certification process, and a description of the research, development, and validation done in the cycle.
Cognit Framework - Architecture - aD2.[1,2,3,4,5,6]. Cognit Framework Architecture - [a,b,c,d,e,f] (R) (M3, M9, M15, M21, M27, M33)The main version of this deliverable will be released at the end of start phase (M3), with the analysis of use case requirements (T2.1), sovereignty, sustainability, interoperability and security requirements (T2.2), programming model (T2.3), framework architecture (T2.4), and verification (T2.5). The Project will generate incremental releases at the end of each 6-month research cycle (M9, M15, M21, M27, M33) with updates if any in use cases (T2.1), sovereignty, sustainability, interoperability, security requirements (T2.2), and Verification (T2.5).
Cognit Serverless Platform - Scientific Report - aA single Report delivered at the end of each cycle that summarizes the research and development design performed in tasks T4.1, T4.2, T4.3, and T4.4.
Demo of the Cognit Platform in the deployment of the use cases at different stages.
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor